Frankfort Village Board Meeting Graphic

Frankfort Commits $555,000 in Motor Fuel Tax Funds to Aberdeen Road Bridge

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, adopted a resolution appropriating $555,000 in Motor Fuel Tax funds for professional engineering services tied to replacing the Aberdeen Road bridge in the Prestwick subdivision — a project the mayor said is expected to cost roughly $4 million overall.

Aberdeen Road Bridge Key Points:

  • The resolution authorizes the mayor and clerk to execute a state-required IDOT Resolution for Improvement and Local Public Agency Engineering Services Agreement, appropriating $555,000 in Motor Fuel Tax funds for engineering.
  • The work covers design engineering for replacing Structure 099-6017 on Aberdeen Road over a tributary of Hickory Creek (state Section No. 26-00058-00-BR).
  • Robinson Engineering, Ltd., is the prime consultant, with HW Lochner, Inc., handling bridge design; the broader project is estimated at about $4 million.
  • An Aberdeen Road resident used public comment to ask for a timeline; Mayor Keith Ogle said there is no hard date yet.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, took its next step toward replacing the Aberdeen Road bridge, adopting a resolution that appropriates $555,000 in Motor Fuel Tax funds for engineering work on the project.

The measure, presented by Trustee Dan Rossi and approved as part of the board’s 5-0 consent agenda, authorizes Mayor Keith Ogle and Village Clerk Katie Schubert to execute an Illinois Department of Transportation Resolution for Improvement under the Illinois Highway Code and a Local Public Agency Engineering Services Agreement. According to the packet, IDOT requires local governments to adopt those documents before tapping Motor Fuel Tax funds for eligible engineering and construction work.

The funds cover professional engineering services for the replacement of the bridge, which carries Aberdeen Road over a tributary of Hickory Creek within the Prestwick subdivision. State documents in the packet identify the span as Structure No. 099-6017 and the work as design engineering under Section No. 26-00058-00-BR. The village has budgeted Motor Fuel Tax funds for the project.

The packet shows Robinson Engineering, Ltd., serving as prime consultant on the engineering services agreement, with HW Lochner, Inc., responsible for the bridge design as a sub-consultant. The scope of work reaches well beyond drafting plans: it includes hydraulic modeling aimed at a “zero” rise in flood profiles, a floodway construction permit application to the Illinois Department of Natural Resources’ Office of Water Resources, wetland delineation by sub-consultant V3 Companies, and geotechnical work by sub-consultant Geocon Professional Services that calls for two soil borings down to bedrock — estimated at roughly 80 feet deep.

The bridge surfaced again during public comment, when a resident of Aberdeen Road approached the podium to ask for an update. Ogle said the board had that night passed the resolution authorizing the use of Motor Fuel Tax money and that the engineering firms were continuing their work, but he acknowledged the village does not yet have a firm timeline.

“We do not have a hard date at this point,” Ogle said, telling the resident the village remains “full force forward to get it done.”

The mayor put the overall scope in context, saying the broader effort is expected to cost about $4 million. He explained that a temporary bridge must be installed before the permanent replacement can be built. “It’s a complicated, expensive thing, but we are moving forward on all of this,” Ogle said.

Leave a Comment





Latest News Stories

Will-County-Capital-Improvements-IT-Committee-Meeting-July-1-2025

Will County’s Major Capital Projects Hit Key Milestones, VAC Buildout on “Aggressive Schedule”

Will County is making significant headway on several major capital improvement projects, with the new Veterans Assistance Commission (VAC) & Support Center in Joliet on an “aggressive schedule” for a...
Will-County-Public-Works-Transportation-Committee-Meeting-July-1-2025

County Board Approves 2026-2031 Transportation Plan Despite Project Opposition

Will County board members approved a contested five-year transportation improvement plan Tuesday after heated debate over a controversial Homer Glen road project that has drawn sustained community opposition. The Will...
Will-County-Planning-and-Zoning-Commission-Meeting-July-1-2025

Contentious I-3 Rezoning for DuPage Township Storage Yard Narrowly Advances

A proposal to rezone a 20-acre parcel in DuPage Township from agricultural to the county's most intensive industrial classification narrowly earned a recommendation for approval from the Will County Planning...
Meeting-Briefs

Will County Legislative Committee July 1 Meeting Briefs

Federal Budget Impact: Will County could face significant funding challenges if federal budget reconciliation measures reduce Medicaid and SNAP benefits. The county health department and social services rely heavily on...
Will-County-Finance-Committee-Meeting-July-1-2025

County Moves Forward with $200.8 Million Bond Refinancing Plan

Will County Finance Committee members on July 1 approved moving forward with a comprehensive bond refinancing ordinance that could save taxpayers more than $716,000 over the life of the bonds...
Will-County-Public-Works-Transportation-Committee-Meeting-July-1-2025

Access Will County Dial-a-Ride Program Sees Record Growth, Eyes Expansion

Will County's dial-a-ride transportation service for seniors and disabled residents reached record ridership levels while officials plan major expansion to cover all county townships. The Access Will County program served...
Will-County-Capital-Improvements-IT-Committee-Meeting-July-1-2025

Will County to Launch New Public Meeting Agenda System in August Amidst Data Conversion Concerns

Will County is set to launch its new public meeting agenda and records software, Granicus “OneMeeting,” in August, but the transition will see over a decade of historical records converted...
Will-County-Planning-and-Zoning-Commission-Meeting-July-1-2025

Green Garden Township Poised for First Major Subdivision in Years After Rezoning

The Will County Planning and Zoning Commission has recommended a rezoning that could pave the way for the first major residential subdivision in Green Garden Township in nearly two decades....
Will-County-Finance-Committee-Meeting-July-1-2025

County RNG Facility Shows Strong Performance Despite Solar Challenges

Will County's Renewable Natural Gas facility is exceeding production targets while officials explore options to reduce substantial electricity costs that currently impact profitability. Project manager Greg Komperda told Finance Committee...
Meeting-Briefs

PZC Briefs: Solar Farm in Crete, Post-Fire Permit for Troy Business, and More

The Will County Planning and Zoning Commission handled several other cases during its July 1 meeting, including a new solar farm, a temporary permit for a fire-damaged business, and routine...
Meeting-Briefs

In Brief: Capital & IT News

Here are other highlights from the Will County Capital Improvements & IT Committee meeting on Tuesday. Successful Fire Drill at County BuildingThe Will County Office Building held its first full...
Meeting-Briefs

Will County Finance Committee July 1 Meeting Briefs

Bond Refinancing Advances: Finance Committee approved an ordinance authorizing up to $200.8 million in bond refinancing that could save taxpayers more than $716,000. The measure moves to the full County...
Meeting-Briefs

Will County Public Works Committee Juliy 1 Meeting Briefs

ROAD CONTRACTS APPROVED Austin Tyler Construction Contract: The committee approved a $691,544 contract with Austin Tyler Construction for resurfacing River Road from East Frontage Road to Prairie Creek Bridge and...
About Us Website Header - 1

New Lenox Library Board Seats New Trustees, Reorganizes After Election

NEW LENOX – The New Lenox Public Library District Board of Trustees officially seated its newly elected members and reorganized its leadership and committee assignments for the new term at...
New-Lenox-School-122.3

New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects

The New Lenox School District 122 Board of Education has approved a comprehensive list of 56 maintenance and capital improvement projects to be completed over the summer, allocating a total...