Will County Board Graphic.01

Millions Approved for Will County Highway and Road Infrastructure Projects

Spread the love

Will County Board Meeting | April 16, 2026

Article Summary: The Will County Board authorized nearly $4.3 million in road improvement contracts, targeting key corridors including Francis Road, Renwick Road, and Laraway Road.

Infrastructure Key Points:

  • Austin Tyler Construction was awarded a $2,984,218.25 contract to rebuild and widen Francis Road.

  • P.T. Ferro Construction secured a $958,266.60 contract to resurface Renwick Road.

The Will County Board on Thursday, April 16, 2026, greenlit a slate of major infrastructure investments across the region, passing multiple resolutions on the consent agenda without opposition.

The largest expenditure was authorized by Resolution 26-113, which awarded a $2,984,218.25 contract to Austin Tyler Construction, Inc. The Elwood-based firm was the low bidder for a comprehensive project on Francis Road (County Highway 64) from Gougar Road to Wirt Road in County Board District 5. The scope of work includes roadway reconstruction and widening, storm sewer installation, drainage ditch improvements, culvert reconstruction, and retaining wall installation. The project is slated to begin in June 2026, during which the road will be closed to through traffic.

In Plainfield Township, the Board approved Resolution 26-114, confirming a $958,266.60 contract with Joliet-based P.T. Ferro Construction Co. The firm will resurface Renwick Road (CH 36) from east of U.S. Route 30 to west of Weber Road. The project, which also begins in June, will utilize Hot-Mix Asphalt (HMA) surface removal and replacement, centerline rumble strips, and deck slab repairs. The roadway will remain open during construction with periodic lane closures guided by flaggers. P.T. Ferro also secured a separate $194,014.90 contract (RES 26-115) to resurface various subdivision roadways within the Plainfield Road District.

The Board also took action on Laraway Road in New Lenox. Resolution 26-112 authorizes an agreement with LNS Development Group, LLC for stormwater management improvements along Laraway Road between Cedar Road and Spencer Road. The county will reimburse the developer an estimated $352,071.95 for the construction of a shared detention facility and storm sewer upgrades required for the county’s future plans to widen Laraway to a four-lane, barrier-median roadway.

Leave a Comment





Latest News Stories

Pritzker: Chicago mayor 'never once called' to oppose pension bill

Pritzker: Chicago mayor ‘never once called’ to oppose pension bill

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker says Chicago Mayor Brandon Johnson never called him to oppose a pension bill...
WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

By Jim Talamonti | The Center SquareThe Center Square Cook County, Chicago declare flood disaster Chicago Mayor Brandon Johnson and Cook County Board President Toni Preckwinkle have issued respective disaster...
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – While Gov. J.B. Pritzker jokes on national TV that Illinois’ congressional maps were drawn by kindergartners, a...
Frankfort Meeting 8.4.25

Frankfort to Implement 1% Grocery Tax, Replacing State Levy to Preserve Revenue

FRANKFORT – Frankfort residents will see no change at the grocery checkout line, but the village will preserve a key revenue stream after the Village Board approved an ordinance Monday...
frankfort village hall graphic logo.1

Frankfort to Sell Vacant Downtown Property Valued at $325,000 for Commercial Redevelopment

FRANKFORT – The Village of Frankfort is officially putting a prime piece of vacant, village-owned land in its historic downtown up for sale, aiming to spur immediate commercial redevelopment. The...
frankfort village hall graphic logo.8

New Sushi Restaurant ‘The Orange Hat’ Approved for Frankfort

FRANKFORT – A new full-service sushi restaurant, The Orange Hat, is set to open in the Hickory Creek Market Place after the Village Board approved a special use permit for...
frankfort village hall graphic logo.7

Village Board Approves Zoning Variances for New Custom Home on Bowen Street

FRANKFORT – The Frankfort Village Board on Monday approved two zoning variances for a new custom home at 50 E. Bowen Street, allowing the builder to use non-masonry siding and...
Meeting-Briefs

Meeting Summary: Frankfort Village Board for August 4, 2025

The Frankfort Village Board met on Monday, August 4, 2025, to address several key ordinances and conduct village business. The board approved a measure to replace the state's expiring 1%...
Fire-Ambulance-Rescue-Logo

Indiana Woman Identified as Victim in Fatal Wilmington-Peotone Road Crash

The Will County Coroner’s Office has officially identified the woman killed in Tuesday’s fatal crash on Wilmington-Peotone Road as 70-year-old Judith L. Stirm of Delphi, Indiana. In a statement, Coroner...
Frankfort-Police-Rescue

Multiple Agencies Rescue Person in Mental Health Crisis from Frankfort Pond

A person experiencing a mental health crisis was safely rescued from a pond near 80th Avenue in Lakeview Estates on Wednesday after a coordinated response by multiple emergency agencies. Frankfort...
Green-Garden-Logo.WP

Green Garden Township Forges Ahead with New Town Hall Plan, Faces Budget and Neighbor Concerns

The Green Garden Township Board is advancing an ambitious plan to build a new, larger town hall and community center on a six-acre parcel south of its current location, a...
Meeting-7.28.25

IT Consultant Urges Green Garden Township to Adopt Modern Cybersecurity Measures

Green Garden Township’s digital infrastructure is vulnerable to cybercrime and requires an immediate overhaul, including adopting a modern, secure email system and multifactor authentication, an IT consultant told the board...
Meeting-Briefs

Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025

The Frankfort Township Board on Monday, June 9, 2025, approved its primary financial documents for the upcoming fiscal year, passing separate and balanced budget appropriation ordinances for the township and...
Sanchez

Sanchez Family Unveils Major Redevelopment Plan for Monee Industrial Property

Article Summary: Developer Luis Sanchez, a key figure in Monee's commercial growth for two decades, presented a plan to revitalize an industrial property on Industrial Drive. The project, which includes...