Screenshot 2026-05-21 at 5.01.25 PM

Frankfort Approves $1.1 Million in Fleet Upgrades and Sewer Infrastructure Contracts

Spread the love

Frankfort Village Board Meeting | May 18, 2026

Article Summary:
The Frankfort Village Board authorized more than $900,000 in public works fleet replacements, including a new Vactor truck and dump truck, and approved over $130,000 in sanitary sewer engineering agreements.

Fleet and Infrastructure Key Points:

  • Vactor Truck Purchase: The village will acquire a 2026 International Vactor truck from Standard Equipment Company for $605,860 to replace a worn 2008 model.

  • Dump Truck Upgrades: A $250,847 contract was awarded to Rush Truck Centers and Monroe Truck Equipment for a 2027 International dump truck with snow removal gear.

  • Sanitary Sewer Evaluation: Robinson Engineering was awarded $79,500 to inspect 124 manholes and 26,036 feet of sewer main in the Heritage Knolls and Founders Place subdivisions.

  • Trustee Abstention: Trustee Maura Rigoni abstained from voting on the sewer contracts due to her part-time employment with Robinson Engineering.


FRANKFORT — The Frankfort Village Board on Monday, May 18, 2026, approved over $1.1 million in capital equipment purchases and sewer maintenance agreements, reinforcing its public works fleet and utility infrastructure.

All of the purchases and professional services agreements were approved as part of the board’s unanimous consent agenda, following prior review and recommendations by the Committee of the Whole.

The largest single purchase authorized was a 2026 International Vactor truck from Standard Equipment Company. The vehicle is being purchased through the Sourcewell cooperative program at a cost not to exceed $605,860, with funding allocated from the village’s FY 2026-2027 capital budget.

According to public works officials, the village’s existing 2008 Vactor truck, which is used to clean storm sewers and perform hydro-excavating, has reached the end of its useful life. The village will determine at the time of delivery whether to trade in the 2008 model for a $20,000 credit or sell it at public auction.

Additionally, the board approved the purchase of a 2027 International HV507 dump truck equipped with heavy-duty snow removal equipment. The truck chassis will be provided by Rush Truck Centers for $112,728, while the dump body and snow plow package (including a mid-mount junior patrol wing) will be installed by Monroe Truck Equipment, Inc. for $137,782.

Along with title and municipal plate fees, the total cost for the dump truck is $250,847. It replaces a unit in the village’s 13-truck snow removal fleet that has suffered mechanical wear from road salt.

The third vehicle acquisition approved was a 2026 Ford F-350 4×4 pickup truck from Curry Motors of Frankfort for $49,997. The purchase matches state bid pricing. The board also authorized up to $15,000 in additional upfitting costs to equip the pickup with a snowplow, liftgate, toolbox, and utility lighting through separate vendors.

To clear the way for these sales, the board passed an ordinance declaring a 2005 International 7400 dump truck and a 2013 Chevrolet 1500 as surplus property, authorizing their disposal at a public auction.

In infrastructure developments, the board approved two professional engineering contracts with Robinson Engineering, Ltd.

The first contract, valued at $50,900, covers design, bidding, and construction services for the 2026 Manhole Rehabilitation project. Based on a 2025 sanitary sewer evaluation survey, the project will repair and seal 154 manholes to mitigate inflow and infiltration (I&I) of stormwater into the sanitary system. The total cost of the rehabilitation project is estimated at $544,960.

The second contract awards Robinson Engineering $79,500 to conduct the 2026 Jackson Creek Sanitary Sewer Evaluation Survey. The next phase of this ongoing study will inspect 124 manholes and approximately 26,036 linear feet of main in the Heritage Knolls and Founders Place subdivisions, as well as the Vans Drive industrial park. The cleaning and televising portion of the project, estimated at $206,725, will be bid separately.

Trustee Maura Rigoni abstained from voting on both Robinson Engineering contracts due to her part-time employment with the firm. The agreements passed 5-0 with the support of the remaining trustees.

