Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

Today Jun 14
Mostly Sunny
74° 56°

Mostly Sunny

💨 10 mph 💧 0%

Leave a Comment





Latest News Stories

TSA agents who worked throughout shutdown to receive $10,000 bonus

TSA agents who worked throughout shutdown to receive $10,000 bonus

By Thérèse BoudreauxThe Center Square The Department of Homeland Security will issue $10,000 bonus checks to Transportation Security Administration (TSA) agents who demonstrated “exemplary” behavior and work attendance during the...
Boeing to pay $36M to family of Indian woman killed in Ethiopia Air crash

Boeing to pay $36M to family of Indian woman killed in Ethiopia Air crash

By Jonathan Bilyk | Legal NewslineThe Center Square The family of a woman from India who died in a 2019 airliner crash could receive nearly $35 million from Boeing, under...
Pro-life org invests $80M into 2026 midterms, will reach 10.5M voters

Pro-life org invests $80M into 2026 midterms, will reach 10.5M voters

By Tate MillerThe Center Square Susan B. Anthony Pro-Life America says it will reach 10.5 million voters by its newly announced investment of $80 million into the 2026 midterm election,...
Refilling Strategic Petroleum Reserve begins

Refilling Strategic Petroleum Reserve begins

By Alton WallaceThe Center Square About 1 million barrels of crude oil that will go toward replenishing the nation’s Strategic Petroleum Reserve have been purchased, the U.S. Department of Energy...

WATCH: Lawmakers call out Pritzker for lack of transparency with budget cuts

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois lawmakers say they are not getting information from Gov. J.B. Pritzker or state agencies about the...
Report: Barriers to social mobility largely manmade

Report: Barriers to social mobility largely manmade

By Tate MillerThe Center Square Authors of a new report on social mobility across the 50 states said that barriers to social mobility are largely “man-made” and can be solved...
Fetterman hospitalized for heart episode

Fetterman hospitalized for heart episode

By Christen SmithThe Center Square Pennsylvania Democratic U.S. Sen. John Fetterman remains under observation at a Pittsburgh-area hospital following a heart episode early Thursday. The senator’s spokesman posted to his...
IL congressman pushes military to accept CLT, experts say it could shape education

IL congressman pushes military to accept CLT, experts say it could shape education

By Catrina Barker | The Center Square contributiorThe Center Square (The Center Square) – An Illinois congressman is pushing to expand testing options at U.S. service academies, a move experts...
Federal services to slowly recover following end of government shutdown

Federal services to slowly recover following end of government shutdown

By Thérèse BoudreauxThe Center Square With the longest government shutdown in history finally over, federal agencies are slowly bringing affected services back online and hoping to resume normal operations by...
solar panels photovoltaics in solar farm

New Lenox Solar Farm Gains County Committee Approval with Conditions

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: A 63-acre commercial solar energy facility on Spencer Road in New Lenox Township received a key endorsement...
Will County Board Land Use Committee Graphic.1

Committee Approves Frankfort Township Gaming Bar on Split Vote

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: Despite an objection from Frankfort Township, a proposed video gaming bar on West St. Francis Road is...
Will County Board Land Use Committee Graphic.3

Crete Township Senior Group Home Gets Unanimous Committee Support

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: A proposal to convert a single-family home in Crete Township into a shared living facility for up...
Will County Board Land Use Committee Graphic.4

Beecher-Area Rezoning and Variances Approved to Legalize Structure

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: The Will County Land Use and Development Committee approved a rezoning and two variances for a property...
Will County Board Land Use Committee Graphic.2

Committee Approves Wilton Township Land Division Despite Spot Zoning Concerns

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: The Will County Land Use and Development Committee approved a request to rezone a 1.75-acre parcel in...
Illinois, Chicago residents rank high taxes as state’s top issue

Illinois, Chicago residents rank high taxes as state’s top issue

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – With the state now losing a resident to another state every nine minutes and more than...