frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

⚠️ Heat Advisory issued July 27 at 8:03AM CDT until July 27 at 9:00PM CDT by NWS Chicago IL
Today Jul 26
Patchy Fog then Slight Chance Showers And Thunderstorms
90° 70°

Patchy Fog then Slight Chance Showers And Thunderstorms

💨 10 to 15 mph 💧 22%

Leave a Comment





Latest News Stories

WATCH: Illinois In Focus Daily | Wednesday Aug. 13th, 2025

WATCH: Illinois In Focus Daily | Wednesday Aug. 13th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares comments from...
Illinois law empowers officials to crack down on predatory towing

Illinois law empowers officials to crack down on predatory towing

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Beginning Jan. 1, a new Illinois law cracks down on predatory towing by letting the Illinois...
Illinois quick hits: Former Chicago schools dean sentenced for sexual assault

Illinois quick hits: Former Chicago schools dean sentenced for sexual assault

By Jim Talamonti | The Center SquareThe Center Square Former Chicago schools dean sentenced for sexual assault A former Chicago public school dean has been sentenced to 22 years in...
WCO-Landfill-8.5.25.1

Will County Receives Detailed Update on Landfill Expansion Investigation

Article Summary: The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on...
Meeting-Briefs

Meeting Summary and Briefs: Will County Landfill Committee for August 7, 2025

The Will County Landfill Committee on Thursday heard a detailed technical update on the ongoing investigation for the county landfill expansion, confirming that the complex project remains on schedule. Consultants...
Green-Garden-Logo.WP

Green Garden Township Moves Forward with New Town Hall Plans, Awaits Grant Approval

ARTICLE SUMMARY: Green Garden Township is advancing with preliminary work for a new town hall, having met with architects and a civil engineer, while awaiting Will County's final approval to...
Green-Garden-Township-Graphic.1

Township Board Approves Budget Transfers to Fund Assessor’s Staff and Correct Rent Payment

ARTICLE SUMMARY: The Green Garden Township Board approved Resolution 2025-005, which reallocates a total of $25,200 within the town fund to provide necessary staffing funds for the assessor's office and to...
solar panels photovoltaics in solar farm

County Rep Cites Solar Lawsuits, Grant Shortfalls as Key Issues Facing Will County

ARTICLE SUMMARY: Will County Board member Sherry Newquist reported that the county is navigating lawsuits related to solar farm approvals and anticipating budget challenges from the loss of federal grant money....
Assessor

Assessor’s Office Hires Staff to Handle Workload After 6% Multiplier Hits Property Owners

ARTICLE SUMMARY: Following the application of a 6% property assessment multiplier across Green Garden Township, the assessor's office has hired a new staff member to help manage the increased workload and...
SSUCv3H4sIAAAAAAAACnSRz07DMAzG70i8Q5XzKpY10I0jB248wcTBdcwaLUum/AGhae9O0rQjB7jFP9uf/cWX+7umYQN4hey5ueQoxUrr6IODoKxJeL2auSMjydWEpArWKdA1HCDgaOBECZqodcbXKcl8gBA9+TxsRgiBDkmjwJtE2Whf4mZJTMnUkVKMrSrm4zCxBRXxfzpfoleGvH94VQYM0l9Kb8ojaQ2GbPS/suXxvliFAxn8ntxULh1pguJyX0rZ8SuQO9W+IUplK8ufFkHngq5SOjuFyhyqNhvG6QRLG9pogssr3D6EaWvPMOj8/x9JkxY+gvepXC68GoTp4PZUzTE2TAZmVSbTmXLIu023E6Lre7HlohNPYi4opx1V0pnWWYRSjEcla+sqb8AIibbYb1qOXLZih7wdeNe3m+6Ry4H3fECRPv76AwAA//8DAJrJGBCkAgAA

Township Appoints Temporary FOIA Officer During Trustee’s Leave of Absence

ARTICLE SUMMARY: The Green Garden Township Board appointed resident Belinda Olszewski as a temporary, non-paid Administrative Assistant and FOIA Officer to fill the roles while Trustee Sarah Boxer is on a...
Meeting-Briefs

Meeting Summary and Briefs: Green Garden Township Board for August 11, 2025

The Green Garden Township Board pushed forward with plans for a new town hall and approved key budget transfers to support the assessor's office during its August 11th meeting. Supervisor...
Illinois quick hits: Fatal crash involved Guatemalan national; tentative Chicago firefighters contract

Illinois quick hits: Fatal crash involved Guatemalan national; tentative Chicago firefighters contract

By Jim Talamonti | The Center SquareThe Center Square Fatal crash involved Guatemalan national The Stephenson County Sheriff’s Department says toxicology testing will be conducted to determine if alcohol was...
WATCH: Sonya Massey bill requiring full employment history for police candidates now law

WATCH: Sonya Massey bill requiring full employment history for police candidates now law

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – A measure requiring police agencies across the state of Illinois to get full employment history for prospective...
Chicago group says Illinois officials break laws as they blast Trump

Chicago group says Illinois officials break laws as they blast Trump

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Mayor Brandon Johnson says he and Gov. J.B. Pritzker are on the same page about President...
Pritzker continues fielding presidential question ahead of State Fair rally

Pritzker continues fielding presidential question ahead of State Fair rally

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Illinois Democrats rally at the Illinois State Fair in Springfield Wednesday for Governor’s Day, but whether Gov....