Screenshot 2026-05-21 at 5.01.25 PM

Frankfort Approves $1.1 Million in Fleet Upgrades and Sewer Infrastructure Contracts

Spread the love

Frankfort Village Board Meeting | May 18, 2026

Article Summary:
The Frankfort Village Board authorized more than $900,000 in public works fleet replacements, including a new Vactor truck and dump truck, and approved over $130,000 in sanitary sewer engineering agreements.

Fleet and Infrastructure Key Points:

  • Vactor Truck Purchase: The village will acquire a 2026 International Vactor truck from Standard Equipment Company for $605,860 to replace a worn 2008 model.

  • Dump Truck Upgrades: A $250,847 contract was awarded to Rush Truck Centers and Monroe Truck Equipment for a 2027 International dump truck with snow removal gear.

  • Sanitary Sewer Evaluation: Robinson Engineering was awarded $79,500 to inspect 124 manholes and 26,036 feet of sewer main in the Heritage Knolls and Founders Place subdivisions.

  • Trustee Abstention: Trustee Maura Rigoni abstained from voting on the sewer contracts due to her part-time employment with Robinson Engineering.


FRANKFORT — The Frankfort Village Board on Monday, May 18, 2026, approved over $1.1 million in capital equipment purchases and sewer maintenance agreements, reinforcing its public works fleet and utility infrastructure.

All of the purchases and professional services agreements were approved as part of the board’s unanimous consent agenda, following prior review and recommendations by the Committee of the Whole.

The largest single purchase authorized was a 2026 International Vactor truck from Standard Equipment Company. The vehicle is being purchased through the Sourcewell cooperative program at a cost not to exceed $605,860, with funding allocated from the village’s FY 2026-2027 capital budget.

According to public works officials, the village’s existing 2008 Vactor truck, which is used to clean storm sewers and perform hydro-excavating, has reached the end of its useful life. The village will determine at the time of delivery whether to trade in the 2008 model for a $20,000 credit or sell it at public auction.

Additionally, the board approved the purchase of a 2027 International HV507 dump truck equipped with heavy-duty snow removal equipment. The truck chassis will be provided by Rush Truck Centers for $112,728, while the dump body and snow plow package (including a mid-mount junior patrol wing) will be installed by Monroe Truck Equipment, Inc. for $137,782.

Along with title and municipal plate fees, the total cost for the dump truck is $250,847. It replaces a unit in the village’s 13-truck snow removal fleet that has suffered mechanical wear from road salt.

The third vehicle acquisition approved was a 2026 Ford F-350 4×4 pickup truck from Curry Motors of Frankfort for $49,997. The purchase matches state bid pricing. The board also authorized up to $15,000 in additional upfitting costs to equip the pickup with a snowplow, liftgate, toolbox, and utility lighting through separate vendors.

To clear the way for these sales, the board passed an ordinance declaring a 2005 International 7400 dump truck and a 2013 Chevrolet 1500 as surplus property, authorizing their disposal at a public auction.

In infrastructure developments, the board approved two professional engineering contracts with Robinson Engineering, Ltd.

The first contract, valued at $50,900, covers design, bidding, and construction services for the 2026 Manhole Rehabilitation project. Based on a 2025 sanitary sewer evaluation survey, the project will repair and seal 154 manholes to mitigate inflow and infiltration (I&I) of stormwater into the sanitary system. The total cost of the rehabilitation project is estimated at $544,960.

The second contract awards Robinson Engineering $79,500 to conduct the 2026 Jackson Creek Sanitary Sewer Evaluation Survey. The next phase of this ongoing study will inspect 124 manholes and approximately 26,036 linear feet of main in the Heritage Knolls and Founders Place subdivisions, as well as the Vans Drive industrial park. The cleaning and televising portion of the project, estimated at $206,725, will be bid separately.

Trustee Maura Rigoni abstained from voting on both Robinson Engineering contracts due to her part-time employment with the firm. The agreements passed 5-0 with the support of the remaining trustees.

