Board Establishes New Regulations and Fees for Wireless Telecommunication Facilities
Will County Board Meeting | April 16, 2026
Article Summary: In response to the state’s Small Wireless Facilities Deployment Act, the Will County Board passed Ordinance 26-134 to manage the collocation of small cell towers and wireless equipment within county rights-of-way.
Wireless Telecommunication Facilities Key Points:
-
Sets a $450 application fee for a single wireless facility on an existing structure.
-
Mandates an annual recurring rate of $200 per location for facilities placed on county-owned infrastructure.
-
Limits above-ground ancillary equipment volume to 25 cubic feet.
The Will County Board on Thursday, April 16, 2026, unanimously passed Ordinance 26-134, establishing Chapter 122 of the Business Regulations to oversee Wireless Telecommunication Facilities. The 20-0 vote formalizes the county’s permitting process and fee structure in alignment with the Illinois Small Wireless Facilities Deployment Act (50 ILCS 840).
The ordinance grants the Will County Division of Transportation the authority to regulate where and how telecommunication providers install new equipment, particularly “small cell” nodes used to boost cellular and Wi-Fi networks.
According to the approved text, companies must pay a $450 non-refundable application fee to collocate a facility on an existing structure. If the equipment is mounted on county-owned infrastructure, such as a traffic signal or streetlight, the provider must pay an annual recurring fee of $200 per location, or an amount equal to the county’s direct costs, whichever is greater.
The legislation mandates strict physical limitations to prevent visual clutter and right-of-way hazards. Antennas attached to existing structures cannot exceed ten feet above the tallest existing structure within 300 feet, or a maximum height of 45 feet above ground level. Furthermore, the total combined volume of all above-ground equipment (excluding the antenna, meters, and connection cables) is capped at 25 cubic feet.
To protect county assets, providers must submit a structural integrity analysis prepared by a licensed Illinois engineer ensuring the pole can handle wind and ice loads. Providers are completely financially responsible for any damage caused to county infrastructure during installation or maintenance and must provide a $20,000 performance bond to guarantee right-of-way restoration.
Violations of the chapter, including unauthorized installations or failure to remove abandoned equipment, will result in fines of $750 or twice the assessed application fee, whichever is greater, per day.
Latest News Stories
Americans prepare to spend $1 trillion this holiday shopping season
Gas prices ahead of Thanksgiving holding steady
Illinois quick hits: Migrant youth allegedly murdered homeless Chicago man
WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president
Illinois business group warns of ‘backbreaking’ progressive income tax
Illinois tops U.S. in pumpkin production despite recent decline in value
Congress moves to restore federal union powers, critics warn of higher costs
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation
Meeting Summary and Briefs: Village of Frankfort for November 17, 2025
Lincoln-Way 210 Receives Clean Audit, Financial Profile Score Downgraded to ‘Review’
Committee Grants Lenox Solar Farm Project Six-Month Variance Extension
Frankfort 157-C Implements New Plan to Combat Chronic Student Absenteeism