Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 12
Mostly Sunny then Slight Chance Showers And Thunderstorms
87° 61°

Mostly Sunny then Slight Chance Showers And Thunderstorms

💨 15 mph 💧 18%

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.20.27 AM

Sheriff’s Office Reports Crime Down 10%, Cites Body Cam Footage as Main Challenge of Safety Act

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Sheriff's Office reported a nearly 10% overall drop in crime compared to the same...
Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Federal judge grants Illinois restraining order against Trump for Guard deployment

Federal judge grants Illinois restraining order against Trump for Guard deployment

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A federal judge has granted the state of Illinois’ request for a temporary restraining order to prevent...
Illinois quick hits: Another quantum company announced for incentives

Illinois quick hits: Another quantum company announced for incentives

By Jim Talamonti | The Center SquareThe Center Square Another quantum company announced for incentives Another quantum computing company is taking advantage of state incentives to establish its headquarters at...
WATCH: Noem says DHS ‘doubling down’ in Chicago

WATCH: Noem says DHS ‘doubling down’ in Chicago

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The U.S. Department of Homeland Security is getting more property in Chicago for federal law enforcement efforts,...
Illinois gas price drop sparks mileage tax talk, road fund healthy

Illinois gas price drop sparks mileage tax talk, road fund healthy

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – As gas prices fall across Illinois, state and local governments may see a decrease in revenue...
Biden deal with activists limits Trump’s ability to arrest illegal immigrants

Biden deal with activists limits Trump’s ability to arrest illegal immigrants

By Jonathan Bilyk | Legal NewslineThe Center Square A Biden-appointed federal judge has agreed to extend an agreement negotiated between immigrant rights advocates and the administration of former President Joe...
WATCH: US DHS looking to buy more property in Chicago for Trump law enforcement efforts

WATCH: US DHS looking to buy more property in Chicago for Trump law enforcement efforts

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The federal government is looking into buying more property in Chicago to continue conducting federal law enforcement...
Hundreds of National Guard activated in Illinois

Hundreds of National Guard activated in Illinois

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Hundreds of National Guard soldiers are activated in Illinois for the next two months to assist in...
Illinois quick hits: Texas Guard arrives in Broadview; former governors join case against Trump

Illinois quick hits: Texas Guard arrives in Broadview; former governors join case against Trump

By The Center SquareThe Center Square Texas Guard arrives in Broadview Just as a federal judge prepares to hear arguments Thursday morning about the use of the National Guard in...
Officials, police criticize Chicago ICE stand-down; CPD says officers responded

Officials, police criticize Chicago ICE stand-down; CPD says officers responded

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois lawmakers and police are outraged after reports that Chicago officers were ordered to stand down...
WATCH: Pritzker tells Trump ‘come and get me;’ SCOTUS hears ballot counting case

WATCH: Pritzker tells Trump ‘come and get me;’ SCOTUS hears ballot counting case

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares reaction to...
Screenshot 2025-10-17 at 1.51.22 PM

Deniz Aslan Appointed Interim Director of Curriculum at Summit Hill 161

Summit Hill School District 161 Board Meeting | September 17, 2025 Article Summary: The Summit Hill District 161 Board of Education appointed longtime educator Deniz Aslan as the Interim Director...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Public Library District for August 28, 2025

The Frankfort Public Library District Board of Trustees approved its budget for the upcoming fiscal year, advanced a long-awaited reading room renovation, and authorized spending on key facility maintenance projects...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District Board of Trustees for August 19, 2025

The Frankfort Fire Protection District Board of Trustees made a firm financial commitment to its pursuit of a future tax referendum at its meeting on Tuesday, August 19, 2025. The...