Frankfort Village Board Meeting Graphic

Frankfort Approves Final Plan for 14-Lot Industrial Park With Solar Component

Spread the love

Frankfort Village Board Meeting | June 1, 2026

Article Summary: The Frankfort Village Board on Monday, June 1, 2026, granted final development plan and final plat approval for Frankfort Pointe, a 14-lot light industrial and commercial subdivision on roughly 133 acres at the village’s eastern edge — the only portion of Frankfort located in Cook County — that will include an approximately 52-acre solar energy installation.

Frankfort Pointe Key Points:

  • The board approved the final development plan for Lots 2, 13 and 14 and the final plat of subdivision as part of its unanimous consent agenda, passing 5-0 with five trustees present.
  • The development covers about 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail, Richton Park, and includes 11 industrial lots, two stormwater detention lots and the solar component.
  • The Plan Commission forwarded both approvals on unanimous 7-0 recommendations at its May 14 meeting.
  • Approval carries five conditions covering fencing, stockpile limits, detention-basin maintenance and right-of-way improvements pending Cook County review.

FRANKFORT — The Frankfort Village Board on Monday, June 1, 2026, gave final approval to the development plan and subdivision plat for Frankfort Pointe, clearing the way for a 14-lot light industrial and commercial park anchored by a large solar energy installation on the village’s eastern boundary.

The approvals, presented by Trustee Adam Borrelli, were enacted as part of the board’s unanimous consent agenda in a single 5-0 roll-call vote. The development sits on approximately 133.25 acres at the southeast corner of Harlem Avenue and Sauk Trail, commonly known as 7200 Sauk Trail in Richton Park. According to the agenda packet, the parcel is located along the village’s eastern boundary and is the only portion of the Village of Frankfort situated within Cook County.

The board took two related actions: it accepted the Plan Commission’s recommendation and approved the final development plan for proposed Lots 2, 13 and 14, and it approved the final plat of subdivision prepared by Geotech Inc., dated Sept. 17, 2025. The Planned Unit Development for Frankfort Pointe was previously approved by the board on March 16, 2026, and the Plan Commission forwarded both of the recommendations approved Monday on unanimous 7-0 votes at its May 14 meeting.

A Mix of Industry, Detention and Solar

The development is planned as 11 multi-acre industrial lots and two multi-acre stormwater detention lots, along with an approximately 52-acre solar energy component, according to the packet. At the Plan Commission’s May 14 meeting, applicant representative Chuck Smith of Arete Design Studio fielded questions about utility access on the site, and Paul Irby of Dimension Solar told commissioners that Commonwealth Edison had not yet begun detailed design of the utility poles serving the project.

Much of the commission’s discussion centered on easements. Commissioners pressed the applicant on whether a sidewalk easement along Sauk Trail and a ComEd access easement were reflected on the plat. Village planning staff advised that a specific access easement for the sidewalk was required per the village’s consulting engineer, and the commission added language directing that a public access easement be included. Staff noted the team was still awaiting Cook County requirements, meaning the sidewalk could ultimately be placed within the right of way.

Conditions Attached to the Approval

The final development plan approval carries five conditions. Final engineering approval must include confirmation from the Cook County Department of Transportation and Highways for required right-of-way improvements along Harlem Avenue and Sauk Trail, including any paths or sidewalks. Fence screening for Lot 2 along street frontage lines is to be wood fence as shown in the plans, with non-street frontage lines built as 8-foot black vinyl-coated chain-link fence with vinyl slats. The property owner or a developer-established association must maintain all detention basins and plantings on Lots 13 and 14.

Two conditions address site management during buildout. Dirt and clay stockpiles are permitted only on Lots 11 and 12 for periods not to exceed one year from the first building permit unless extended, with the village retaining the right to draw on an approved letter of credit — after 10 days’ written notice — to relocate or remove improperly placed or problem stockpiles. And no later than 18 months after the first building permit is issued, the developer must restore any remaining vacant lots to a flattened subgrade, add black dirt and seed them to establish a maintainable grass cover until they are built upon.

The final plat approval was made subject to final engineering approval, Cook County transportation approval and any necessary technical revisions prior to recording. It was further conditioned on an emergency access easement along the south property line of proposed Lot 1, allowing emergency vehicle access to and from Anderson Court, and a public access easement for the proposed sidewalk along Sauk Trail.

