Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Fri Jun 12
Sunny
84° 61°

Sunny

💨 5 to 15 mph 💧 11%

Leave a Comment





Latest News Stories

frankfort illinois library logo graphic.1

Frankfort Library Tables Reading Room Project Over Higher-Than-Expected Engineering Costs

Article Summary: The Frankfort Public Library Board of Trustees voted to table a proposal from architectural firm StudioGC for a planned reading room project after engineering fees came in significantly...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Township Board for July 14, 2025

The Frankfort Township Board on Monday, July 14, 2025, primarily focused on zoning matters, unanimously denying special use permits for two businesses, Dimitri Best Food and Kismet Restaurant, that sought...
frankfort-park-district

Frankfort Park District Board Approves Pay Raise for Executive Director Gina Hassett

Article Summary: Following a closed session, the Frankfort Park District Board of Commissioners unanimously approved a compensation increase for Executive Director Gina Hassett. The decision was made during the board's regular...
Meeting Briefs

Meeting Summary and Briefs: Summit Hill School District 161 for July 9, 2025

The Summit Hill School District 161 Board of Education took several key actions at its meeting on Wednesday, July 9, 2025, highlighted by the unanimous approval of a $115,905 contract...
frankfort-square-park-district.2

Park District’s BDC Dance Program Earns National Recognition

Article Summary: The Frankfort Square Park District’s Board of Commissioners celebrated the national success of its BDC dance program, which recently won numerous accolades, including a studio excellence award, at...
frankfort fire district graphic logo.3

Frankfort Fire District and Firefighters Union to Discuss Possible Referendum

Article Summary: The Frankfort Fire Protection District Board of Trustees has called a special meeting for July 25 to discuss a "possible referendum" with representatives from the Associated Fire Fighters of...
WCO Board Aug 21.4

After Initial Rejection and Tense Debate, Board Reconsiders and Approves Contested DuPage Township Business

Article Summary: In a rare reversal, the Will County Board approved a special use permit for a landscaping business in a residential area of DuPage Township after the measure initially...
frankfort fire district graphic logo.3

Frankfort Fire Board Approves $460,000 Purchase of New Cardiac Monitors

Article Summary: The Frankfort Fire Protection District Board of Trustees unanimously approved a five-year, $459,775 agreement to acquire six new, state-of-the-art cardiac monitors. The purchase replaces aging equipment that is...
Frankfort-Township-Logo-Graphic

Frankfort Township Highway Department Upgrades Aging Fleet, Starts Grant Project

Article Summary: The Frankfort Township Highway Department is in the process of replacing equipment that is up to two decades old, having recently received a new small leaf vacuum and a...
summit-hill-junior-high-school-frankfort-161

Summit Hill 161 Board Split on Administrative Assignments, Contracts

Article Summary: The Summit Hill District 161 Board of Education showed rare division in two separate 6-1 votes to approve administrative assignments and contracts for the upcoming school year. Board member...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for August 21, 2025

The Will County Board received County Executive Jennifer Bertino-Tarrant’s proposed $791 million budget for fiscal year 2026, which holds the line on the property tax levy while funding key services....
frankfort illinois library logo graphic.1

Frankfort Library Overcharged Nearly $23,000 in Loan Payments Due to Wintrust Bank Error

Article Summary: The Frankfort Public Library District was undercharged by $22,843.40 on interest payments for a new debt certificate after Wintrust Bank used an incorrect amortization schedule for its automated...
frankfort township graphic

Frankfort Township Board Denies Liquor and Gaming Permits for Two Restaurants

Article Summary: The Frankfort Township Board of Trustees denied special use permits for Dimitri Best Food and Kismet Restaurant, both of which were seeking ancillary liquor licenses with the intent to...
summit-hill-junior-high-school-frankfort-161.2

New Hires Approved for Summit Hill District 161

Article Summary: Summit Hill School District 161 approved the hiring of several new staff members, including a District Wide Gifted and Talented Coordinator and multiple paraprofessionals and custodians. The approvals were...
frankfort-park-district

Frankfort Park District Approves $131,500 for Park Upgrades and Master Plan

Article Summary: The Frankfort Park District Board of Commissioners approved agreements totaling $131,500 with planning firm Design Perspectives to design and construct parking lots at two parks and to update master...