Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Village Board Greenlights Dutch Bros Coffee Drive-Through on LaGrange Road

Spread the love

Frankfort Village Board Meeting | April 20, 2026

Article Summary: The Village Board approved a series of Special Use Permits and a Major Change to a Planned Unit Development to allow the construction of a new Dutch Bros Coffee location, featuring a drive-through and walk-up window, in the Frankfort Crossing shopping center.

Dutch Bros Coffee Key Points:

  • The 1,264-square-foot coffee shop will be built on the final vacant lot (Lot 1) in the Market Street West Retail Development, just north of Potbelly.

  • The Board approved extended operating hours, allowing the business to open at 5:00 a.m. to accommodate early commuters.

  • The site plan provides 29 parking spaces, exceeding the 13 required by code, and features a dual-lane drive-through capable of stacking up to 17 vehicles, with an overflow plan to handle up to 37 cars.

  • Final construction is contingent upon written approval from Potbelly regarding shared access easement modifications.

The Frankfort Village Board on Monday, April 20, 2026, paved the way for a new coffee option in town, unanimously approving a Major Change to a Planned Unit Development (PUD) and three Special Use Permits for a Dutch Bros Coffee location at 20900 S. LaGrange Road.

The new ±1,264-square-foot establishment will occupy Lot 1 of the Buona Frankfort Subdivision, serving as the final piece of the Market Street West Retail Development. Dutch Bros Coffee operates primarily as a drive-through and walk-up model without interior customer seating.

To accommodate this unique business model, the Board passed Ordinance No. 3559 to approve the PUD Major Change and Ordinance No. 3560 to grant Special Use Permits for a carry-out restaurant, drive-up service windows, and extended hours of operation. The extended hours allow the shop to operate from 5:00 a.m. to 11:00 p.m., seven days a week.

Trustee Gene Savaria presented the item, noting the applicant requested several modifications from standard Village requirements. These included a waiver of the enclosure of operations requirement to allow for the walk-up window, permission to install a single-color wall sign on the south building wall facing Lot 2, an allowance for a second wall sign on the east building elevation, and permission to install a snap-frame menu board on the north wall. The Board also approved increasing the maximum pre-sale menu board area from 10 square feet to 10.7 square feet.

Traffic and stacking efficiency were central to the proposal’s review. The site plan boasts 29 parking spaces—well above the Village’s requirement of 13—including three dedicated spaces for mobile order pick-ups. The dual-lane drive-through is designed to stack 17 vehicles within the curb-protected area and features a 12.5-foot bypass lane for exiting customers.

According to the business narrative submitted by Eric Pedersen of Keystone Planning & Design, Dutch Bros employs “Runners” equipped with tablets to take orders in line, keeping the queue moving efficiently with an average wait time of 45 seconds. Should traffic exceed the 17-car capacity, staff will be deployed to direct an additional nine vehicles to queue along the north edge of the parking lot. In extreme peak conditions, up to 11 more vehicles can stack along the west side of the site, accommodating a total of 37 vehicles before impacting the main shared access drive to LaGrange Road. The applicant has also committed to hiring off-duty police officers to direct traffic during the opening weeks.

Aesthetically, the building’s architecture was designed to harmonize with the existing PUD. Following feedback from the Plan Commission, the applicant agreed to use full-dimensional masonry, specifically Modular Brick Veneer in “Belcrest 560” and split-face stone in “Riesling,” matching the adjacent Verizon, CD One Price Cleaners, and Potbelly buildings. The applicant also agreed to maintain a gray metal cornice rather than their corporate blue, and relocated the building’s address numbers to the window glass to maintain consistency with the plaza.

Final approval remains conditioned upon the applicant obtaining written consent from the property and business owners of Potbelly (Lot 2) regarding the proposed drive-through lane and necessary access easement modifications.

