Millions Approved for Will County Highway and Road Infrastructure Projects
Will County Board Meeting | April 16, 2026
Article Summary: The Will County Board authorized nearly $4.3 million in road improvement contracts, targeting key corridors including Francis Road, Renwick Road, and Laraway Road.
Infrastructure Key Points:
-
Austin Tyler Construction was awarded a $2,984,218.25 contract to rebuild and widen Francis Road.
-
P.T. Ferro Construction secured a $958,266.60 contract to resurface Renwick Road.
The Will County Board on Thursday, April 16, 2026, greenlit a slate of major infrastructure investments across the region, passing multiple resolutions on the consent agenda without opposition.
The largest expenditure was authorized by Resolution 26-113, which awarded a $2,984,218.25 contract to Austin Tyler Construction, Inc. The Elwood-based firm was the low bidder for a comprehensive project on Francis Road (County Highway 64) from Gougar Road to Wirt Road in County Board District 5. The scope of work includes roadway reconstruction and widening, storm sewer installation, drainage ditch improvements, culvert reconstruction, and retaining wall installation. The project is slated to begin in June 2026, during which the road will be closed to through traffic.
In Plainfield Township, the Board approved Resolution 26-114, confirming a $958,266.60 contract with Joliet-based P.T. Ferro Construction Co. The firm will resurface Renwick Road (CH 36) from east of U.S. Route 30 to west of Weber Road. The project, which also begins in June, will utilize Hot-Mix Asphalt (HMA) surface removal and replacement, centerline rumble strips, and deck slab repairs. The roadway will remain open during construction with periodic lane closures guided by flaggers. P.T. Ferro also secured a separate $194,014.90 contract (RES 26-115) to resurface various subdivision roadways within the Plainfield Road District.
The Board also took action on Laraway Road in New Lenox. Resolution 26-112 authorizes an agreement with LNS Development Group, LLC for stormwater management improvements along Laraway Road between Cedar Road and Spencer Road. The county will reimburse the developer an estimated $352,071.95 for the construction of a shared detention facility and storm sewer upgrades required for the county’s future plans to widen Laraway to a four-lane, barrier-median roadway.
Latest News Stories
Meeting Summary and Briefs: Joliet Junior College Board for Dec. 10, 2025
District 210 Awards $24.4 Million Contract for Major HVAC Upgrades
The Lakota Group Tapped for Historic Downtown Frankfort Design Study
Mental Health Board Updates Committee on 2026 Grant Cycle and Funding Priorities
Clean Audit Reveals $8.5 Million Increase in District 161 Net Position
PZC Approves Homer Township Landscape Business Despite Neighbor Concerns; Adds Berm Condition
JJC Foundation Executive Director Retires Following $2.3 Million Estate Gift
Lincoln-Way Board Approves $92.5 Million Tax Levy for 2025
Summit Hill District 161 Board Approves $44.8 Million Tax Levy with Slight Overall Decrease
Frankfort Board Approves 2025 Tax Levy with Projected Rate Decrease
Interim Chief Interviews for Permanent Job as Frankfort Fire Board Meets in Closed Session
Liquor License Amendments Approved for Frankfort, Joliet, and Lockport Businesses
Frankfort Fire Trustees Hire Illinois Fire Chiefs Association to Assist in Chief Search; One Trustee Dissents
Meeting Summary and Briefs: Will County Planning and Zoning Commission for December 16, 2025