Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Leave a Comment





Latest News Stories

Illinois quick hits: Former Chicago schools dean sentenced for sexual assault

Illinois quick hits: Former Chicago schools dean sentenced for sexual assault

By Jim Talamonti | The Center SquareThe Center Square Former Chicago schools dean sentenced for sexual assault A former Chicago public school dean has been sentenced to 22 years in...
WCO-Landfill-8.5.25.1

Will County Receives Detailed Update on Landfill Expansion Investigation

Article Summary: The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on...
Meeting-Briefs

Meeting Summary and Briefs: Will County Landfill Committee for August 7, 2025

The Will County Landfill Committee on Thursday heard a detailed technical update on the ongoing investigation for the county landfill expansion, confirming that the complex project remains on schedule. Consultants...
Green-Garden-Logo.WP

Green Garden Township Moves Forward with New Town Hall Plans, Awaits Grant Approval

ARTICLE SUMMARY: Green Garden Township is advancing with preliminary work for a new town hall, having met with architects and a civil engineer, while awaiting Will County's final approval to...
Green-Garden-Township-Graphic.1

Township Board Approves Budget Transfers to Fund Assessor’s Staff and Correct Rent Payment

ARTICLE SUMMARY: The Green Garden Township Board approved Resolution 2025-005, which reallocates a total of $25,200 within the town fund to provide necessary staffing funds for the assessor's office and to...
solar panels photovoltaics in solar farm

County Rep Cites Solar Lawsuits, Grant Shortfalls as Key Issues Facing Will County

ARTICLE SUMMARY: Will County Board member Sherry Newquist reported that the county is navigating lawsuits related to solar farm approvals and anticipating budget challenges from the loss of federal grant money....
Assessor

Assessor’s Office Hires Staff to Handle Workload After 6% Multiplier Hits Property Owners

ARTICLE SUMMARY: Following the application of a 6% property assessment multiplier across Green Garden Township, the assessor's office has hired a new staff member to help manage the increased workload and...
SSUCv3H4sIAAAAAAAACnSRz07DMAzG70i8Q5XzKpY10I0jB248wcTBdcwaLUum/AGhae9O0rQjB7jFP9uf/cWX+7umYQN4hey5ueQoxUrr6IODoKxJeL2auSMjydWEpArWKdA1HCDgaOBECZqodcbXKcl8gBA9+TxsRgiBDkmjwJtE2Whf4mZJTMnUkVKMrSrm4zCxBRXxfzpfoleGvH94VQYM0l9Kb8ojaQ2GbPS/suXxvliFAxn8ntxULh1pguJyX0rZ8SuQO9W+IUplK8ufFkHngq5SOjuFyhyqNhvG6QRLG9pogssr3D6EaWvPMOj8/x9JkxY+gvepXC68GoTp4PZUzTE2TAZmVSbTmXLIu023E6Lre7HlohNPYi4opx1V0pnWWYRSjEcla+sqb8AIibbYb1qOXLZih7wdeNe3m+6Ry4H3fECRPv76AwAA//8DAJrJGBCkAgAA

Township Appoints Temporary FOIA Officer During Trustee’s Leave of Absence

ARTICLE SUMMARY: The Green Garden Township Board appointed resident Belinda Olszewski as a temporary, non-paid Administrative Assistant and FOIA Officer to fill the roles while Trustee Sarah Boxer is on a...
Meeting-Briefs

Meeting Summary and Briefs: Green Garden Township Board for August 11, 2025

The Green Garden Township Board pushed forward with plans for a new town hall and approved key budget transfers to support the assessor's office during its August 11th meeting. Supervisor...
Illinois quick hits: Fatal crash involved Guatemalan national; tentative Chicago firefighters contract

Illinois quick hits: Fatal crash involved Guatemalan national; tentative Chicago firefighters contract

By Jim Talamonti | The Center SquareThe Center Square Fatal crash involved Guatemalan national The Stephenson County Sheriff’s Department says toxicology testing will be conducted to determine if alcohol was...
WATCH: Sonya Massey bill requiring full employment history for police candidates now law

WATCH: Sonya Massey bill requiring full employment history for police candidates now law

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – A measure requiring police agencies across the state of Illinois to get full employment history for prospective...
Chicago group says Illinois officials break laws as they blast Trump

Chicago group says Illinois officials break laws as they blast Trump

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Mayor Brandon Johnson says he and Gov. J.B. Pritzker are on the same page about President...
Pritzker continues fielding presidential question ahead of State Fair rally

Pritzker continues fielding presidential question ahead of State Fair rally

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Illinois Democrats rally at the Illinois State Fair in Springfield Wednesday for Governor’s Day, but whether Gov....
WATCH: Illinois In Focus Daily | Tuesday Aug. 12th, 2025

WATCH: Illinois In Focus Daily | Tuesday Aug. 12th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop delves into the...
Windmill Media Logo

About Us

Your Community, Your News. Welcome to Windmill Media! Our name was inspired by the windmills that once stood as centers of town life, harnessing a natural force to power and...