Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Wed Jun 17
Partly Sunny
71° 54°

Partly Sunny

💨 10 to 15 mph 💧 8%

Leave a Comment





Latest News Stories

Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Americans for Prosperity Illinois says megaprojects legislation that cleared the Illinois House could give a proposed development...
Soldier's insider trading case puts prediction markets to the test

Soldier’s insider trading case puts prediction markets to the test

By Brett RowlandThe Center Square An alleged attempt by a U.S. Army Special Forces soldier to profit from classified military intelligence on a prediction market platform has resulted in the...
U.S. will continue blockade 'as long as it takes,' Hegseth says

U.S. will continue blockade ‘as long as it takes,’ Hegseth says

By Andrew RiceThe Center Square The United States will continue it's blockade in the Strait of Hormuz for "as long as it takes," War Secretary Pete Hegseth said on Friday....
Will County Board Graphic.03

Will County Takes Jurisdiction of Countyline Road in $1.84 Million Agreement with Kankakee County

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board has approved a jurisdictional transfer that brings a 4.27-mile stretch of Countyline Road entirely under Will...
Will County Board Graphic.01

Green Garden Township’s Wildflower Farm Granted Third Special Use Extension

Will County Board Meeting | April 16, 2026 Article Summary: Bengston Land Management, LLC secured a third extension on its special use permit to host rural events at The Wildflower...
Gori seeks quick end to asbestos fraud, lawsuit ‘bounties' case

Gori seeks quick end to asbestos fraud, lawsuit ‘bounties’ case

By Jonathan Bilyk | Legal NewslineThe Center Square The Gori Law Firm, considered America’s most prolific filer of asbestos personal injury lawsuits, has pushed back on claims it engaged in...
Texas Ten Commandments law may reach Supreme Court

Texas Ten Commandments law may reach Supreme Court

By Esther WickhamThe Center Square A federal appeals court ruling upholding a Texas law requiring Ten Commandments displays in public school classrooms is setting up a potential challenge before the...
Feds reopen probe into LAUSD race-based program

Feds reopen probe into LAUSD race-based program

By Esther WickhamThe Center Square The U.S. Department of Education’s Office for Civil Rights has reopened an investigation into the Los Angeles Unified School District’s Black Student Achievement Plan following...
Trump won't be rushed on Iran as clock ticking for the regime

Trump won’t be rushed on Iran as clock ticking for the regime

By Sarah Roderick-FitchThe Center Square Time is ticking for Iran, as President Donald Trump says he won’t be rushed into giving a timeline regarding the conflict and ceasefire with Iran....
Multiple House Republicans defy proposed 3-year FISA Section 702 extension

Multiple House Republicans defy proposed 3-year FISA Section 702 extension

By Thérèse BoudreauxThe Center Square After two attempts last week to reauthorize a controversial spy power of the federal government, House Speaker Mike Johnson, R-La., has unveiled the text of...
Fetterman wants SNAP to cover hot rotisserie chicken

Fetterman wants SNAP to cover hot rotisserie chicken

By John ColeThe Center Square U.S. Sen. John Fetterman, D-Pa., and three of his colleagues have introduced a bill that would allow beneficiaries in the Supplemental Nutrition Assistance Program, or...
Advocates warn of looming debt crisis

Advocates warn of looming debt crisis

By Andrew RiceThe Center Square Advocates warned on Thursday the U.S. economy is not growing fast enough to keep pace with the national debt. Ryan Clancy, chief strategist at No...
Teens charged after FBI says plot targeting Houston synagogue, school foiled

Teens charged after FBI says plot targeting Houston synagogue, school foiled

By Bethany BlankleyThe Center Square Two female teenagers have been charged in connection to what authorities say was a plot to commit a terrorist attack against a Jewish synagogue and...
Regeneron joins pharmaceutical companies offering most-favored-nation pricing

Regeneron joins pharmaceutical companies offering most-favored-nation pricing

By Morgan SweeneyThe Center Square Regeneron is the latest pharmaceutical manufacturer to make a deal with the administration to offer some of their drugs at most-favored-nation pricing. Now, 17 of...
AI polling: Americans aren't as divided on declaration of American ideals

AI polling: Americans aren’t as divided on declaration of American ideals

By Morgan SweeneyThe Center Square In honor and ahead of America’s 250th birthday, polling and analysis organization the Napolitan Institute released a “declaration” of 27 shared American ideals Thursday based...