—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

⚠️ Hydrologic Outlook issued June 15 at 3:11PM CDT by NWS Chicago IL
⚠️ Hydrologic Outlook issued June 15 at 3:10PM CDT by NWS Chicago IL
Mon Jun 15
Showers And Thunderstorms Likely
74° 53°

Showers And Thunderstorms Likely

💨 10 to 20 mph 💧 56%

Leave a Comment





Latest News Stories

Joliet-Junior-college.-Graphic-Logo.3

JJC Board Approves Student Trustee Quorum Policy Amid Heated Debate

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College Board of Trustees passed a controversial policy change allowing the student trustee to be counted...
Meeting Briefs

Meeting Summary and Briefs: Summit Hill School District 161 for August 13, 2025

The Summit Hill District 161 Board of Education on Wednesday, August 13, 2025, approved a major technology contract and navigated a rare split vote on a new teacher hire. The...
Joliet-Junior-college.-Graphic-Logo.2

Joliet Junior College, City of Joliet to Explore Joint Public Safety Institute

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved an intergovernmental agreement with the City of Joliet to begin...
frankfort-school-district-161.2-e1754272831494

Summit Hill 161 Accepts a Dozen Resignations, Approves New Hires

Article Summary: The Summit Hill School District 161 Board of Education processed a significant number of staff changes, accepting twelve resignations and approving a slate of new hires for the 2025-2026...
summit-hill-junior-high-school-frankfort-161

Summit Hill 161 Approves $48K Tech Upgrade, Board Divided on New Teacher Hire

Article Summary: The Summit Hill District 161 Board of Education approved a five-year, $48,305 agreement for a virtual server upgrade and separately hired a new junior high teacher in a contentious...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Village Board for September 8, 2025

The Frankfort Village Board's meeting on Monday, September 8, 2025, was highlighted by a resident's pointed questions regarding the village's process for exploring a potential switch to Lake Michigan water....
Frankfort Village Board Meeting Graphic

Frankfort Resident Questions Village’s Lake Michigan Water Survey Process

Article Summary: A Frankfort resident publicly questioned the village's handling of a recent water source survey during the village board meeting, arguing it was released with limited research and a...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Public Library District for July 24, 2025

The Frankfort Public Library District board on Thursday, July 24, 2025, addressed a major loan payment error by its bank, paused a planned reading room project due to high costs,...
Joliet-Junior-college.-Graphic-Logo.3

JJC Moves Forward with Major Technology Overhaul to Modernize College Operations

Article Summary: The Joliet Junior College Board of Trustees received a detailed update on a sweeping Enterprise Resource Planning (ERP) project, a major initiative designed to modernize the college's core...
Joliet-Junior-college.-Graphic-Logo.2

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for August 20, 2025

The Joliet Junior College Board of Trustees focused on a major technological overhaul, celebrated milestones in student support, and addressed internal governance issues at its regular meeting on August 20,...
Joliet-Junior-college.-Graphic-Logo.4

Tensions Flare as JJC Chairman Rebukes “Entitlement” After Trustee Lists Demands

Article Summary: Apparent tensions on the Joliet Junior College Board of Trustees surfaced during its meeting on Wednesday, August 20, 2025, when one trustee requested to be returned to "good...
frankfort illinois library logo graphic.5

Library to Host Naloxone Distribution Box to Combat Opioid Overdoses

Article Summary: The Frankfort Public Library will become a host site for a naloxone distribution box in partnership with the Will County Health Department, making the life-saving opioid overdose reversal...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District for July 15, 2025

The Frankfort Fire Protection District Board of Trustees on Tuesday, July 15, 2025, considered several significant financial and equipment matters. The board was scheduled to approve a $91,955 purchase of...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Park District Board of Commissioners for July 8, 2025

The Frankfort Park District Board of Commissioners on Tuesday, July 8, 2025, approved a major planning expenditure, authorizing $131,500 for agreements with Design Perspectives. The funds will be used for...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District Board of Trustees for July 15, 2025

The Frankfort Fire Protection District Board of Trustees took major steps toward addressing long-term financial and operational needs at its meeting on July 15, 2025. The board directed its interim...