Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Village Board Greenlights Dutch Bros Coffee Drive-Through on LaGrange Road

Spread the love

Frankfort Village Board Meeting | April 20, 2026

Article Summary: The Village Board approved a series of Special Use Permits and a Major Change to a Planned Unit Development to allow the construction of a new Dutch Bros Coffee location, featuring a drive-through and walk-up window, in the Frankfort Crossing shopping center.

Dutch Bros Coffee Key Points:

  • The 1,264-square-foot coffee shop will be built on the final vacant lot (Lot 1) in the Market Street West Retail Development, just north of Potbelly.

  • The Board approved extended operating hours, allowing the business to open at 5:00 a.m. to accommodate early commuters.

  • The site plan provides 29 parking spaces, exceeding the 13 required by code, and features a dual-lane drive-through capable of stacking up to 17 vehicles, with an overflow plan to handle up to 37 cars.

  • Final construction is contingent upon written approval from Potbelly regarding shared access easement modifications.

The Frankfort Village Board on Monday, April 20, 2026, paved the way for a new coffee option in town, unanimously approving a Major Change to a Planned Unit Development (PUD) and three Special Use Permits for a Dutch Bros Coffee location at 20900 S. LaGrange Road.

The new ±1,264-square-foot establishment will occupy Lot 1 of the Buona Frankfort Subdivision, serving as the final piece of the Market Street West Retail Development. Dutch Bros Coffee operates primarily as a drive-through and walk-up model without interior customer seating.

To accommodate this unique business model, the Board passed Ordinance No. 3559 to approve the PUD Major Change and Ordinance No. 3560 to grant Special Use Permits for a carry-out restaurant, drive-up service windows, and extended hours of operation. The extended hours allow the shop to operate from 5:00 a.m. to 11:00 p.m., seven days a week.

Trustee Gene Savaria presented the item, noting the applicant requested several modifications from standard Village requirements. These included a waiver of the enclosure of operations requirement to allow for the walk-up window, permission to install a single-color wall sign on the south building wall facing Lot 2, an allowance for a second wall sign on the east building elevation, and permission to install a snap-frame menu board on the north wall. The Board also approved increasing the maximum pre-sale menu board area from 10 square feet to 10.7 square feet.

Traffic and stacking efficiency were central to the proposal’s review. The site plan boasts 29 parking spaces—well above the Village’s requirement of 13—including three dedicated spaces for mobile order pick-ups. The dual-lane drive-through is designed to stack 17 vehicles within the curb-protected area and features a 12.5-foot bypass lane for exiting customers.

According to the business narrative submitted by Eric Pedersen of Keystone Planning & Design, Dutch Bros employs “Runners” equipped with tablets to take orders in line, keeping the queue moving efficiently with an average wait time of 45 seconds. Should traffic exceed the 17-car capacity, staff will be deployed to direct an additional nine vehicles to queue along the north edge of the parking lot. In extreme peak conditions, up to 11 more vehicles can stack along the west side of the site, accommodating a total of 37 vehicles before impacting the main shared access drive to LaGrange Road. The applicant has also committed to hiring off-duty police officers to direct traffic during the opening weeks.

Aesthetically, the building’s architecture was designed to harmonize with the existing PUD. Following feedback from the Plan Commission, the applicant agreed to use full-dimensional masonry, specifically Modular Brick Veneer in “Belcrest 560” and split-face stone in “Riesling,” matching the adjacent Verizon, CD One Price Cleaners, and Potbelly buildings. The applicant also agreed to maintain a gray metal cornice rather than their corporate blue, and relocated the building’s address numbers to the window glass to maintain consistency with the plaza.

Final approval remains conditioned upon the applicant obtaining written consent from the property and business owners of Potbelly (Lot 2) regarding the proposed drive-through lane and necessary access easement modifications.