The item drew no board discussion Monday, having been placed on the consent agenda as routine. Trustee Jessica Petrow was absent from the meeting.

⚠️ Hydrologic Outlook issued June 15 at 3:11PM CDT by NWS Chicago IL
⚠️ Hydrologic Outlook issued June 15 at 3:10PM CDT by NWS Chicago IL
Today Jun 15
Showers And Thunderstorms Likely
72° 55°

Showers And Thunderstorms Likely

💨 10 to 20 mph 💧 56%

Leave a Comment





Latest News Stories

summit-hill-junior-high-school-frankfort-161

Summit Hill 161 Board Debates Ambitious Plan to Launch Hot Lunch Program in January

Frankfort School District 161 Meeting | November 19, 2025 Article Summary: The Summit Hill School District 161 board on Wednesday engaged in a lengthy discussion about launching a hot lunch...
Will County Board Graphic.02

Board Denies Appeal for “Tiny Home” RV Living in Crete

Will County Board Meeting | November 2025 Article Summary: The Will County Board voted 19-2 to uphold a denial of a temporary use permit for a recreational vehicle (RV) being...
frankfort-square-park-district.2

Park Board Approves Staff Travel for 2026 Dance Competitions

Frankfort Square Park District Meeting | October 16, 2025 Article Summary: The Frankfort Square Park District board has approved travel, meal, and lodging expense reimbursements for dance staff to attend...
joliet junior college logo

JJC Board Censures Trustee Broderick Twice, Denies Request to Restore Good Standing

Joliet Junior College Meeting | November 12, 2025 Article Summary:In a series of contentious votes, the Joliet Junior College Board of Trustees censured Trustee Maureen Broderick for two separate alleged...
mental health awareness day bipolar disorder anxiety stress emot

Will County Board Compromises on Mental Health Levy, Approves $10 Million After Debate

Will County Board Regular Meeting | October 16, 2025 Article Summary: The Will County Board on Thursday, October 16, 2025, approved a $10 million tax levy for the Community Mental Health...
The Wild Flowe rFarm

Green Garden’s Wildflower Farm Granted Second Extension for Rural Events Permit

Will County Board Regular Meeting | October 16, 2025 Article Summary: Bengston Land Management, LLC, operators of The Wildflower Farm in Green Garden Township, received a second 180-day extension from the...
Screenshot 2025-10-17 at 3.14.53 PM

Will County Board Rejects Proposed Tax Hike, Approves 0% Levy Increase in Contentious Vote

Will County Board Regular Meeting | October 16, 2025 Article Summary: In a significant move providing relief to taxpayers, the Will County Board on Thursday, October 16, 2025, voted to approve...
Screenshot 2025-10-17 at 3.14.41 PM

Will County Awards $10.4 Million Contract for Bell Road Widening Project

Will County Board Regular Meeting | October 16, 2025 Article Summary: The Will County Board has approved a $10.4 million contract with P.T. Ferro Construction Co. for a major roadway widening...
Screenshot 2025-10-17 at 3.15.09 PM

Regional Office of Education Highlights School Safety, New Learning Programs in Update

Will County Board Regular Meeting | October 16, 2025 Article Summary: Will County Regional Superintendent Dr. Lisa Caparelli-Ruff updated the County Board on key initiatives, including the installation of shooter-resistant window...
Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for October 16, 2025

Will County Board Regular Meeting | October 16, 2025 The Will County Board took major action on property taxes at its meeting on Thursday, October 16, 2025, narrowly voting to...
30 MPH Speed Limit

Will County Board Approves New 30 MPH Speed Limit for Frankfort Township Road

Will County Board Regular Meeting | October 16, 2025 Article Summary: The Will County Board approved a new 30 MPH speed limit for a section of 78th Avenue in Frankfort Township,...
Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...
Screenshot 2025-10-25 at 10.49.15 AM

Frankfort Township Board Objects, but County Commission Recommends Bar with Video Gaming

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: Despite a formal objection from the Frankfort Township Board, the Will County Planning and Zoning Commission recommended...
Screenshot 2025-10-25 at 10.49.23 AM

Senior Shared Housing Facility Recommended for Approval in Crete Township

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission has recommended approval for a special use permit that would...