Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Village Board Greenlights Dutch Bros Coffee Drive-Through on LaGrange Road

Spread the love

Frankfort Village Board Meeting | April 20, 2026

Article Summary: The Village Board approved a series of Special Use Permits and a Major Change to a Planned Unit Development to allow the construction of a new Dutch Bros Coffee location, featuring a drive-through and walk-up window, in the Frankfort Crossing shopping center.

Dutch Bros Coffee Key Points:

  • The 1,264-square-foot coffee shop will be built on the final vacant lot (Lot 1) in the Market Street West Retail Development, just north of Potbelly.

  • The Board approved extended operating hours, allowing the business to open at 5:00 a.m. to accommodate early commuters.

  • The site plan provides 29 parking spaces, exceeding the 13 required by code, and features a dual-lane drive-through capable of stacking up to 17 vehicles, with an overflow plan to handle up to 37 cars.

  • Final construction is contingent upon written approval from Potbelly regarding shared access easement modifications.

The Frankfort Village Board on Monday, April 20, 2026, paved the way for a new coffee option in town, unanimously approving a Major Change to a Planned Unit Development (PUD) and three Special Use Permits for a Dutch Bros Coffee location at 20900 S. LaGrange Road.

The new ±1,264-square-foot establishment will occupy Lot 1 of the Buona Frankfort Subdivision, serving as the final piece of the Market Street West Retail Development. Dutch Bros Coffee operates primarily as a drive-through and walk-up model without interior customer seating.

To accommodate this unique business model, the Board passed Ordinance No. 3559 to approve the PUD Major Change and Ordinance No. 3560 to grant Special Use Permits for a carry-out restaurant, drive-up service windows, and extended hours of operation. The extended hours allow the shop to operate from 5:00 a.m. to 11:00 p.m., seven days a week.

Trustee Gene Savaria presented the item, noting the applicant requested several modifications from standard Village requirements. These included a waiver of the enclosure of operations requirement to allow for the walk-up window, permission to install a single-color wall sign on the south building wall facing Lot 2, an allowance for a second wall sign on the east building elevation, and permission to install a snap-frame menu board on the north wall. The Board also approved increasing the maximum pre-sale menu board area from 10 square feet to 10.7 square feet.

Traffic and stacking efficiency were central to the proposal’s review. The site plan boasts 29 parking spaces—well above the Village’s requirement of 13—including three dedicated spaces for mobile order pick-ups. The dual-lane drive-through is designed to stack 17 vehicles within the curb-protected area and features a 12.5-foot bypass lane for exiting customers.

According to the business narrative submitted by Eric Pedersen of Keystone Planning & Design, Dutch Bros employs “Runners” equipped with tablets to take orders in line, keeping the queue moving efficiently with an average wait time of 45 seconds. Should traffic exceed the 17-car capacity, staff will be deployed to direct an additional nine vehicles to queue along the north edge of the parking lot. In extreme peak conditions, up to 11 more vehicles can stack along the west side of the site, accommodating a total of 37 vehicles before impacting the main shared access drive to LaGrange Road. The applicant has also committed to hiring off-duty police officers to direct traffic during the opening weeks.

Aesthetically, the building’s architecture was designed to harmonize with the existing PUD. Following feedback from the Plan Commission, the applicant agreed to use full-dimensional masonry, specifically Modular Brick Veneer in “Belcrest 560” and split-face stone in “Riesling,” matching the adjacent Verizon, CD One Price Cleaners, and Potbelly buildings. The applicant also agreed to maintain a gray metal cornice rather than their corporate blue, and relocated the building’s address numbers to the window glass to maintain consistency with the plaza.

Final approval remains conditioned upon the applicant obtaining written consent from the property and business owners of Potbelly (Lot 2) regarding the proposed drive-through lane and necessary access easement modifications.

