frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

⚠️ Hydrologic Outlook issued June 16 at 2:44AM CDT by NWS Chicago IL
Today Jun 15
Showers And Thunderstorms Likely then Chance Showers And Thunderstorms
72° 55°

Showers And Thunderstorms Likely then Chance Showers And Thunderstorms

💨 10 to 20 mph 💧 71%

Leave a Comment





Latest News Stories

Committee-Executive.Graphic

Meeting Summary and Briefs: Will County Executive Committee for February 11, 2026

Will County Executive Committee Meeting | February 11, 2026 Meeting SummaryThe Will County Board Executive Committee met on Wednesday, February 11, 2026, tackling a heavy agenda focused on economic development...
Screenshot 2026-02-22 at 4.29.56 PM

Advisory Committee Debates Rigor of Online Summer School Options

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The District 210 Advisory Committee reported on discussions regarding the potential expansion of online summer school offerings,...
Election Vote Graphic

Group Presents Allegations of 2024 Voter Roll Errors to County Board

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a resolution calling for the review of election systems and integrity, following public comments alleging inaccuracies...
Will County Board Graphic.04

Will County Board Advised on Strict “Judicial” Role Ahead of Landfill Expansion Application

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: During a detailed legal briefing on Tuesday, the Will County Landfill Committee received strict instructions regarding their conduct during...
Committee-Ad-Hoc.Graphic

Ad-Hoc Committee: Bath House Regulations Updated; Removes 60-Day Licensing Window

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Article Summary: The Will County Board Ad-Hoc Ordinance Review Committee approved updates to the regulations governing bath houses and...
Committee-Land Use.Graphic

Land Use Committee Rejects Shorewood Solar Farm Despite 25-Year Lease Offer

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: The Will County Land Use and Development Committee voted against recommending a controversial solar farm proposal...
Screenshot 2026-02-22 at 5.06.42 PM

Trustees Renew Federal Lobbyist Contract Following $800,000 Funding Win

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Article Summary: The JJC Board voted to renew its contract for federal lobbyist services on Wednesday. Administration and supporting...
Committee-Executive.Graphic

Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road

Will County Executive Committee Meeting | February 11, 2026 Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in...
Committee-Land Use.Graphic

Land Use Committee: ‘Clean Fill’ Proposal Stalls After Unauthorized Tree Removal Sparks Environmental Concerns

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: A request to rezone land for a "clean fill" operation in Joliet Township stalled in committee...
Screenshot 2026-02-22 at 4.29.56 PM

Contracts Approved for New West Principal and District Technology Director

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The Board appointed Dr. Jennifer Killeen as the new Principal of Lincoln-Way West High School and Kyle...
ALEC urges states to adopt 'light-touch' AI regulation

ALEC urges states to adopt ‘light-touch’ AI regulation

By Andrew RiceThe Center Square The American Legislative Exchange Council called on state legislatures to embrace limited tax regulation and greater investment in artificial intelligence to facilitate effective government processes....
Los Angeles school district puts superintendent on paid leave

Los Angeles school district puts superintendent on paid leave

By Dave MasonThe Center Square Alberto Carvalho, the Los Angeles Unified School District superintendent, was placed on paid administrative leave by the Board of Education late Friday afternoon pending an...
Physicians assistants leave for Iowa due to licensing wait times in Illinois

Physicians assistants leave for Iowa due to licensing wait times in Illinois

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – State lawmakers say physician assistants are leaving for Iowa because it takes so long to get licensed...
Illinois quick hits: Chicago debt deal pushes payments down road

Illinois quick hits: Chicago debt deal pushes payments down road

By Jim Talamonti | The Center SquareThe Center Square Chicago debt deal pushes payments down road Chicago Mayor Brandon Johnson is reportedly structuring the city’s debt with a deal that...
Texas oil & gas leaders welcome Trump reversal of Biden policies

Texas oil & gas leaders welcome Trump reversal of Biden policies

By Bethany BlankleyThe Center Square The leaders of the Texas oil and natural gas industry are expressing optimism about President Donald Trump’s visit to Texas. Trump is expected to tout...