Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 14
Mostly Sunny
74° 56°

Mostly Sunny

💨 5 to 10 mph 💧 0%

Leave a Comment





Latest News Stories

frankfort-square-park-district.2

New School Board Member Attends Park Meeting to Strengthen Partnership

Frankfort Square Park District Meeting | September 2025 Article Summary: In a demonstration of intergovernmental cooperation, a new member of the Summit Hill School District 161 Board of Education attended...
Screenshot 2025-11-06 at 4.17.20 PM

State Veto Session Passes Energy Bill Limiting County Zoning, Approves Toll Hike for Mass Transit

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: A state lobbyist reported to Will County that the Illinois General Assembly passed a major energy bill...
Large naval presence in Caribbean ahead of Ford arrival

Large naval presence in Caribbean ahead of Ford arrival

By Sarah Roderick-FitchThe Center Square As the number of suspected narcotic transport boats destroyed by the U.S. military grows, so does the number of naval vessels in the Caribbean. Secretary...
Voting rights group warns CA redistricting push could undermine trust in IL

Voting rights group warns CA redistricting push could undermine trust in IL

By Catrina Barker | The Center Square contributorThe Center Square (THE CENTer Square) – California Gov. Gavin Newsom is urging states like Illinois to redraw congressional maps, but voting rights...
Chicago downtown office space vacancy rate jumps to record high levels

Chicago downtown office space vacancy rate jumps to record high levels

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – With Chicago’s downtown office vacancy rate now at a record-high 28%, Illinois Policy Institute researcher LyLena...
will county board graphic

Commission Approves Peotone-Area Farmhouse Split, Overruling Staff’s “Spot Zoning” Concerns

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a request to rezone a 1.75-acre portion of a larger...
Frankfort School District 157-C.1

District 157-C Adopts State Framework to Guide Student Career Paths

Frankfort School District 157-C Meeting | September 2025 Article Summary: The Frankfort School District 157-C Board of Education has formally adopted the state-mandated Postsecondary and Career Expectations (PaCE) framework. The...
Screenshot 2025-11-05 at 4.18.19 PM

Will County Finance Committee Hits Impasse on 2025 Tax Levy, Postpones Budget Votes

Will County Finance Committee Meeting | November 2025 Article Summary: The Will County Finance Committee postponed votes on the 2025 tax levy and the 2026 budget after a contentious debate...
Federal court backs union on feds' partisan emails

Federal court backs union on feds’ partisan emails

By Esther WickhamThe Center Square A federal judge ruled Friday that the Trump administration violated employees’ First Amendment rights by allegedly hijacking their email accounts to send automated partisan messages...
Senate Democrats propose new govt. funding deal; Republicans reject it

Senate Democrats propose new govt. funding deal; Republicans reject it

By Thérèse BoudreauxThe Center Square After nearly six weeks of continuously blocking Republicans’ bill to end the ongoing government shutdown, Senate Democrats have modified their funding counterproposal. Instead of demanding...
Trump administration will fully fund SNAP despite appeal

Trump administration will fully fund SNAP despite appeal

By Brett RowlandThe Center Square The Trump administration said Friday afternoon that it would fully fund the Supplemental Nutrition Assistance Program for November, despite the funding lapse and government shutdown....
Report: Princeton ranked best university, best school overall

Report: Princeton ranked best university, best school overall

By Esther WickhamThe Center Square Princeton University claimed the nation's top spot for universities and best school overall in WalletHub's 2026 Best Colleges rankings. The WalletHub report analyzed 800 higher-education...
Trump blasts cost overruns at Obama Presidential Center in Chicago

Trump blasts cost overruns at Obama Presidential Center in Chicago

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago is back in the mind of President Donald Trump, but this time the commander-in-chief’s focus is...
Illinois quick hits: Get Covered Illinois premiums to spike

Illinois quick hits: Get Covered Illinois premiums to spike

By Jim Talamonti | The Center SquareThe Center Square Get Covered Illinois premiums to spike The Get Covered Illinois division of the Illinois Department of Insurance says Illinoisans enrolling in...
Colorado boosts WIC, food pantries amid D.C. stalemate

Colorado boosts WIC, food pantries amid D.C. stalemate

By Elyse ApelThe Center Square Editor's note: This story was updated Friday evening since its initial publication earlier in the day. Colorado is moving forward with stop-gap funding for food...