Lincoln-Way 210 Advances Summer Site Improvements and Asbestos Abatement Projects
Lincoln-Way Community High School District 210 Meeting | March 19, 2026
Article Summary: The Board of Education approved an asbestos abatement contract and initial site improvement bids to prepare for a massive $30 million HVAC overhaul and complete scheduled campus upgrades.
Site Improvements Key Points:
-
NES, Inc. was awarded a $38,000 contract for asbestos abatement at Lincoln-Way Central.
-
Henry Brothers was approved for the base bid and alternates 1-5 for summer site improvements.
-
Turf selection for an auxiliary field was postponed until April to utilize purchasing cooperatives.
Preparing for a massive $30 million HVAC overhaul and various summer maintenance projects, the Lincoln-Way Community High School District 210 Board of Education on Thursday, March 19, 2026, approved an asbestos abatement contract and initial site improvement bids.
The district will complete approximately $30,000,000 in HVAC improvements at the Lincoln-Way Central and East campuses during the summers of 2026 and 2027. To prepare for this work, the district must ensure that any ceiling tiles or materials disturbed by the HVAC updates are clear of asbestos. According to a memo from Director of Buildings & Grounds Chuck Welke and Assistant Superintendent Michael J. Duback, a small section of abatement work is needed at Lincoln-Way Central.
The Board awarded the asbestos abatement contract to the lowest responsive bidder, NES, Inc., for a total cost of $38,000. The cost will be covered by life safety contingencies and the operating budget. The abatement work is scheduled to take place over spring break when students are out of the building, allowing HVAC contractors to begin their preparatory work in April and May.
In a separate vote, the Board advanced its annual summer site improvements, which typically encompass $4 million to $6 million worth of non-HVAC work. The Board approved the base bid and alternates one through five from Henry Brothers. The approved work includes tennis courts at Lincoln-Way West, concrete and paving work at the transportation center, field events behind the stadium at Lincoln-Way East, and parking expansions.
However, the Board held off on approving alternates six, seven, and eight, which related to different turf options for an auxiliary field. Duback explained that pricing clarifications with manufacturers prompted the district to pause on the turf selection. The district plans to explore purchasing the turf material directly through a cooperative to increase efficiency and will bring a product recommendation back to the Board in April.
Both the asbestos abatement contract and the site improvement bids passed in 5-0 split votes, with Board Secretary Deadra W. Stokes abstaining from both items.
Latest News Stories
District 210 Awards $24.4 Million Contract for Major HVAC Upgrades
The Lakota Group Tapped for Historic Downtown Frankfort Design Study
Mental Health Board Updates Committee on 2026 Grant Cycle and Funding Priorities
Clean Audit Reveals $8.5 Million Increase in District 161 Net Position
PZC Approves Homer Township Landscape Business Despite Neighbor Concerns; Adds Berm Condition
JJC Foundation Executive Director Retires Following $2.3 Million Estate Gift
Lincoln-Way Board Approves $92.5 Million Tax Levy for 2025
Summit Hill District 161 Board Approves $44.8 Million Tax Levy with Slight Overall Decrease
Frankfort Board Approves 2025 Tax Levy with Projected Rate Decrease
Interim Chief Interviews for Permanent Job as Frankfort Fire Board Meets in Closed Session
Liquor License Amendments Approved for Frankfort, Joliet, and Lockport Businesses
Frankfort Fire Trustees Hire Illinois Fire Chiefs Association to Assist in Chief Search; One Trustee Dissents
Meeting Summary and Briefs: Will County Planning and Zoning Commission for December 16, 2025