Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 12
Sunny then Slight Chance Showers And Thunderstorms
87° 61°

Sunny then Slight Chance Showers And Thunderstorms

💨 5 to 15 mph 💧 18%

Leave a Comment





Latest News Stories

Patel says ICE shooting suspected searched 'Charlie Kirk Shot,' planned attack

Patel says ICE shooting suspected searched ‘Charlie Kirk Shot,’ planned attack

By Andrew RiceThe Center Square FBI Director Kash Patel suggested the suspected shooter in the Sept. 24 attack at a Dallas Immigration and Customs Enforcement facility engaged in a “high...
Trump administration prepares for mass layoffs if government shuts down

Trump administration prepares for mass layoffs if government shuts down

By Thérèse BoudreauxThe Center Square With only six days until the federal government shuts down, Republicans and Democrats have yet to secure a funding deal – and the Trump administration...
Report: Strict energy siting regulations curb property rights

Report: Strict energy siting regulations curb property rights

By Tate MillerThe Center Square In conjunction with the unveiling of a report on property rights and energy generation infrastructure, Republican Massachusetts state Rep. John Gaskey on Thursday called for...
New agronomy farm opens as growers face challenging conditions

New agronomy farm opens as growers face challenging conditions

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Tens of thousands of Illinois farmers are facing challenging conditions, with elevated fire risks due to the...
Illinois quick hits: O'Fallon man allegedly work with cartel; most dangerous for nursing home safety

Illinois quick hits: O’Fallon man allegedly work with cartel; most dangerous for nursing home safety

By Jim Talamonti | The Center SquareThe Center Square O'Fallon man allegedly work with cartel High-ranking members of the Sinaloa Cartel are among 26 defendants facing federal charges for their...
Watchdog says Biden Education Department defied court order on Title IX enforcement

Watchdog says Biden Education Department defied court order on Title IX enforcement

By Tom JoyceThe Center Square A watchdog group says the U.S. Department of Education ignored a federal court order on the Biden administration's expansion of Title IX protections and is...
Illinois in Focus: Candidate urges civil debate around ICE; state spends 43% more; mandatory voting

Illinois in Focus: Candidate urges civil debate around ICE; state spends 43% more; mandatory voting

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares comments from...
Frankfort Village Board Meeting Graphic

Frankfort Board Overrules Plan Commission, Approves Siding Variance for Larch Road Home

Article Summary: The Frankfort Village Board unanimously approved a building materials variance for a new home on Larch Road, overriding a split vote from the Plan Commission that had failed...
Frankfort School District 157-C.3

Frankfort 157-C Leaders Unveil Ambitious Annual Plan Focusing on AI, Security, and Staff Retention

Article Summary: Frankfort School District 157-C administrators presented a detailed 2025-2026 Annual Plan that includes forming a technology task force to study AI, upgrading school security with enhanced cameras and...
frankfort-park-district

Frankfort Park Board Approves Over $19,000 in Construction Changes for Fort Frankfort Project

Article Summary: The Frankfort Park District Board of Commissioners approved a series of construction change orders for the Fort Frankfort project, resulting in a net cost increase of $19,216.50. The...
Ohio’s American-owned nuclear energy company plans expansion

Ohio’s American-owned nuclear energy company plans expansion

By J.D. DavidsonThe Center Square If the federal government comes through with funding, one of the country’s only uranium enrichment facilities expects to expand. Centrus Energy announced Thursday morning the...
Trump demands investigation into 'sabotage' during U.N. speech

Trump demands investigation into ‘sabotage’ during U.N. speech

By Brett RowlandThe Center Square President Donald Trump on Wednesday called for an investigation into what he said were "sinister events" before and during his high-profile United Nations speech a...
Experts warn action needed to preserve Colorado River

Experts warn action needed to preserve Colorado River

By Liam HibbertThe Center Square The Colorado River has been in decline since the turn of the 21st century – and emergency action may be required sooner than projected, experts...
WATCH: McMahon discusses education at Reagan Institute

WATCH: McMahon discusses education at Reagan Institute

By Esther WickhamThe Center Square U.S. Education Secretary Linda McMahon emphasized literacy, artificial intelligence, civil discourse and education funding at the Reagan Institute Summit on Education. Indiana Education Secretary Katie...
Illegal border crossings near record low in August

Illegal border crossings near record low in August

By Bethany BlankleyThe Center Square (The Center Square ) – Illegal border crossings in August remained at near record lows although they were slightly up from July. Illegal crossings in...