The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Today Jun 11
Sunny
80° 61°

Sunny

💨 10 to 15 mph 💧 0%

Leave a Comment





Latest News Stories

Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

By Jim Talamonti | The Center SquareThe Center Square DHS ordered to address ICE facility conditions A U.S. District Court judge in Chicago has issued a temporary restraining order directing...
Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

By Arthur Kane | The Center SquareThe Center Square (The Center Square) – U.S. Reps Darrell Issa, R-Calif., and David Scott, D-Ga., have each had taxpayers pay as much as...
Frankfort School District 157-C.2

State Assessment Shake-up: Frankfort 157-C to Form Committee for New Honors Criteria

Frankfort School District 157-C Meeting | September 2025 Article Summary: Frankfort School District 157-C is adapting to new, less restrictive student assessment benchmarks from the Illinois State Board of Education...
frankfort fire district graphic logo.2

Frankfort Fire District Adopts Updated Fire Codes to Address Solar Power, New Technologies

Frankfort Fire Protection District Meeting | September 2025 Article Summary: The Frankfort Fire Protection District has unanimously adopted a new fire prevention ordinance to modernize safety standards and address emerging...
Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

By Jim Talamonti | The Center SquareThe Center Square $20 million for Alton housing project Gov. J.B. Pritzker and the Illinois Housing Development Authority announced the opening of a $20...

WATCH: Illinois DCFS can’t locate documents showing number of missing children

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Documents to show the number of missing youth in care from the Department of Children and Family...
Will Dial-A-Ride Service

Will County Committee Advances Phased Takeover of Central Will Dial-A-Ride Service

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved a five-year plan to consolidate the Central Will Dial-A-Ride service into its...
Frankfort Mcdonalds

Frankfort Board Denies 24-Hour Drive-Thru Permits for McDonald’s

Frankfort Village Board Meeting | November 3, 2025 Article Summary: The Frankfort Village Board on Monday, November 3, 2025, denied special use permits that would have allowed two local McDonald's...
frankfort illinois library logo graphic.1

Frankfort Library Board Approves 2025 Tax Levies

Frankfort Public Library District Meeting | September 2025 Article Summary: The Frankfort Public Library District Board of Trustees has unanimously approved its 2025 tax levy ordinance and a separate building...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Park District Committee for September 23, 2025

Frankfort Park District Special Committee Meeting | September 23, 2025 The Frankfort Park District Committee on Tuesday reviewed results from a community survey about a proposed indoor recreation center, which...
frankfort-square-park-district.2

Hunter Prairie Park Redevelopment on Track, Four-Year Journey Detailed

Frankfort Square Park District Meeting | September 2025 Article Summary: The Frankfort Square Park District's multi-year redevelopment of Hunter Prairie Park is progressing, with a detailed timeline presented at the...
Frankfort School District 157-C.3

Frankfort 157-C Board Approves $47 Million Budget for 2025-2026 School Year

Frankfort School District 157-C Meeting | September 2025 Article Summary: The Frankfort School District 157-C Board of Education unanimously approved a balanced budget for the 2025-2026 fiscal year, projecting total...
frankfort-park-district

Park District Gathers Sports Group Input for State-Funded Master Plan

Frankfort Park District Special Committee Meeting | September 23, 2025 Article Summary: The Frankfort Park District is actively engaging with local sports organizations to gather feedback for its new master plan,...
frankfort-square-park-district.1

Frankfort Square Park District Issues $136,000 in Bonds, Abates Taxes for Residents

Frankfort Square Park District Meeting | September 2025 Article Summary: The Frankfort Square Park District Board of Commissioners approved issuing $136,000 in new bonds to pay off existing debt and...
Lawmakers introduce bills to slash their own pay during government shutdowns

Lawmakers introduce bills to slash their own pay during government shutdowns

By Thérèse BoudreauxThe Center Square With the ongoing government shutdown dragging on for a record-breaking period of time, U.S. lawmakers are introducing bills to make shutdowns as painful for Congress...