Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 14
Mostly Sunny
74° 56°

Mostly Sunny

💨 5 to 10 mph 💧 0%

Leave a Comment





Latest News Stories

Evers, Grisham fly to Brazil for climate change summit as government remains shut down

Evers, Grisham fly to Brazil for climate change summit as government remains shut down

By Tate MillerThe Center Square In the midst of the ongoing government shutdown, a number of Democrat governors, mayors and other officials are flying to Brazil climate change convenings. Founder...
Upcoming mass flight cancellations worry U.S. air travelers

Upcoming mass flight cancellations worry U.S. air travelers

By Thérèse BoudreauxThe Center Square With dozens of major U.S. airports reducing their flight volumes starting Friday, travelers will see droves of flights cancelled nationwide for the duration of the...
Pritzker watching redistricting debate as GOP grapples with filibuster

Pritzker watching redistricting debate as GOP grapples with filibuster

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In the aftermath of Tuesday’s elections in other parts of the country, Illinois Gov. J.B. Pritzker is...
Trump administration finds SNAP fraud

Trump administration finds SNAP fraud

By Andrew RiceThe Center Square Amid the ongoing government shutdown, the U.S. Department of Agriculture is seeking to root out fraud in the Supplemental Nutrition Assistance Program, also known as...

WATCH: Trump says tariffs may cost Americans ‘something’ but keep U.S. safe

By Brett RowlandThe Center Square President Donald Trump said Thursday Americans should be thankful for his tariffs, which he said he has used to end wars that Americans would otherwise...
Chicago mayor: IL legislature has 'more work to do' on tax increases

Chicago mayor: IL legislature has ‘more work to do’ on tax increases

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Mayor Brandon Johnson wants to see more tax increases from the Illinois General Assembly, but a...
Chicago pension, debt services costs among highest in country

Chicago pension, debt services costs among highest in country

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – Chicago’s budget has grown by nearly 40% since 2019 with the biggest increased expenditure going toward...
WATCH: DCFS still looking for missing children numbers; Pritzker on elections results

WATCH: DCFS still looking for missing children numbers; Pritzker on elections results

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

By Jim Talamonti | The Center SquareThe Center Square DHS ordered to address ICE facility conditions A U.S. District Court judge in Chicago has issued a temporary restraining order directing...
Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

By Arthur Kane | The Center SquareThe Center Square (The Center Square) – U.S. Reps Darrell Issa, R-Calif., and David Scott, D-Ga., have each had taxpayers pay as much as...
Frankfort School District 157-C.2

State Assessment Shake-up: Frankfort 157-C to Form Committee for New Honors Criteria

Frankfort School District 157-C Meeting | September 2025 Article Summary: Frankfort School District 157-C is adapting to new, less restrictive student assessment benchmarks from the Illinois State Board of Education...
frankfort fire district graphic logo.2

Frankfort Fire District Adopts Updated Fire Codes to Address Solar Power, New Technologies

Frankfort Fire Protection District Meeting | September 2025 Article Summary: The Frankfort Fire Protection District has unanimously adopted a new fire prevention ordinance to modernize safety standards and address emerging...
Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

By Jim Talamonti | The Center SquareThe Center Square $20 million for Alton housing project Gov. J.B. Pritzker and the Illinois Housing Development Authority announced the opening of a $20...

WATCH: Illinois DCFS can’t locate documents showing number of missing children

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Documents to show the number of missing youth in care from the Department of Children and Family...
Will Dial-A-Ride Service

Will County Committee Advances Phased Takeover of Central Will Dial-A-Ride Service

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved a five-year plan to consolidate the Central Will Dial-A-Ride service into its...