Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Wed Jun 17
Partly Sunny
71° 54°

Partly Sunny

💨 10 to 15 mph 💧 8%

Leave a Comment





Latest News Stories

Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Approves Pavlov Media Fiber Optic Hub Lease in Exchange for Municipal Internet Service

Frankfort Village Board Meeting | April 20, 2026 Article Summary: The Village entered into a 10-year lease agreement allowing Pavlov Media to construct a fiber optic hub on municipal property,...

Everyday Economics: Housing sets the stage, but the Fed, PCE are the main event

By Orphe DivounguyThe Center Square This week begins with housing, but the real macro story comes later: the Federal Reserve chair’s press conference and the Personal Consumption Expenditures inflation report....
DOJ: Shooting suspect targeted Trump admin officials

DOJ: Shooting suspect targeted Trump admin officials

By Dan McCaleb and Jon StyfThe Center Square The California man accused of storming security at Saturday night's White House Correspondents’ Dinner and shooting a Secret Service officer before being...
23 state AGs demand top ratings agencies explain ESG-driven downgrades

23 state AGs demand top ratings agencies explain ESG-driven downgrades

By Tate MillerThe Center Square Nearly two dozen state attorneys general are asking the three top ratings agencies to explain their “ESG-driven” downgrades of fossil-fuel companies. In a letter to...
Bacon says Pentagon raided housing fund for troop bonuses, demands repayment

Bacon says Pentagon raided housing fund for troop bonuses, demands repayment

By Brett RowlandThe Center Square A retiring Republican congressman plans to confront Defense Secretary Pete Hegseth this week over how $2.6 billion appropriated by Congress for military housing assistance was...
Will County Board Graphic.02

Will County Passes Comprehensive Adult Entertainment Ordinance

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board passed Ordinance 26-133, enacting Chapter 119 of the Business Regulations to establish rigorous licensing, operational, and...
Correspondents' dinner attacker detained with multiple weapons

Correspondents’ dinner attacker detained with multiple weapons

By Jon StyfThe Center Square A California man charged security with multiple weapons at a magnetometer screening area outside the White House Correspondents’ Dinner on Saturday night before he shot...
BREAKING: Trump, cabinet OK after shots fired at White House Correspondents dinner

BREAKING: Trump, cabinet OK after shots fired at White House Correspondents dinner

By Dan McCalebThe Center Square President Donald Trump, First Lady Melania Trump, and members of Trump's cabinet are OK after being rushed out of the White House Correspondents' Association dinner...
frankfort township graphic

Frankfort Township Board Approves Highway Salt Purchase, Restructures Financial Signers

Frankfort Township Board Meeting | March 9, 2026 Article Summary: The Frankfort Township Board unanimously approved a resolution updating its Illinois Fund authorized signers and greenlit the Highway Department's 2026-2027 salt...
U.S. House Republicans face jam-packed week ahead

U.S. House Republicans face jam-packed week ahead

By Thérèse BoudreauxThe Center Square U.S. House Republicans face a daunting legislative to-do list for the week ahead. The Department of Homeland Security has been shut down for more than...
Trump again scraps peace talks with Iran

Trump again scraps peace talks with Iran

By Brett RowlandThe Center Square President Donald Trump called off a planned diplomatic mission to Pakistan on Saturday, refusing to send his team on what he described as an unproductive...
U.S. Supreme Court to hear TPS for Haiti, Syria Wednesday

U.S. Supreme Court to hear TPS for Haiti, Syria Wednesday

By Andrew RiceThe Center Square The U.S. Supreme Court will hear arguments on Wednesday in two cases that could determine the temporary protected status for Haitian and Syrian immigrants. Justices...
Fifth Circuit hands Texas another win on border security law

Fifth Circuit hands Texas another win on border security law

By Bethany BlankleyThe Center Square The Fifth Circuit Court of Appeals handed Texas its third win Friday on border security. As the border crisis escalated during the Biden administration, Gov....
Illinois Rep faces investigation over sexual harassment

Illinois Rep faces investigation over sexual harassment

By Sean Reed | The Center SquareThe Center Square (The Center Square) – A state representative embattled with allegations of sexual harassment returned to Springfield this week after being stripped...
Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Amends Zoning Code to Update Special Use Permits and Downtown Residential Materials

Frankfort Village Board Meeting | April 20, 2026 Article Summary: The Village Board approved a package of text amendments that untether Special Use Permits from the land and establish strict...