⚠️ Hydrologic Outlook issued June 8 at 12:44PM CDT by NWS Chicago IL
Today Jun 7
Showers And Thunderstorms Likely
81° 70°

Showers And Thunderstorms Likely

💨 15 mph 💧 72%

Leave a Comment





Latest News Stories

Frankfort-Village-Board-Meeting-Graphic

Frankfort Board Approves New Wendy’s on Route 30 With Numerous Modifications

A new Wendy's restaurant is set to be built at the northwest corner of U.S. Route 30 and Frankfort Square Road after the Frankfort Village Board unanimously approved the project...
frankfort village hall graphic logo.1

Historic Downtown Frankfort Property Granted Deck and Patio Variances

The owners of a historic mixed-use building in downtown Frankfort have received approval for six zoning variances to construct a new paver patio and a second-floor rear deck. The Frankfort...
frankfort village hall graphic logo.8

Frankfort Approves $1.3 Million in Bills, Including Annual Insurance Payment

The Frankfort Village Board authorized over $1.3 million in payments at its meeting Monday, with nearly half of the total amount covering the village's annual insurance premiums. Trustees unanimously approved...
Meeting-Briefs

Meeting Briefs: Frankfort Village Board for June 2, 2025

Wendy's Project Approved with Multiple Variances: The Village Board gave final approval for a new Wendy's restaurant at U.S. Route 30 and Frankfort Square Road. The project required a major change...
frankfort-park-district.1

Frankfort Park Board Holds Closed-Door Talks on Five Oaks HOA Dispute

The Frankfort Park District Board of Commissioners entered into a closed executive session on Tuesday, May 27, to discuss pending litigation concerning the Five Oaks Park parcel, signaling a deepening...
frankfort illinois library logo graphic.5

Frankfort Library Board Reorganizes with New Officers, Seeks to Fill Vacancy

The Frankfort Public Library District Board of Trustees underwent a significant transformation Thursday night, swearing in five new members, electing a new slate of officers, and announcing an immediate search...
frankfort illinois library logo graphic.1

Frankfort Library HVAC Project Nears Completion, Cost Estimated Up to $260,000

The Frankfort Public Library’s major HVAC replacement project is nearly complete, with the new system officially turned on this week, according to an update provided at the Library Board of...
Meeting-Briefs

Meeting Summary: Frankfort Public Library District for May 22, 2025

The Frankfort Public Library District Board of Trustees held its reorganization meeting on Thursday, welcoming five new members and electing new officers. The board also received an update on the...
Frankfort-Township-Logo-Graphic

Frankfort Township Approves Employee Raises, Details Major Infrastructure and Service Projects

Frankfort Township employees will receive a 2.5% cost-of-living pay increase after the Board of Trustees unanimously approved the adjustment at its Monday, May 19 meeting. The move came as Supervisor...
Frankfort-Township-Logo-Graphic

New High-End Bar ‘Ace & Vine’ Gets Green Light from Township Board

A new bar focused on high-end liquor and an extensive wine collection is one step closer to opening in Frankfort Township after the Board of Trustees voted to recommend a...
Frankfort-Township-Logo-Graphic

Golf Carts Not Permitted on Township Roads, Supervisor Clarifies

Residents hoping to drive golf carts on roads in unincorporated Frankfort Township are out of luck, as the practice is illegal under state law, Supervisor Nick George clarified at the...
Frankfort-Township-Logo-Graphic

Meeting Briefs: Frankfort Township Board for May 19, 2025

The Frankfort Township Board approved a 2.5% cost-of-living raise for its employees and discussed several major projects at its meeting on Monday, May 19. Supervisor Nick George announced that the...
Screenshot-2025-06-16-at-3.26.08-PM

Will County Board Rejects Two Solar Farm Projects After Heated Public Opposition

New Lenox area residents cite safety concerns, property values in opposing commercial solar facilities The Will County Board voted decisively against two proposed commercial solar energy facilities during its May...
will-county-board.3

County Approves $15 Million Water System Takeover for Southeast Joliet Area

700 homes to receive upgraded service as Joliet takes control of failing sanitary district The Will County Board voted 20-1 to support dissolving the Southeast Joliet Sanitary District and transferring...
will-county-board

Board Postpones County Purchasing Code Overhaul Amid Union Contractor Debate

Members seek clarification on requirements that could favor unionized businesses The Will County Board postponed action on proposed changes to county purchasing ordinances after members raised concerns about language that...