Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 9
Showers And Thunderstorms Likely
91° 72°

Showers And Thunderstorms Likely

💨 5 to 20 mph 💧 65%

Leave a Comment





Latest News Stories

Meeting-Briefs

Executive Committee June 12 Meeting Briefs

Property Purchase Approved: The county authorized purchase of two parcels along Governor's Highway in Monee for $545,000 to establish a roadway maintenance facility for the eastern end of the county....
frankfort-square-park-district.2

Developer to Donate Land, Playground for New Park in Tinley Park

A new park is coming to a Tinley Park development thanks to a land and equipment donation from a local home builder. Frank Bradley, owner of Crana Homes, is donating...
Meeting-Briefs

Meeting Briefs: Frankfort Square Park District for June 12, 2025

The Frankfort Square Park District Board of Commissioners formally adopted its annual Budget and Appropriation Ordinance on June 12, a key legal step that sets the district’s spending authority for...
frankfort-school-district-161.2-e1754272831494

Summit Hill Board Approves School Resource Officer for Two Schools in Contentious Vote

The Summit Hill School District 161 Board of Education voted to hire a School Resource Officer (SRO) to serve two of its schools, approving an annual expenditure of up to...
frankfort-school-district-161.1

Summit Hill School Board Reverses Controversial Principal Non-Renewal Decision

In a significant reversal, the Summit Hill School District 161 Board of Education voted to repeal previous resolutions that aimed to not renew the contract of an unnamed principal, effectively...
frankfort-school-district-161.2-e1754272831494

Meeting Briefs: Summit Hill School District 161 for June 11, 2025

The Summit Hill School District 161 Board of Education made several major decisions at its June 11 meeting, including the hiring of a School Resource Officer for two schools after...
Will-County-Ad-Hoc-Ordinance-Review-Committee-Meeting-June-10-2025

Will County to Draft New Harassment Policy Amid Debate Over Board Authority

The Will County Ad-Hoc Ordinance Review Committee will draft a new, county-wide general harassment policy after a lengthy debate on Tuesday revealed the complexities of the county’s legal obligations and...
Will-County-Ad-Hoc-Ordinance-Review-Committee-Meeting-June-10-2025

Committee Uncovers Gaps in County Asset Tracking, Calls for Better System

A review of Will County’s fiscal policies on Tuesday highlighted significant gaps in how the county tracks its physical assets, from office furniture to squad cars, prompting calls from the...
frankfort-park-district

Frankfort Park District in Dispute with Five Oaks HOA Over Park Development Rules

The Frankfort Park District is taking legal steps to untangle itself from the development rules of the Five Oaks homeowners association, asserting that as a public body, it "cannot be...
Meeting-Briefs

In Brief: Ordinance Review Committee Actions

The Will County Ad-Hoc Ordinance Review Committee met June 10 to continue its comprehensive update of the county code. Here are some of the key actions and discussions: Court Fees...
frankfort-park-district.1

Frankfort Park District Kicks Off Busy Summer Season with Races and New Events

The Frankfort Park District is in full summer swing, with a packed schedule of programs and events that includes an expanded day camp, new community parties, and the 25th anniversary...
frankfort-park-district

Meeting Briefs: Frankfort Park District Board for June 10, 2025

The Frankfort Park District Board of Commissioners discussed a legal dispute with the Five Oaks homeowners association over park development rules at its Tuesday meeting. Executive Director Gina Hassett reported...
Will-County-Jail-e1750123778582

Will County Jail Faces Major Staffing Crisis as 70 Employees Eligible to Retire by 2030

County officials warn of potential budget impact as adult detention facility grapples with unprecedented turnover Will County's adult detention facility is heading toward a staffing crisis that could significantly impact...
will-county-board.3

Will County Health Department Reports Sharp Decline in Overdose Deaths

2025 fatalities running 40% lower than previous year, officials attribute success to expanded Narcan distribution Will County is experiencing a significant reduction in overdose deaths, with 2025 fatalities running 40%...
will-county-board

Solar Project Extensions Approved as Industry Faces Permitting Delays

Three solar energy projects received 180-day extensions from Will County's Land Use & Development Committee Thursday as developers continue working through lengthy permitting processes with utility companies and other agencies....