Leave a Comment





Latest News Stories

Meeting-Briefs

Will County Public Works Committee Juliy 1 Meeting Briefs

ROAD CONTRACTS APPROVED Austin Tyler Construction Contract: The committee approved a $691,544 contract with Austin Tyler Construction for resurfacing River Road from East Frontage Road to Prairie Creek Bridge and...
About Us Website Header - 1

New Lenox Library Board Seats New Trustees, Reorganizes After Election

NEW LENOX – The New Lenox Public Library District Board of Trustees officially seated its newly elected members and reorganized its leadership and committee assignments for the new term at...
New-Lenox-School-122.3

New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects

The New Lenox School District 122 Board of Education has approved a comprehensive list of 56 maintenance and capital improvement projects to be completed over the summer, allocating a total...
new-lenox-fire-district-stations.3

New Lenox Fire District to Launch Comfort Dog Program for First Responders, Community

NEW LENOX – The New Lenox Fire Protection District is adding a four-legged member to its team after the Board of Trustees unanimously approved the creation of a new comfort...
new-lenox-library.2-1

Library’s ‘Studio’ Draws Record Crowds with New Tech and Creative Programs

NEW LENOX – The New Lenox Public Library’s creative hub, The Studio, is experiencing a surge in popularity, shattering attendance records and successfully launching new technology-driven programs, according to a...
New-Lenox-School-122.5

D122 to Spend $24,950 on Professional Enrollment Forecast

New Lenox School District 122 will hire an outside firm to conduct a comprehensive, 10-year enrollment forecast at an estimated cost of $24,950. The Board of Education approved an agreement...
frankfort illinois library logo graphic.1

Frankfort Library Secures $83K Grant for Reading Room, Financial Report Shows Strong Position

FRANKFORT, IL – The Frankfort Public Library is poised to begin its next major renovation after the State Library confirmed it has qualified for a matching grant of up to...
frankfort illinois library logo graphic.5

Frankfort Library Considers Limiting Digital Access on Educator Cards to Manage Costs

FRANKFORT, IL – The Frankfort Public Library is exploring a change to its digital lending policies for local educators to manage the rising costs and high demand for popular streaming...
frankfort illinois library logo graphic.1

Newly Appointed Trustee Brooks Stenoish Takes Oath, Finalizing Frankfort Library Board

FRANKFORT, IL – The Frankfort Public Library District Board of Trustees is now at its full seven-member strength after newly appointed trustee Brooks Stenoish was officially sworn in at Thursday...
Meeting-Briefs

Meeting Summary: Frankfort Public Library District for June 26, 2025

The Frankfort Public Library District Board of Trustees held its regular monthly meeting on Thursday. The board swore in its newest member, reviewed a strong year-end financial report, and approved...
JJC-Graphic-Logo

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement

The Joliet Junior College Board of Trustees on Wednesday approved a $322.3 million budget for fiscal year 2026, but not before a tense debate that saw a motion to postpone...
Screenshot-2025-07-06-at-9.50.39-AM

Lincoln Way District 210 Approves $2.1 Million Budget Amendment, Maintains Strong Financial Position

Lincoln Way Community High School District 210 board members unanimously approved an amended fiscal year 2025 budget Thursday night that increases the district's operating surplus to $2.1 million while maintaining...
Joliet-Junior-college.-Graphic-Logo.5

JJC’s ‘12x12x12’ Initiative Boosts College Credits, Increases Matriculation Rate

Joliet Junior College’s ambitious "12x12x12" initiative is yielding significant results, leading to more high school students earning college credits and a greater percentage of them choosing to attend JJC after...
Screenshot-2025-07-06-at-9.45.35-AM

District 210 Approves Administrative Restructuring, Staff Salary Increases

Lincoln Way Community High School District 210 board members approved administrative restructuring and salary increases for non-union clerical support staff during closed session actions Thursday night. The board unanimously approved...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct

An otherwise routine vote to approve monthly bill payments ignited a tense exchange at the Joliet Junior College Board of Trustees meeting Wednesday, revealing ongoing friction over redacted legal invoices,...