Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 12
Slight Chance Showers And Thunderstorms
87° 61°

Slight Chance Showers And Thunderstorms

💨 15 mph 💧 19%

Leave a Comment





Latest News Stories

Report: State reliance on federal funds up significantly since 1990s

Report: State reliance on federal funds up significantly since 1990s

By Tate MillerThe Center Square States rely on federal dollars more than they have in modern history, according to a new report, with one of the report’s authors saying such...
Southwest low on list of safest states; Northeast at the top

Southwest low on list of safest states; Northeast at the top

By Dave MasonThe Center Square The Northeast corner is the safest part of the U.S., according to a new WalletHub study. The Southwest? Not so much. Issues such as high...
Washington state attorney general agrees to protect seal of confession

Washington state attorney general agrees to protect seal of confession

By Tim ClouserThe Center Square The Washington State Attorney General's Office reported on Friday that it has reached an agreement with the Catholic Church over a new abuse reporting law....
Pacific Northwest journalists sound off on Antifa at President Trump’s roundtable

Pacific Northwest journalists sound off on Antifa at President Trump’s roundtable

By Carleen JohnsonThe Center Square Journalists from the Pacific Northwest took part in President Donald Trump’s Wednesday roundtable discussion on Antifa that included top cabinet officials and other independent members...
Nvidia will pay 100k visa fees, others unsure

Nvidia will pay 100k visa fees, others unsure

By Andrew RiceThe Center Square Nvidia CEO Jensen Huang said his company would pay $100,000 fees for H-1B visas imposed by the Trump administration. On Sept. 19, President Donald Trump...
'Shameful:' GOP leaders frustrated with Dems on tenth day of shutdown

‘Shameful:’ GOP leaders frustrated with Dems on tenth day of shutdown

By Thérèse BoudreauxThe Center Square U.S. senators have left town for the weekend and will not vote again on a federal funding bill until Tuesday, meaning the ongoing government shutdown...
Trump snubbed by Nobel Committee, praised by winner

Trump snubbed by Nobel Committee, praised by winner

By Sarah Roderick-FitchThe Center Square After being credited for ending seven wars, President Donald Trump was snubbed for the Nobel Peace Prize. Trump, who accumulated several high-profile nominations for the...
Screenshot 2025-10-10 at 11.39.44 AM

Will County Committee Approves Preliminary $161.6M Tax Levy on Split Vote Amid Heated Debate Over Spending

Will County Finance Committee Meeting October 7, 2025 Article Summary: The Will County Finance Committee on Tuesday narrowly approved a preliminary $161.6 million property tax levy for 2025, which projects...
Screenshot 2025-10-10 at 11.36.42 AM

Will County Eyes Major Overhaul to Consolidate Scattered Government Offices

Will County Capital Improvements & IT Committee Meeting October 7, 2025 Article Summary: Will County officials are formally debating a new facilities master plan to address aging buildings and dozens...
Trump threatens tariffs on China over 'hostile' rare earths policy

Trump threatens tariffs on China over ‘hostile’ rare earths policy

By Brett RowlandThe Center Square President Donald Trump threatened a "massive increase" in tariffs on products from China after Beijing tightened export controls on rare earth minerals critical to advanced...
Illinois legislator urges school discipline to focus on behavior, not race

Illinois legislator urges school discipline to focus on behavior, not race

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – McLean County Unit 5 submits a new discipline plan under state law after racial disparities are...
WATCH: Trump appeals Guard TRO as DHS looks to ‘double down’ law enforcement in Chicago

WATCH: Trump appeals Guard TRO as DHS looks to ‘double down’ law enforcement in Chicago

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop reviews the latest...
Illinois quick hits: Trump appeals judge's Guard order; ICE fence ordered down in Broadview

Illinois quick hits: Trump appeals judge’s Guard order; ICE fence ordered down in Broadview

By Jim Talamonti | The Center SquareThe Center Square Trump appeals judge's Guard order The Trump administration has appealed a federal judge’s temporary restraining order and preliminary injunction blocking the...
Trump administration appeals Illinois TRO blocking National Guard deployment

Trump administration appeals Illinois TRO blocking National Guard deployment

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Trump administration is appealing a federal judge’s temporary restraining order and preliminary injunction blocking the administration’s...
Screenshot 2025-10-17 at 1.51.14 PM

District 161 to Charter New Special Scouting Unit for Students with Disabilities

Summit Hill School District 161 Board Meeting | September 17, 2025 Article Summary: The Summit Hill District 161 Board of Education voted to become the charter organization for a new...