Frankfort Village Board Meeting Graphic

Frankfort Commits $555,000 in Motor Fuel Tax Funds to Aberdeen Road Bridge

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, adopted a resolution appropriating $555,000 in Motor Fuel Tax funds for professional engineering services tied to replacing the Aberdeen Road bridge in the Prestwick subdivision — a project the mayor said is expected to cost roughly $4 million overall.

Aberdeen Road Bridge Key Points:

  • The resolution authorizes the mayor and clerk to execute a state-required IDOT Resolution for Improvement and Local Public Agency Engineering Services Agreement, appropriating $555,000 in Motor Fuel Tax funds for engineering.
  • The work covers design engineering for replacing Structure 099-6017 on Aberdeen Road over a tributary of Hickory Creek (state Section No. 26-00058-00-BR).
  • Robinson Engineering, Ltd., is the prime consultant, with HW Lochner, Inc., handling bridge design; the broader project is estimated at about $4 million.
  • An Aberdeen Road resident used public comment to ask for a timeline; Mayor Keith Ogle said there is no hard date yet.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, took its next step toward replacing the Aberdeen Road bridge, adopting a resolution that appropriates $555,000 in Motor Fuel Tax funds for engineering work on the project.

The measure, presented by Trustee Dan Rossi and approved as part of the board’s 5-0 consent agenda, authorizes Mayor Keith Ogle and Village Clerk Katie Schubert to execute an Illinois Department of Transportation Resolution for Improvement under the Illinois Highway Code and a Local Public Agency Engineering Services Agreement. According to the packet, IDOT requires local governments to adopt those documents before tapping Motor Fuel Tax funds for eligible engineering and construction work.

The funds cover professional engineering services for the replacement of the bridge, which carries Aberdeen Road over a tributary of Hickory Creek within the Prestwick subdivision. State documents in the packet identify the span as Structure No. 099-6017 and the work as design engineering under Section No. 26-00058-00-BR. The village has budgeted Motor Fuel Tax funds for the project.

The packet shows Robinson Engineering, Ltd., serving as prime consultant on the engineering services agreement, with HW Lochner, Inc., responsible for the bridge design as a sub-consultant. The scope of work reaches well beyond drafting plans: it includes hydraulic modeling aimed at a “zero” rise in flood profiles, a floodway construction permit application to the Illinois Department of Natural Resources’ Office of Water Resources, wetland delineation by sub-consultant V3 Companies, and geotechnical work by sub-consultant Geocon Professional Services that calls for two soil borings down to bedrock — estimated at roughly 80 feet deep.

The bridge surfaced again during public comment, when a resident of Aberdeen Road approached the podium to ask for an update. Ogle said the board had that night passed the resolution authorizing the use of Motor Fuel Tax money and that the engineering firms were continuing their work, but he acknowledged the village does not yet have a firm timeline.

“We do not have a hard date at this point,” Ogle said, telling the resident the village remains “full force forward to get it done.”

The mayor put the overall scope in context, saying the broader effort is expected to cost about $4 million. He explained that a temporary bridge must be installed before the permanent replacement can be built. “It’s a complicated, expensive thing, but we are moving forward on all of this,” Ogle said.

Today Jun 11
Sunny
80° 61°

Sunny

💨 10 to 15 mph 💧 0%

Leave a Comment





Latest News Stories

WCO-PZ-Aug-5.1

Will County Public Works Committee Unveils 25-Year Transportation Plan, Projects $258 Million Gap

ARTICLE SUMMARY: Will County officials have presented "Our Way Forward 2050," a new long-range transportation plan that provides a 25-year vision for infrastructure projects while forecasting a $258 million shortfall in...
WCO-Public-Safety.4

Will County Animal Protection Services Seeks New Facility Amid “Gaping Wound” of Space Crisis

Article Summary: Will County Animal Protection Services is seeking approval for a new facility, telling a county committee that its current building is critically inadequate for housing animals, leading to...
WCO-Cap-Imp-8.5.2

