Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 12
Mostly Sunny then Slight Chance Showers And Thunderstorms
87° 61°

Mostly Sunny then Slight Chance Showers And Thunderstorms

💨 5 to 15 mph 💧 18%

Leave a Comment





Latest News Stories

Screenshot

Lincoln-Way 210 Prepares for “Retirement Wave” with Focus on Recruitment

Article Summary: Lincoln-Way High School District 210 is bracing for a significant number of retirements, with 47 teachers expected to leave over the next four years, representing nearly a quarter of...
Meeting Briefs

Meeting Summary and Briefs: Frankfort School District 157-C for August 12, 2025

The Frankfort School District 157-C Board of Education focused on future planning during its meeting on Tuesday, August 12, 2025, with a detailed presentation of its 2025-2026 Annual Plan. The...
frankfort-square-park-district.2

Frankfort Square Park District Receives Clean Bill of Health in Annual Financial Audit

Article Summary: The Frankfort Square Park District Board of Commissioners formally accepted the district's annual financial audit for the fiscal year ending April 30, 2025, which found no areas of...
frankfort township graphic

Frankfort Highway Department Plans Levy Increase to Replace Aging Trucks

Article Summary: Frankfort Township residents can expect an increase in the highway department's property tax levy this year, which will be used to replace two trucks that are two decades old....
lincoln way school district 210 logo.2

Lincoln-Way Board Weighs Community Solar Program Promising $155,000 in Annual Savings

Article Summary: The Lincoln-Way District 210 board is considering a 20-year agreement to participate in a state-sponsored community solar program that could save the district an estimated $155,000 annually on electricity...
WCO 2025-09-27 at 9.04.56 AM

Will County Reverses Zoning on Peotone Farmland to Facilitate 10-Acre Sale

Article Summary: The Will County Board unanimously approved a request to rezone a 10.08-acre portion of a property in Will Township back to agricultural use, reversing a 2023 zoning change....
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for September 10, 2025

Joliet Junior College Board of Trustees Meeting | September 2025 The Joliet Junior College (JJC) Board of Trustees approved a landmark agreement with the City of Joliet to explore a...
Everyday Economics: Jobs, Waller and whether the Fed can thread the needle

Everyday Economics: Jobs, Waller and whether the Fed can thread the needle

By Orphe DivounguyThe Center Square Last week, new Federal Reserve Governor Stephen Miran defended his lone dissent in favor of faster, deeper interest rate cuts. His argument: “Nonmonetary forces” (tariffs,...
Attack at Michigan church leaves multiple casualties

Attack at Michigan church leaves multiple casualties

By Elyse ApelThe Center Square At least three are dead, including the gunman, following an attack at a church in Michigan on Sunday morning. The attack was at the Church...
Frankfort-Township-Logo-Graphic

Frankfort Township Board Grants Supervisor Authority to Negotiate Real Property Development

Article Summary: The Frankfort Township Board of Trustees has unanimously passed a resolution granting Supervisor Nick George the authority to negotiate the development of township-owned real property. This move empowers the...
What happens if the government shuts down?

What happens if the government shuts down?

By Thérèse BoudreauxThe Center Square Unless Republicans and Democrats break their negotiations stalemate, the federal government will partially shut down on Oct. 1, furloughing hundreds of thousands of federal employees...
Screenshot

Lincoln-Way 210 Board Approves $172.7 Million Budget with Planned Deficit for Bus Purchases

Article Summary: The Lincoln-Way Community High School District 210 Board of Education approved the Fiscal Year 2026 budget, which includes a planned operating deficit of $814,000 to accommodate the purchase of...
Lawmakers push for transit reform, funding despite delayed fiscal cliff

Lawmakers push for transit reform, funding despite delayed fiscal cliff

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois lawmakers say they hope to pass transit legislation during the fall veto session next month, even...
frankfort-park-district

Frankfort Park District Utilizes Federal ARPA Funds for HVAC Upgrades

Article Summary: The Frankfort Park District is leveraging a Will County ARPA grant to fund major infrastructure needs, having already been reimbursed $72,500 for a new HVAC system at Founders...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Village Board for September 22, 2025

The Frankfort Village Board took a notably strict stance on zoning matters on Monday, September 22, 2025, denying two significant residential variance requests for a greenhouse and a pool that...