Will County P&Z Logo Planning Zoning.2

Zinc Leaching and Flooding Concerns Dominate Testimony at Will County Solar Hearing

Spread the love

Will County Board Special Planning and Zoning Commission Meeting | May 12, 2026

Article Summary: Expert and resident testimonies during Tuesday’s Planning and Zoning Commission meeting highlighted severe concerns over groundwater contamination and flooding if a 6,000-acre solar farm is built on hydric soils.

Environmental Impact Key Points:

  • A Will-South Cook Soil and Water Conservation District report (NRI #5824) classified the site as “essential farmland” with a LESA score of 236.

  • Approximately 2,152 acres of the proposed site contain hydric soils that present a high risk for steel corrosion.

  • A foundation drilling expert testified that driving raw galvanized steel posts into hydric soil could cause rapid corrosion, risking zinc leaching into local aquifers.

  • Residents from Green Garden Township presented video evidence of existing severe flooding on parcels adjacent to the proposed solar arrays.

A debate over soil chemistry, galvanized steel, and floodplains took center stage at the Will County Planning and Zoning Commission on Tuesday, May 12, 2026, as residents and experts warned of potential environmental disasters from the proposed Earthrise solar project.

During the court-ordered cross-examination hearing, plaintiffs focused heavily on Natural Resource Information Report #5824, prepared by the Will-South Cook Soil and Water Conservation District. The report calculated a Land Evaluation and Site Assessment (LESA) score of 236 for the property—classifying it as essential farmland—and noted that approximately 2,152 acres of the site consist of hydric soils.

Crucially, the report indicated that the site presents a “high” risk for steel corrosion. Plaintiff Attorney Steven Becker questioned Earthrise developers on their plan to drive an estimated 300,000 bare galvanized steel posts into the ground to support the 1.19 million solar modules.

To support the plaintiffs’ claims, Melissa Eager, an operating engineer with 30 years of experience in the caisson drilling industry, testified about the dangers of placing untreated steel into wet soils.

“Anything put into ground that is wet is going to eventually leach out,” Eager testified. “A pinhole into that galvanization will corrode… when put in a hydric soil or wet locations it’s usually anywhere from 3 to 5 years.”

Eager suggested that the posts should be coated in epoxy or encased in concrete. However, she warned that using heavy machinery to encase thousands of posts in concrete would heavily compact the area’s silty loam soil, creating a “hard pan” that would drastically increase surface erosion and water runoff.

Earthrise Lead Developer Robert Kalbouss and attorney Ben Jacobi refuted the claims, relying on prior testimony from their environmental scientist, Dr. Chris Olsen. Jacobi stated that any leaching from the galvanized steel would be minimal and isolated directly next to the pile, posing no threat to crops or groundwater.

“There is no evidence of or documented evidence of steel piles from solar facilities leaching into the groundwater. It doesn’t exist,” Jacobi said. “We don’t believe that our construction methods pose a risk to public health or agriculture.”

The potential for exacerbated runoff struck a nerve with neighboring property owners. Green Garden Township residents Jim Michalewicz and Donna Robinson presented photographs and video footage showing substantial standing water and flooding on their properties, which abut the proposed solar parcels.

Robinson showed video of her yard flooding on three sides, noting that neighboring landowners had failed to maintain culverts, causing water to back up onto her property. She expressed deep concern that industrial development on the adjacent fields would push even more water into her yard.

Becker underscored these concerns, pointing out that the Earthrise project footprint sits near the headwaters of Fork Creek, Prairie Creek, and Hickory Creek. He warned the commission that any groundwater contamination could easily travel into these tributaries, potentially violating the federal Clean Water Act.