Board Confronts Animal Services Crowding, Explores Future Facility Options

ARTICLE SUMMARY: Will County officials are grappling with an ongoing animal housing crisis that has overwhelmed the county’s Animal Protective Services facility, prompting discussions about expansion, new construction, or even repurposing...
WCO-Finance-Aug-5.3

Will County Board Members Demand Transparency in Cannabis Tax Fund Allocation

ARTICLE SUMMARY: A debate over transparency and process erupted at the Will County Board’s Finance Committee meeting regarding the distribution of local cannabis tax revenue. Board members called for more...
WCO-PZ-Aug-5.2

Homer Glenn Residents Push Back on 143rd Street Widening as Officials Signal “Tentative Agreement”

ARTICLE SUMMARY: A Homer Glenn farm owner voiced strong opposition to the planned widening of 143rd Street during a county meeting, while committee members indicated a "tentative agreement" is in the...
WCO-LEG-8.5.1

Will County Forges 2026 Federal Agenda Amid D.C. Policy Shifts, ‘Big Beautiful Bill’ Impacts

ARTICLE SUMMARY: The Will County Board's Legislative Committee is reshaping its federal priorities for 2026, adding new language on environmental justice and LGBTQIA+ rights while creating a more transparent process for...
WCO-Public-Safety.3

Health Department Seeks $1 Million Levy Increase to Prevent “Weakened System”

Article Summary: The Will County Health Department is asking for a $1 million increase to its property tax levy to save 11 critical jobs that are at risk as post-pandemic...
WCO-Cap-Imp-8.5.3

County Rolls Out New “OneMeeting” Software to Improve Public Access

ARTICLE SUMMARY: Will County has officially launched a new agenda and meeting management software called "OneMeeting," aimed at improving transparency and making it easier for the public and officials to access...
Meeting-Briefs

Meeting Summary and Briefs: Will County Board Finance Committee for August 5, 2025

The Will County Board’s Finance Committee confronted major budget challenges during its Tuesday meeting, led by a stark presentation from the Will County Health Department. Health officials are requesting an...
WCO-PZ-8.12.2

Will County PZC Approves Rezoning for Truck Repair Facility on Manhattan Road Amid Resident Concerns

Article Summary: The Will County Planning and Zoning Commission voted 4-2 to rezone nearly 14 acres in Joliet Township for a truck repair facility. The approval came after a neighboring...
WCO-PZ-Aug-5.3

Key Stretch of Bell Road on Track for Thanksgiving Reopening, Committee Approves Additional Funds

ARTICLE SUMMARY Construction on Bell Road between 159th and 151st Streets is scheduled to have all lanes open by Thanksgiving, officials announced as the Public Works & Transportation Committee approved a...
WCO-LEG-8.5.2

Will County Leglislative Committee Opposes Federal Push for Heavier, Longer Trucks

ARTICLE SUMMARY: The Will County Board's Legislative Committee unanimously passed a resolution opposing any federal legislation that would increase the size and weight limits for commercial trucks on national roadways. Will...
WCO-Public-Safety.2

Will County Reports Progress in Opioid Fight, Highlights New FDA Labeling Rules

Article Summary: Will County is seeing a reduction in opioid overdose deaths and is expanding access to the reversal drug Narcan, health officials reported. The department also drew attention to...
WCO-Cap-Imp-8.5.4

In-House Staff Completes Major Renovations at Will County Adult Detention Facility

ARTICLE SUMMARY: Maintenance staff at the Will County Adult Detention Facility recently completed extensive renovations in-house, including a new control center and the full restoration of a 48-cell housing unit, saving...
Land-use-8.5.25

Will County Advances Truck Repair Facility Plan on Manhattan Road Despite Resident Objections

Article Summary: A proposal to rezone nearly 14 acres on Manhattan Road for a truck repair facility advanced after receiving a recommendation for approval from the Will County Land Use...