Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 17
Mostly Sunny
72° 55°

Mostly Sunny

💨 10 to 15 mph 💧 10%

Leave a Comment





Latest News Stories

Illinois municipalities push for local fuel tax as gas prices rise

Illinois municipalities push for local fuel tax as gas prices rise

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Some Illinois municipal leaders are pushing for the ability to impose local fuel taxes at a time...
Illinois lawmaker supports EPA rollback; AG opposes

Illinois lawmaker supports EPA rollback; AG opposes

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – An Illinois lawmaker is praising the Environmental Protection Agency under President Donald Trump for repealing the...
Illinois Quick Hits: Report shows Illinois with highest U.S. tax rates

Illinois Quick Hits: Report shows Illinois with highest U.S. tax rates

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A new survey says Illinois has the highest tax rates in the country. According to a WalletHub...
Will County Board Graphic.03

Committee Approves $740,000 Compressor to Boost RNG Plant Uptime

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: The Landfill Committee approved the purchase of a fourth feed compressor for the Renewable Natural Gas (RNG) facility to...
Meeting Briefs

Meeting Summary and Briefs: Lincoln-Way District 210 Board of Education for February 19, 2026

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 NEW LENOX – The Lincoln-Way Community High School District 210 Board of Education met on Thursday, February 19, 2026, to...
Will County Board Graphic.04

County Approves $1.9 Million for Wilmington-Peotone Road Engineering

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements...
Police Crime

County Board Authorizes Audit of Homer Glen Policing Contract; Officials Seek ‘True Cost’ of Services

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board unanimously approved a $75,000 contract to audit the cost of law enforcement services provided to the Village...
solar panels photovoltaics in solar farm

Soltage Drops Battery Storage Plans, Secures Extensions for Two Crete Solar Projects

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board granted second extensions to special use permits for two solar energy projects in Crete Township. The developer,...
Will County Board Graphic.02

Scrap Metal Drop-Off Near Mokena Approved by Single Vote

Will County Board Meeting | February 19, 2026 Article Summary: A contested proposal for an outdoor recyclable material drop-off facility in Frankfort Township passed by a single vote following objections from...
Will County Board Graphic.01

Landscape Business Approved on Cedar Road Despite ‘Dangerous Curve’ Concerns

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a special use permit for a landscape business on Cedar Road in Homer Glen, despite concerns...
Reported debt deal, credit downgrades may add to Chicago budget woes

Reported debt deal, credit downgrades may add to Chicago budget woes

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago taxpayers may face higher costs if the city follows through with a reported bond deal. The...
Committee-Ad-Hoc.Graphic

Meeting Summary and Briefs: Will County Ad-Hoc Ordinance Review Committee for February 10, 2026

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Meeting SummaryThe Will County Board Ad-Hoc Ordinance Review Committee met on Tuesday, February 10, 2026, to continue its comprehensive...
Committee-Land Use.Graphic

Meeting Summary and Briefs: Will County Land Use & Development Committee for February 5, 2026

Will County Land Use & Development Committee Meeting | February 5, 2026 The Will County Land Use and Development Committee met on Thursday, February 5, 2026, to deliberate on several...
Screenshot 2026-02-22 at 5.06.42 PM

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for February 18, 2026

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Meeting SummaryThe Joliet Junior College Board of Trustees met on Wednesday, February 18, 2026, for a regular meeting dominated...
Committee-Executive.Graphic

Meeting Summary and Briefs: Will County Executive Committee for February 11, 2026

Will County Executive Committee Meeting | February 11, 2026 Meeting SummaryThe Will County Board Executive Committee met on Wednesday, February 11, 2026, tackling a heavy agenda focused on economic development...