Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 14
Sunny
74° 56°

Sunny

💨 10 mph 💧 0%

Leave a Comment





Latest News Stories

Illinois Quick Hits: Google settlement wins praise from Illinois AG

Illinois Quick Hits: Google settlement wins praise from Illinois AG

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Attorney General Kwame Raoul says he is pleased that a federal court stated it will approve...
Illinois diversity commission says businesses aren't cooperating

Illinois diversity commission says businesses aren’t cooperating

By Jared Strong | The Center SquareThe Center Square (The Center Square) -- Illinois has failed to broaden access to state contract money for businesses owned by racial minorities, women...
U.S. House, Senate, governor on Ohio primary ballots Tuesday

U.S. House, Senate, governor on Ohio primary ballots Tuesday

By Andrew RiceThe Center Square Voters in Ohio will head to polls on Tuesday to select their respective party nominees after the state legislature conducted a mid-decade redistricting effort to...
Watchdog says healthcare providers may be misrepresenting child gender treatments as routine care

Watchdog says healthcare providers may be misrepresenting child gender treatments as routine care

By Tate MillerThe Center Square Healthcare providers may be able to misrepresent transgender treatments for minors as routine care that is unrelated to gender-affirming treatments, a new report from medical...
Everyday Economics: Inflation squeezes household spending

Everyday Economics: Inflation squeezes household spending

By Orphe DivounguyThe Center Square The Fed held rates where they were – 3.5% to 3.75% – and nobody was surprised. What actually mattered was the friction inside the room....
Hurricane season month away; forecast modest

Hurricane season month away; forecast modest

By Alan WootenThe Center Square Six to nine hurricanes have been forecast in the Atlantic Basin hurricane season from June 1 to Nov. 30 by the two leading authorities. At...
Pentagon seeks $21B for barracks as repair backlog doubles

Pentagon seeks $21B for barracks as repair backlog doubles

By Brett RowlandThe Center Square The Pentagon is asking Congress for more than $21 billion for military barracks in its fiscal year 2027 budget request, the largest such investment in...

Lincoln-Way Updates Student Handbook, Bans “Smart Glasses” to Combat AI Cheating

Lincoln-Way Community High School District 210 Meeting | April 16, 2026 Article Summary: The Lincoln-Way Board of Education approved updates to the 2026-2027 student handbook, notably adding "smart glasses" to the...
Will County Board Graphic.03

Will County Board Approves Tax Abatement Intent for “Project North Winds” Manufacturing Facility

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board signaled its intent to offer a 50% property tax abatement to "Project North Winds," a proposed...
Illinois lawmaker warns medical records bill could delay care

Illinois lawmaker warns medical records bill could delay care

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – State lawmakers are clashing over an Illinois proposal that would restrict how certain sensitive medical information...
‘Farm Bill’ may ease cost burden for farmers; Ag groups urge US Senate action

‘Farm Bill’ may ease cost burden for farmers; Ag groups urge US Senate action

By Sean ReedThe Center Square Many farm-focused organizations say they support a GOP-led legislative package on agriculture that narrowly passed through the U.S. House. The Illinois Farm Bureau has urged...
Indiana voters to decide compeititive congressional primary races Tuesday

Indiana voters to decide compeititive congressional primary races Tuesday

By Andrew RiceThe Center Square Indiana voters head to the polls Tuesday to elect party representatives in several competitive primary races. Across the Hoosier state, local political figures are seeking...
U.S. debt tops 100% of GDP, 'deeply troubling' for economy, national security

U.S. debt tops 100% of GDP, ‘deeply troubling’ for economy, national security

By Thérèse BoudreauxThe Center Square The U.S. national debt is now larger than the entire American economy and is only set to keep growing, further exacerbating the affordability crisis and...

U.S. troops in Italy, Spain hang in balance as troop reduction in Germany announced

By Sarah Roderick-FitchThe Center Square On the heels of President Donald Trump threatening to reduce troops in Europe, the Department of War announced Friday the reduction of 5,000 troops from...
Federal appeals court halts access to mail-order abortion drug

Federal appeals court halts access to mail-order abortion drug

By Dan McCalebThe Center Square A federal appeals court on Friday temporarily halted a Biden-era rule that allowed individuals to receive the abortion pill mifepristone through the mail without a...