Leave a Comment





Latest News Stories

U.S.-Iran talks stalled after Israel-Hezbollah fighting

U.S.-Iran talks stalled after Israel-Hezbollah fighting

By Andrew RiceThe Center Square Vice President JD Vance and negotiators in Iran have delayed peace talks and a planned formal signing of a peace agreement between the U.S. and...
P.T. Ferro

Frankfort Awards $4.46 Million Road Resurfacing Contract to P.T. Ferro

Frankfort Village Board Meeting | June 15, 2026 Article Summary: The Frankfort Village Board on Monday, June 15, 2026, awarded a $4,460,120.95 contract to P.T. Ferro Construction Co. for the...
California’s billionaire tax officially heads to Nov. 3 ballot

California’s billionaire tax officially heads to Nov. 3 ballot

By Madeline ShannonThe Center Square The controversial union-backed billionaire tax in California is officially heading to the Nov. 3 ballot. Secretary of State Shirley Weber announced the California Billionaire Tax...
Los Angeles County on track to raise sales tax to 10.25%

Los Angeles County on track to raise sales tax to 10.25%

By Chris WoodwardThe Center Square A measure to raise the sales tax to 10.25% - intended to temporarily inject funds into Los Angeles County’s public healthcare safety net - continues...

EXCLUSIVE: Individual targeted in foiled UFC terror plot speaks out

By Thérèse BoudreauxThe Center Square One of the targets in the alleged terror plot to disrupt the Ultimate Fighting Championship event at the White House says he is not intimidated...
Police Crime

Frankfort Police, Volunteers Reunite Missing Boy With Autism After Overnight Search

Frankfort Village Board Meeting | June 15, 2026 Article Summary: Frankfort Police Chief Leanne Chelepis told the Village Board on Monday, June 15, 2026, that an 11-year-old boy with autism...
Disability-rights advocates sue Illinois over physician-assisted suicide law

Disability-rights advocates sue Illinois over physician-assisted suicide law

By Sean Reed | The Center SquareThe Center Square (The Center Square) – A law that is set to legalize physician-assisted suicide in Illinois is being challenged by disability-rights advocates...
Supreme Court backs gun rights for marijuana users in 9-0 decision

Supreme Court backs gun rights for marijuana users in 9-0 decision

By Andrew RiceThe Center Square Gun rights advocates celebrated the U.S. Supreme Court’s decision on Thursday to allow occasional marijuana users to possess firearms. Justices on the high court ruled...
Iran deal omits terror proxies, ballistic missiles, human rights

Iran deal omits terror proxies, ballistic missiles, human rights

By Sarah Roderick-FitchThe Center Square With President Donald Trump signing the memorandum of understanding with Iran, the latest agreement ushers in a new round of talks with the Islamic Republic...
'No kings' at $830 million Obama Center opening

‘No kings’ at $830 million Obama Center opening

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Former President Barack Obama has opened his presidential center in Chicago by saying the United States was...
Alleged UFC White House ringleader was in US illegally

Alleged UFC White House ringleader was in US illegally

By Bethany BlankleyThe Center Square The alleged ringleader of a planned terrorist attack targeting the White House was in the country illegally, had overstayed his tourist visa for more than...
'Policy blunder' or 'pathway to peace': Republicans divided over Iran deal

‘Policy blunder’ or ‘pathway to peace’: Republicans divided over Iran deal

By Thérèse BoudreauxThe Center Square President Donald Trump signed the temporary peace deal with Iran ahead of schedule Wednesday at the Palace of Versailles in France, kicking off negotiations over...
Second produced water treatment pilot facility online in Permian Basin

Second produced water treatment pilot facility online in Permian Basin

By Bethany BlankleyThe Center Square The second produced water treatment pilot facility (JIP 2) is online in the Permian Basin in west Texas. It was launched by Western Midstream Partners...
Bill provides access to customized gene therapies, medicines

Bill provides access to customized gene therapies, medicines

By Zachery SchmidtThe Center Square A new congressional bill would give patients with life-threatening diseases access to customized gene therapies and medicines. The Right to Try for Individualized Treatments Act,...
Illinois Quick Hits: State unemployment rate remains more than 5%

Illinois Quick Hits: State unemployment rate remains more than 5%

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois Department of Employment Security announced on Thursday that the state’s unemployment rate remained unchanged at...