Leave a Comment





Latest News Stories

Meeting-Briefs

Meeting Briefs: Frankfort Square Park District for May 15, 2025

At its annual organizational meeting, the Frankfort Square Park District Board of Commissioners swore in four members, re-elected its leadership, and reviewed its strong end-of-year financial report. The district’s funds...

Lincoln Way District 210 Achieves Highest Bond Rating in History

Lincoln Way Community High School District 210 has reached its highest-ever bond rating of AA3 from Moody's and A+ from Standard & Poor's, culminating a remarkable recovery from financial challenges...
Screenshot-2025-06-05-at-1.43.56-PM

District Recognizes Outstanding Student Readers in Statewide Program

Lincoln Way Community High School District 210 recognized exceptional students who completed the Read for a Lifetime program, with several achieving the rare distinction of reading 100 books over four...
Screenshot-2025-06-05-at-1.43.14-PM

Board Meeting Shorts

Budget Amendment Approved: The board approved amendments to the fiscal year 2025 budget totaling $121.7 million in revenue and $120.1 million in expenses. Changes primarily reflect bond proceeds and related...
Screenshot-2025-06-05-at-1.43.56-PM-1

Student Council Presidents Highlight Senior Year Accomplishments

Lincoln Way's three student council presidents delivered their final speeches of the school year, highlighting major accomplishments and memorable events before graduating this weekend. Jason Sro from Lincoln Way Central...
Screenshot-2025-06-16-at-3.26.08-PM-1

Will County Board Meeting Briefs Package

COUNTY APPOINTMENTS Fire Protection District: Board approved county executive appointments to Manhattan Fire Protection District board. Agricultural Committee: Approved appointment to Agricultural Area Committee with Member Judy Ogala abstaining due...
frankfort-park-district.1

Frankfort Park District Reorganizes Board, Explores Options for Tax-Impacting Projects

FRANKFORT – The Frankfort Park District Board seated its re-elected members, reorganized its leadership, and approved its new annual budget on Tuesday, while also revealing it is actively exploring options...
frankfort-park-district

Aging Sara Park Building Poses Challenge for Park District

The Frankfort Park District is grappling with how to address the deteriorating Sara Park building, whose roof is in "bad shape" and whose location within a flood plain complicates any...
frankfort-park-district.1

Meeting Briefs: Frankfort Park District Board for May 13, 2025

The Frankfort Park District Board of Commissioners re-elected its leadership team for a new term and approved its fiscal year 2025-2026 budget at its meeting on Tuesday. The board also...
lincoln-way-school-district

Lincoln-Way Board Approves Up to $31.3 Million Bond Sale for Safety, Security Upgrades

The Lincoln-Way Community High School District 210 Board of Education unanimously approved a resolution to issue up to $31.33 million in life safety bonds to fund a wide range of...
frankfort-square-park-district.2

Frankfort Square Park District Approves Budget Amid County Tax Adjustment, Funds Major Projects

The Frankfort Square Park District Board of Commissioners unanimously approved its operating budget for the 2025-2026 fiscal year during its April 17 meeting, earmarking funds for major ongoing projects and...
default

Lincoln-Way School Board Certifies Election, Re-elects Janik as President

The Lincoln-Way Community High School District 210 Board of Education officially reorganized for the upcoming year during its meeting on April 17, certifying the results of the April 1 consolidated...
lincoln-way-school-district

New Electricity Contract to Save Lincoln-Way Over $500,000 Next Year

Lincoln-Way High School District 210 is poised for significant energy cost savings after the Board of Education unanimously approved a new 54-month electric commodity contract with Direct Energy. The agreement,...
frankfort-square-park-district.1

Four New Commissioners to Join Frankfort Square Park District Board in May

Four newly elected commissioners are set to join the Frankfort Square Park District Board in May, following the April 1, 2025, Consolidated Election. Executive Director Audrey Marcquenski formally congratulated Lauren...
Meeting-Briefs

Meeting Briefs: Frankfort Square Park District for April 17, 2025

The Frankfort Square Park District Board of Commissioners met on April 17 to approve its annual budget, discuss new projects, and hear departmental updates. The district approved a nearly $5...