will county board meeting.6

Will County Partners with LNS Development for Laraway Road Drainage Improvements in New Lenox

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county approved a cost-sharing agreement with a private developer to build shared stormwater management facilities that will serve both a new residential subdivision and the upcoming Laraway Road widening project.

Laraway Road / LNS Development Key Points:

  • Will County and LNS Development Group, LLC will co-fund shared stormwater infrastructure.

  • The county will pay an estimated $332,209.92 for its share of the detention facility and storm sewer upgrades.

  • The county is also paying LNS Development $19,862.03 to acquire 0.43 acres of right-of-way required for the Laraway Road widening project.

  • The Laraway Road project will widen the highway to four lanes between Cedar Road and Spencer Road.

Will County is leveraging private development to streamline its own infrastructure costs, approving an agreement with LNS Development Group, LLC on Tuesday, April 7, 2026, to construct shared stormwater facilities along Laraway Road in New Lenox.

The agreement centers on a parcel of land (PIN 15-08-35-100-011) where LNS Development is planning a new residential subdivision. Concurrently, Will County is engineering a major capacity project to widen Laraway Road (County Highway 74) from a two-lane road to a four-lane highway with a center barrier median from Cedar Road to Spencer Road.

Because both the county’s highway expansion and the private residential development require significant stormwater management, the two entities agreed to co-locate and share the costs of a detention facility and upgraded storm sewers on the developer’s parcel.

According to the engineer’s estimates provided in the agenda packet, Will County’s financial obligation for the construction of the shared improvements is capped at an estimated $332,209.92. This breaks down to $179,218.92 (21% of the total cost) for the detention basin, and $152,991.00 (100% of the required upgrades) to properly size the storm sewers to accommodate WCDOT drainage. LNS Development will cover the remaining construction costs.

Furthermore, the agreement secures the land Will County needs to physically widen the road. LNS Development will convey 0.43668 acres of right-of-way to the county in exchange for $19,862.03. In return, the county guarantees the developer’s vested rights to specific access points and drainage capacity along the newly widened highway.

The measure was passed unanimously and advances to the full County Board.

⚠️ Severe Thunderstorm Watch issued July 3 at 3:23PM CDT until July 3 at 7:00PM CDT by NWS Chicago IL
Today Jul 2
Slight Chance Showers And Thunderstorms
89° 73°

Slight Chance Showers And Thunderstorms

💨 10 mph 💧 20%

Leave a Comment





Latest News Stories

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

By Jim Talamonti | The Center SquareThe Center Square Cook County, Chicago declare flood disaster Chicago Mayor Brandon Johnson and Cook County Board President Toni Preckwinkle have issued respective disaster...
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – While Gov. J.B. Pritzker jokes on national TV that Illinois’ congressional maps were drawn by kindergartners, a...
Frankfort Meeting 8.4.25

Frankfort to Implement 1% Grocery Tax, Replacing State Levy to Preserve Revenue

FRANKFORT – Frankfort residents will see no change at the grocery checkout line, but the village will preserve a key revenue stream after the Village Board approved an ordinance Monday...
frankfort village hall graphic logo.1

Frankfort to Sell Vacant Downtown Property Valued at $325,000 for Commercial Redevelopment

FRANKFORT – The Village of Frankfort is officially putting a prime piece of vacant, village-owned land in its historic downtown up for sale, aiming to spur immediate commercial redevelopment. The...
frankfort village hall graphic logo.8

New Sushi Restaurant ‘The Orange Hat’ Approved for Frankfort

FRANKFORT – A new full-service sushi restaurant, The Orange Hat, is set to open in the Hickory Creek Market Place after the Village Board approved a special use permit for...
frankfort village hall graphic logo.7

Village Board Approves Zoning Variances for New Custom Home on Bowen Street

FRANKFORT – The Frankfort Village Board on Monday approved two zoning variances for a new custom home at 50 E. Bowen Street, allowing the builder to use non-masonry siding and...
Meeting-Briefs

Meeting Summary: Frankfort Village Board for August 4, 2025

The Frankfort Village Board met on Monday, August 4, 2025, to address several key ordinances and conduct village business. The board approved a measure to replace the state's expiring 1%...
Fire-Ambulance-Rescue-Logo

Indiana Woman Identified as Victim in Fatal Wilmington-Peotone Road Crash

The Will County Coroner’s Office has officially identified the woman killed in Tuesday’s fatal crash on Wilmington-Peotone Road as 70-year-old Judith L. Stirm of Delphi, Indiana. In a statement, Coroner...
Frankfort-Police-Rescue

Multiple Agencies Rescue Person in Mental Health Crisis from Frankfort Pond

A person experiencing a mental health crisis was safely rescued from a pond near 80th Avenue in Lakeview Estates on Wednesday after a coordinated response by multiple emergency agencies. Frankfort...
Green-Garden-Logo.WP

Green Garden Township Forges Ahead with New Town Hall Plan, Faces Budget and Neighbor Concerns

The Green Garden Township Board is advancing an ambitious plan to build a new, larger town hall and community center on a six-acre parcel south of its current location, a...
Meeting-7.28.25

IT Consultant Urges Green Garden Township to Adopt Modern Cybersecurity Measures

Green Garden Township’s digital infrastructure is vulnerable to cybercrime and requires an immediate overhaul, including adopting a modern, secure email system and multifactor authentication, an IT consultant told the board...
Meeting-Briefs

Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025

The Frankfort Township Board on Monday, June 9, 2025, approved its primary financial documents for the upcoming fiscal year, passing separate and balanced budget appropriation ordinances for the township and...
Sanchez

Sanchez Family Unveils Major Redevelopment Plan for Monee Industrial Property

Article Summary: Developer Luis Sanchez, a key figure in Monee's commercial growth for two decades, presented a plan to revitalize an industrial property on Industrial Drive. The project, which includes...
Screenshot-2025-08-13-at-2.15.28-PM

Monee Approves Over $566,000 Payment for New Public Works Facility Nearing Completion

Article Summary: The Monee Village Board approved a payment of $566,134.16 for the ongoing construction of its new Public Works building. Officials reported the project is on track for a...
Screenshot-2025-08-13-at-2.11.44-PM

Sheepdog Firearms Gets Green Light for Special Use Permit in Monee

Article Summary: Sheepdog Firearms received final approval from the Monee Village Board for a special use permit to operate a retail and firearms range facility at 25812 S. Sunset Drive....