Frankfort Village Board Meeting Graphic

Frankfort Commits $555,000 in Motor Fuel Tax Funds to Aberdeen Road Bridge

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, adopted a resolution appropriating $555,000 in Motor Fuel Tax funds for professional engineering services tied to replacing the Aberdeen Road bridge in the Prestwick subdivision — a project the mayor said is expected to cost roughly $4 million overall.

Aberdeen Road Bridge Key Points:

  • The resolution authorizes the mayor and clerk to execute a state-required IDOT Resolution for Improvement and Local Public Agency Engineering Services Agreement, appropriating $555,000 in Motor Fuel Tax funds for engineering.
  • The work covers design engineering for replacing Structure 099-6017 on Aberdeen Road over a tributary of Hickory Creek (state Section No. 26-00058-00-BR).
  • Robinson Engineering, Ltd., is the prime consultant, with HW Lochner, Inc., handling bridge design; the broader project is estimated at about $4 million.
  • An Aberdeen Road resident used public comment to ask for a timeline; Mayor Keith Ogle said there is no hard date yet.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, took its next step toward replacing the Aberdeen Road bridge, adopting a resolution that appropriates $555,000 in Motor Fuel Tax funds for engineering work on the project.

The measure, presented by Trustee Dan Rossi and approved as part of the board’s 5-0 consent agenda, authorizes Mayor Keith Ogle and Village Clerk Katie Schubert to execute an Illinois Department of Transportation Resolution for Improvement under the Illinois Highway Code and a Local Public Agency Engineering Services Agreement. According to the packet, IDOT requires local governments to adopt those documents before tapping Motor Fuel Tax funds for eligible engineering and construction work.

The funds cover professional engineering services for the replacement of the bridge, which carries Aberdeen Road over a tributary of Hickory Creek within the Prestwick subdivision. State documents in the packet identify the span as Structure No. 099-6017 and the work as design engineering under Section No. 26-00058-00-BR. The village has budgeted Motor Fuel Tax funds for the project.

The packet shows Robinson Engineering, Ltd., serving as prime consultant on the engineering services agreement, with HW Lochner, Inc., responsible for the bridge design as a sub-consultant. The scope of work reaches well beyond drafting plans: it includes hydraulic modeling aimed at a “zero” rise in flood profiles, a floodway construction permit application to the Illinois Department of Natural Resources’ Office of Water Resources, wetland delineation by sub-consultant V3 Companies, and geotechnical work by sub-consultant Geocon Professional Services that calls for two soil borings down to bedrock — estimated at roughly 80 feet deep.

The bridge surfaced again during public comment, when a resident of Aberdeen Road approached the podium to ask for an update. Ogle said the board had that night passed the resolution authorizing the use of Motor Fuel Tax money and that the engineering firms were continuing their work, but he acknowledged the village does not yet have a firm timeline.

“We do not have a hard date at this point,” Ogle said, telling the resident the village remains “full force forward to get it done.”

The mayor put the overall scope in context, saying the broader effort is expected to cost about $4 million. He explained that a temporary bridge must be installed before the permanent replacement can be built. “It’s a complicated, expensive thing, but we are moving forward on all of this,” Ogle said.

Leave a Comment





Latest News Stories

new-lenox-fire-district-stations.3

New Lenox Fire District to Launch Comfort Dog Program for First Responders, Community

NEW LENOX – The New Lenox Fire Protection District is adding a four-legged member to its team after the Board of Trustees unanimously approved the creation of a new comfort...
new-lenox-library.2-1

Library’s ‘Studio’ Draws Record Crowds with New Tech and Creative Programs

NEW LENOX – The New Lenox Public Library’s creative hub, The Studio, is experiencing a surge in popularity, shattering attendance records and successfully launching new technology-driven programs, according to a...
New-Lenox-School-122.5

D122 to Spend $24,950 on Professional Enrollment Forecast

New Lenox School District 122 will hire an outside firm to conduct a comprehensive, 10-year enrollment forecast at an estimated cost of $24,950. The Board of Education approved an agreement...
frankfort illinois library logo graphic.1

Frankfort Library Secures $83K Grant for Reading Room, Financial Report Shows Strong Position

FRANKFORT, IL – The Frankfort Public Library is poised to begin its next major renovation after the State Library confirmed it has qualified for a matching grant of up to...
frankfort illinois library logo graphic.5

Frankfort Library Considers Limiting Digital Access on Educator Cards to Manage Costs

FRANKFORT, IL – The Frankfort Public Library is exploring a change to its digital lending policies for local educators to manage the rising costs and high demand for popular streaming...
frankfort illinois library logo graphic.1

Newly Appointed Trustee Brooks Stenoish Takes Oath, Finalizing Frankfort Library Board

FRANKFORT, IL – The Frankfort Public Library District Board of Trustees is now at its full seven-member strength after newly appointed trustee Brooks Stenoish was officially sworn in at Thursday...
Meeting-Briefs

Meeting Summary: Frankfort Public Library District for June 26, 2025

The Frankfort Public Library District Board of Trustees held its regular monthly meeting on Thursday. The board swore in its newest member, reviewed a strong year-end financial report, and approved...
JJC-Graphic-Logo

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement

The Joliet Junior College Board of Trustees on Wednesday approved a $322.3 million budget for fiscal year 2026, but not before a tense debate that saw a motion to postpone...
Screenshot-2025-07-06-at-9.50.39-AM

Lincoln Way District 210 Approves $2.1 Million Budget Amendment, Maintains Strong Financial Position

Lincoln Way Community High School District 210 board members unanimously approved an amended fiscal year 2025 budget Thursday night that increases the district's operating surplus to $2.1 million while maintaining...
Joliet-Junior-college.-Graphic-Logo.5

JJC’s ‘12x12x12’ Initiative Boosts College Credits, Increases Matriculation Rate

Joliet Junior College’s ambitious "12x12x12" initiative is yielding significant results, leading to more high school students earning college credits and a greater percentage of them choosing to attend JJC after...
Screenshot-2025-07-06-at-9.45.35-AM

District 210 Approves Administrative Restructuring, Staff Salary Increases

Lincoln Way Community High School District 210 board members approved administrative restructuring and salary increases for non-union clerical support staff during closed session actions Thursday night. The board unanimously approved...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct

An otherwise routine vote to approve monthly bill payments ignited a tense exchange at the Joliet Junior College Board of Trustees meeting Wednesday, revealing ongoing friction over redacted legal invoices,...
Joliet-Junior-college.-Graphic-Logo.3

Students, Trustees Emphasize Importance of Inclusivity and Flag Raisings at JJC

From a recent graduate’s public plea to trustee remarks on federal policies, the theme of student belonging and inclusivity was a prominent thread at the Joliet Junior College Board of...
Meeting-Briefs

L-W School Board June 26 Meeting Briefs

Special Education District Update: The fence installation around the playground at Lincoln Way Area Special Education District 843 has been completed except for one gate section that will allow equipment...
Joliet-Junior-college.-Graphic-Logo.2

JJC Embarks on New 10-15 Year Facilities Master Plan Process

Joliet Junior College is laying the groundwork for its physical future, officially launching a comprehensive process to create a new facilities master plan that will guide campus development for the...