⚠️ Air Quality Alert issued July 14 at 11:23AM CDT by NWS Chicago IL
⚠️ Air Quality Alert issued July 14 at 11:23AM CDT by NWS Chicago IL
⚠️ Air Quality Alert issued July 13 at 11:44AM CDT by NWS Chicago IL
Today Jul 13
Mostly Clear
73°

Mostly Clear

Leave a Comment





Latest News Stories

Arrest.1

Frankfort Man Arrested by State Police for Threatening Governor Pritzker

Article Summary: A 71-year-old Frankfort resident is facing felony and misdemeanor charges after Illinois State Police investigators linked him to a series of threatening voicemails left for Governor JB Pritzker....
will county Committee-Capital Improvement.Graphic

Meeting Summary and Briefs: Capital Improvements & IT Committee for March 3, 2026

Capital Improvements & IT Committee Meeting | March 2026 The Will County Capital Improvements and IT Committee met on Tuesday to address the county's physical and digital infrastructure. The meeting...
frankfort village hall graphic logo.8

Meeting Summary and Briefs: Frankfort Village Board for March 16, 2026

Frankfort Village Board Meeting | March 16, 2026 The Frankfort Village Board met on Monday, March 16, 2026, with Trustee Adam Borrelli presiding as Mayor Pro-Tempore in the absence of...
Screenshot

Updated: St. John Woman Charged with Nine Counts of Murder in Crete Township Triple Homicide

Article Summary: Jenna Strouble, 30, of St. John, Indiana, has been charged with nine counts of first-degree murder following the shooting deaths of her former partner, Jacob Lambert, and his...

Will County Previews ‘GuideWill’ Comprehensive Resource Management Plan

Will County Land Use & Development Committee Meeting | March 2026 Article Summary: Will County's Land Use Department unveiled the branding, interactive tools, and initial timeline for its updated Resource Management...
Will County Board Graphic.04

Will County Targets May Draft for Comprehensive Artificial Intelligence Policy

Capital Improvements & IT Committee Meeting | March 2026 Article Summary:Will County is moving closer to adopting a formal Artificial Intelligence policy, with IT staff planning to deliver a comprehensive...
frankfort village hall graphic logo.7

Frankfort Approves $150,777 Contract for Detached Storage Garage at 2 Smith Street

Frankfort Village Board Meeting | March 16, 2026 Article Summary: The Village Board awarded a bid to Algat Enterprises Group Co. Inc. to construct a new detached garage in downtown...
Will County P&Z Logo Planning Zoning.2

P&Z Commission Approves Side Yard Setback Variance for Joliet Detached Garage

Will County Planning and Zoning Commission Meeting | March 3, 2026 Article Summary: The Will County Planning and Zoning Commission approved a variance to reduce a side yard setback on...
Will County Board Graphic.01

Executive Committee Advances Sweeping Overhaul of Will County Business Regulations

Will County Executive Committee Meeting | March 12, 2026 Article Summary: Will County is poised to modernize its business regulations following the Executive Committee's unanimous approval of a massive ordinance overhaul....
Will County Finance Logo

Will County Closes Out $16.2 Million Federal Rental Assistance Program, Transitions to Local Funding

Will County Finance Committee Meeting | March 3, 2026 Article Summary: Will County has officially closed out its massive federal Emergency Rental Assistance program after distributing millions to keep nearly 2,000...
Will County P&Z Logo Planning Zoning

Meeting Summary and Briefs: Will County Planning and Zoning Commission for March 3, 2026

Will County Planning and Zoning Commission Meeting | March 3, 2026 Overall Meeting SummaryThe Will County Planning and Zoning Commission convened on Tuesday, March 3, 2026, to review a series...
will county Committee-Capital Improvement.Graphic

Will County Leaders Debate New Construction to Escape $1.2 Million in Leases

Capital Improvements & IT Committee Meeting | March 2026 Article Summary: The Will County Capital Improvements and IT Committee is aggressively exploring options to consolidate county offices and exit leased...
Will County Finance Logo

Opioid Settlement Grants Funnel Nearly $600,000 to Local Police and Community Programs

Will County Finance Committee Meeting | March 3, 2026 Article Summary: Will County is distributing a significant portion of its opioid settlement funds to hyper-local agencies, including the Peotone and Manhattan...
Will County Finance Logo

Meeting Summary and Briefs: Will County Finance Committee for March 3, 2026

Will County Finance Committee Meeting | March 3, 2026 The Will County Board Finance Committee met on Tuesday to review a slate of year-end financial reports and approve routine budget...
frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Frankfort Village Board Meeting | March 16, 2026 Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over...