⚠️ Severe Thunderstorm Warning issued July 27 at 12:51PM CDT until July 27 at 1:30PM CDT by NWS Chicago IL
⚠️ Extreme Heat Warning issued July 27 at 9:33AM CDT until July 27 at 9:00PM CDT by NWS Chicago IL
Today Jul 26
Slight Chance Showers And Thunderstorms
90° 70°

Slight Chance Showers And Thunderstorms

💨 10 to 15 mph 💧 23%

Leave a Comment





Latest News Stories

New-Lenox-School-122.6

Staffing Shortage Leads D122 to Renew Contract for School Psychologist

Facing a persistent staffing shortage for a critical role, the New Lenox School District 122 Board of Education has renewed its contract with an outside agency to provide a school...
Meeting-Briefs

Meeting Summary: New Lenox Township for June 12, 2025

At its June 12 meeting, the New Lenox Township Board of Trustees heard reports on rising demand for community services, discussed ongoing maintenance projects, and assigned responsibilities to its newly...
New-Lenox-Village-Board.4

New Lenox Approves Major Residential Subdivision, Paves Way for Route 6 Commercial Growth

NEW LENOX – The Village Board took decisive action on two major developments Monday, giving final approval to a 55-lot residential subdivision for "empty nesters" and clearing a key hurdle...
New-Lenox-Sharons-Bay-Park

Contractor Selected for Sharon’s Bay Park Redevelopment

NEW LENOX – The New Lenox Community Park District is moving forward with plans to redevelop Sharon's Bay Park, having approved a contractor for the project at its Wednesday meeting....
New-Lenox-Sharons-Bay-Park

Contractor Selected for Sharon’s Bay Park Redevelopment

NEW LENOX – The New Lenox Community Park District is moving forward with plans to redevelop Sharon's Bay Park, having approved a contractor for the project at its Wednesday meeting....
New-Lenox-School-122.5

Handbook Changes at D122 Include Swapping PSAT for PreACT

Students in New Lenox School District 122 will see several changes in the upcoming school year, as the Board of Education approved updates to the 2025-2026 Parent/Student Handbook that affect...
frankfort fire district graphic logo.6

Frankfort Fire District Explores Hiring Consultant for Community Outreach, Potential Referendum

Article Summary: The Frankfort Fire Protection District is considering hiring a consulting firm to enhance its community outreach and gauge public support for a potential future referendum. Trustees heard a...
New-Lenox-Police.3

New Dining Options Coming as Village Approves Hot Dog Stand, Restaurant Patio

NEW LENOX – The local dining scene is set for a boost after the Village Board on Monday approved plans for a new hot dog stand and an outdoor patio...
Meeting-Briefs

Meeting Summary: New Lenox Park District for June 18, 2025

The New Lenox Community Park District Board of Commissioners met on June 18, 2025, to approve its annual budget, advance key park projects, and hear updates on a wide range...
Screenshot-2025-08-13-at-2.11.44-PM

Monee Board Sets Spending Plan with 2025-2026 Appropriations Ordinance

Article Summary: The Monee Village Board has approved its annual appropriations ordinance, which acts as the village's legal spending authority for the fiscal year that began May 1, 2025. The...
New-Lenox-School-122.3

New Lenox School District 122 Honors State Track and Field Athletes

New Lenox School District 122 took time during its June 17 board meeting to celebrate the outstanding achievements of its junior high athletes at the 2025 IESA State Track and...
frankfort fire district graphic logo.2

Frankfort Fire District Updates Sick Leave Policy for Non-Union Employees

Article Summary: The Frankfort Fire Protection District has approved updates to its administrative sick leave policy, aligning the benefits for non-union staff with those in the firefighters' collective bargaining agreement....

Fiber Optic Internet Competition Coming to New Lenox

NEW LENOX – Residents may soon have a new choice for high-speed internet, as Champaign-based Pavlov Media announced its intention to build out a fiber optic network across the village....
Screenshot-2025-08-13-at-2.15.28-PM

Monee Officials Issue Pool Safety Alert Amid Summer Heat

Article Summary: Following an increase in new pool installations, Monee's Building Services department is reminding residents of mandatory permit and safety requirements. Officials are emphasizing life-safety measures to prevent drownings,...
New-Lenox-Village-Board

Village Board Approves Millions in Spending on Roads, Parks, and Museum

NEW LENOX – The New Lenox Village Board authorized millions of dollars in spending on Monday for its annual road program and for continued investment in its newest community amenities,...