Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Sun Jun 14
Sunny
75° 54°

Sunny

💨 5 to 10 mph 💧 0%

Leave a Comment





Latest News Stories

WATCH: Pritzker declares agricultural trade ‘crisis’ while Trump touts new deals

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Gov. J.B. Pritzker has signed an executive order to declare an agricultural trade crisis in Illinois. The...
Amnesty International condemns U.S. strikes on suspected drug boats

Amnesty International condemns U.S. strikes on suspected drug boats

By Brett RowlandThe Center Square Amnesty International, a human rights organization, condemned U.S. military strikes on suspected drug boats in the Caribbean and eastern Pacific that have killed 57 people...
‘Astonishingly reckless:’ IL Dems intro tax on ‘unrealized gains’ to fund transit

‘Astonishingly reckless:’ IL Dems intro tax on ‘unrealized gains’ to fund transit

By Jonathan Bilyk | Legal NewslineThe Center Square With just two days remaining in the Illinois legislative fall veto session, Illinois Democratic state lawmakers have introduced new legislation, ostensibly designed...
Illinois beef producers say Trump’s Argentina beef plan hurts farmers

Illinois beef producers say Trump’s Argentina beef plan hurts farmers

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois beef producers express frustration over President Donald Trump’s plan to expand beef imports from Argentina,...
WATCH: Expect tax and fee increases for veto; Democrats want more sanctuary policies

WATCH: Expect tax and fee increases for veto; Democrats want more sanctuary policies

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop reviews the prospects...
Illinois quick hits: Bailey family announces memorial services; digital currency scam losses

Illinois quick hits: Bailey family announces memorial services; digital currency scam losses

By The Center SquareThe Center Square Bailey family announces memorial services Republican gubernatorial candidate Darren Bailey has announced details of memorial services for his family members who died in a...
Meeting Briefs

Meeting Summary and Briefs: Village of Frankfort Board for October 20, 2025

Village of Frankfort Board Meeting | October 20, 2025 The Frankfort Village Board approved a series of development amendments on Monday, October 20, 2025, allowing the 43-home first phase of...
frankfort-park-district

Frankfort Park District Survey Shows Lack of Support for Top Rec Center Designs; Board Weighs Costly Referendum

Frankfort Park District Special Committee Meeting | September 23, 2025 Article Summary: A recent survey on a proposed indoor recreation center revealed no clear public support for the top two designs...
Screenshot 2025-10-25 at 12.43.06 PM

Will County Health Department Pleads for $1 Million to Avert ‘Weakened Public Health System’

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: Leaders and board members from the Will County Health Department made an impassioned plea for $1 million in county...
Judge: Benefits of feeding babies beat risk claims in NEC lawsuits

Judge: Benefits of feeding babies beat risk claims in NEC lawsuits

By Jonathan Bilyk | Legal NewslineThe Center Square Saying trial lawyers have not yet shown evidence of an alternative to cow's milk-based infant formula that would not leave tens of...
frankfort-park-district

Frankfort Park District Approves Over $322,000 in August Bills

Frankfort Park District Meeting | September, 2025 Article Summary: The Frankfort Park District Board of Commissioners approved the payment of bills totaling $322,856.04 for August, which included a delayed payment for...
Screenshot 2025-10-25 at 10.14.46 AM

Frankfort Board Approves New Dump Truck Purchase, Sale of Surplus Vehicles

Village of Frankfort Board Meeting | October 20, 2025 Article Summary: The Frankfort Village Board authorized the purchase of a new 2026 Ford F-450 dump truck for an amount not...
Screenshot 2025-10-25 at 10.14.28 AM

Frankfort Approves Over $203,000 for Holiday Lighting Contract

Village of Frankfort Board Meeting | October 20, 2025 Article Summary: The Frankfort Village Board awarded a three-year contract for holiday lighting and decorations totaling $203,269 to Wingren Landscape, Inc....
Meeting Briefs

Meeting Summary and Briefs: Summit Hill School District 161 for October 15, 2025

Summit Hill School District 161 | October 15, 2025 The Summit Hill School District 161 Board of Education on Wednesday, October 15, 2025, reviewed highly positive preliminary data from the...
Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...