Frankfort Village Board Meeting Graphic

Frankfort Awards $1 Million Water Main Contract, OKs Well #4 Engineering

Spread the love

Frankfort Village Board Meeting | June 15, 2026

Article Summary: The Frankfort Village Board on Monday, June 15, 2026, awarded a $1,013,407.56 water main replacement contract to Iroquois Paving Corporation and approved a $170,000 engineering agreement for upgrades to its Well #4 treatment plant.

Water System Improvements Key Points:

  • Iroquois Paving Corporation won the 2026 Water Main Replacement Program with the lowest of five bids, $1,013,407.56.
  • The project replaces aging mains on St. Andrews Way and Glenbarr Lane in the Prestwick Subdivision, addressing dead-end mains and water-quality issues.
  • The board separately approved a $170,000 lump-sum engineering agreement with Robinson Engineering for Well #4 Iron Removal Water Treatment Plant upgrades.
  • Trustee Maura Rigoni abstained on the Well #4 item, citing her part-time employment with Robinson Engineering.

FRANKFORT — The Frankfort Village Board on Monday, June 15, 2026, advanced two water-system projects on its consent agenda, awarding a roughly $1 million pipe-replacement contract and authorizing engineering work to overhaul an aging treatment plant.

The board adopted a resolution awarding the 2026 Water Main Replacement Program to Iroquois Paving Corporation for $1,013,407.56. The program targets water main improvements on St. Andrews Way and Glenbarr Lane within the Prestwick Subdivision, work the packet says is intended to address both frequent unplanned maintenance and water-quality problems associated with dead-end mains. The village and its consulting engineer, Robinson Engineering, prepared the specifications and opened five bids on May 19, 2026.

Iroquois Paving’s bid came in below the engineer’s $1,380,000 estimate and below all competitors: P.T. Ferro Construction at $1,499,863.90, Steve Spiess Construction at $1,265,605.90, Austin-Tyler Construction at $1,101,323.13 and H. Linden & Sons at $1,216,243.15. Robinson Engineering reviewed the bids and recommended the award to Iroquois Paving as the lowest responsible bidder.

In a separate action, the board adopted a resolution authorizing a $170,000 lump-sum agreement with Robinson Engineering for professional engineering services tied to upgrades at the Well #4 Iron Removal Water Treatment Plant. The facility, located within the Tanglewood Subdivision, was constructed in 2002 as part of a system-wide water-quality effort and now requires significant upgrades due to the age and condition of its equipment, according to the packet.

Before the consent agenda vote, Trustee Maura Rigoni asked that the record reflect her abstention on the Well #4 engineering item, noting that it involves a contract with Robinson Engineering, where she is a part-time employee. Both measures otherwise passed as part of the board’s unanimous consent vote.

Leave a Comment





Latest News Stories

Sufyan Farhan

Frankfort Man Arrested in Gas Station Robbery Found Hiding in McDonald’s Restroom

Article Summary: Sufyan Farhan, 27, was arrested on December 21 following an armed robbery at a Frankfort Circle K. Deputies located the suspect hiding in a nearby McDonald's restroom after...
Screenshot 2025-12-20 at 12.15.16 PM

Village Awards $399,763 Bid for Nebraska Street Pond Dredging

Frankfort Village Board Meeting | December 15, 2025 Article Summary: The Frankfort Village Board on Monday, Dec. 15, 2025, awarded a contract to KLF Enterprises for the mechanical dredging of...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for December 11, 2025

Will County Board Executive Committee Meeting | December 11, 2025 Overall Meeting SummaryThe Will County Board Executive Committee met on Thursday, December 11, 2025, tackling a diverse agenda that included...
Planning & Zoning Graphic.4

New Lenox Homeowner Granted Variance for 4,000-Square-Foot Accessory Space

Will County Planning and Zoning Commission Meeting | December 16, 2025 Article Summary: A New Lenox homeowner received approval to build a large pole barn that exceeds the county's size limits...
Dr. Julian Rogus School copy

District 161 Approves Emergency Boiler Replacement, Cites Past Maintenance Failures

Summit Hill School District 161 Meeting | December 17, 2025 Article Summary: The Summit Hill School District 161 Board has authorized the emergency purchase of two new boilers for Dr....
Will County Board Graphic.03

County Expands Paratransit Services, Board Members Question Long-Term Funding

Will County Board Meeting | December 18, 2025 Article Summary: The Will County Board approved an intergovernmental agreement with Pace to expand paratransit services county-wide for seniors and residents with...
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board for Dec. 10, 2025

Joliet Junior College Board Meeting | Dec. 10, 2025 Meeting Summary The Joliet Junior College Board of Trustees met on Wednesday, December 10, 2025, for a meeting marked by both...
Screenshot 2025-12-20 at 12.26.58 PM

District 210 Awards $24.4 Million Contract for Major HVAC Upgrades

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The District 210 Board of Education awarded a $24.4 million bid to BEAR Construction Company for comprehensive...
Screenshot 2025-12-20 at 12.15.00 PM

The Lakota Group Tapped for Historic Downtown Frankfort Design Study

Frankfort Village Board Meeting | December 15, 2025 Article Summary: The Frankfort Village Board on Monday, Dec. 15, 2025, authorized a professional services agreement with The Lakota Group to conduct...
Will County Board Graphic.02

Mental Health Board Updates Committee on 2026 Grant Cycle and Funding Priorities

Will County Board Executive Committee Meeting | December 11, 2025 Article Summary: The Will County Community Mental Health Board provided a quarterly update, outlining the timeline and strategic priorities for...
summit-hill-junior-high-school-frankfort-161.2

Clean Audit Reveals $8.5 Million Increase in District 161 Net Position

Summit Hill School District 161 Meeting | December 17, 2025 Article Summary: An independent audit of Summit Hill School District 161’s 2024-2025 fiscal year has returned a "clean" opinion, showing...
Will County P&Z Logo Planning Zoning

PZC Approves Homer Township Landscape Business Despite Neighbor Concerns; Adds Berm Condition

Will County Planning and Zoning Commission Meeting | December 16, 2025 Article Summary: The Will County Planning and Zoning Commission approved a special use permit for a new landscape business on...

JJC Foundation Executive Director Retires Following $2.3 Million Estate Gift

Joliet Junior College Board Meeting | Dec. 10, 2025 Article Summary: Longtime Joliet Junior College Foundation Executive Director Kristi Mulvey announced her retirement at her final board meeting, capping a...
Screenshot 2025-12-20 at 12.25.51 PM

Lincoln-Way Board Approves $92.5 Million Tax Levy for 2025

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The Lincoln-Way Community High School District 210 Board of Education officially adopted a $92,522,000 tax levy during...
frankfort-school-district-161.2-e1754272831494

Summit Hill District 161 Board Approves $44.8 Million Tax Levy with Slight Overall Decrease

Summit Hill School District 161 Meeting | December 17, 2025 Article Summary: The Summit Hill School District 161 Board of Education on Tuesday approved a 2025 tax levy that represents...