frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

Today Jun 9
Showers And Thunderstorms Likely
91° 72°

Showers And Thunderstorms Likely

💨 5 to 20 mph 💧 65%

Leave a Comment





Latest News Stories

Wintrust-Crossroads-Sports-Complex

New Lenox Prepares for Grand Opening of Wintrust Crossroads Sports Complex

NEW LENOX – After months of anticipation and intensive work, the New Lenox Community Park District is making final preparations for the grand opening of its flagship Wintrust Crossroads Sports...
New-Lenox-School-122.2

New Lenox D122 Board Approves Tentative Budget, Sets September Public Hearing

The New Lenox School District 122 Board of Education has approved a tentative budget for the 2025-2026 fiscal year, maintaining its long-standing practice of balanced budgets funded by existing cash...
New-Lenox-Township-Food-Pantry

New Lenox Township Food Pantry Reports Record Demand in May

NEW LENOX – The New Lenox Township Food Pantry experienced a record level of need in May, serving 431 families and 1,107 individuals, according to a report at the June...
NL-VB-July-28

New Lenox to Dedicate Street Honoring Pope Leo XIV, Citing Deep Local Ties

NEW LENOX – The Village of New Lenox is celebrating its unique connection to the newly elected Pope Leo XIV, the first American to lead the Roman Catholic Church, by...
New-Lenox-School-122.7

D122 Renews Insurance Policies for Nearly $490,000

The New Lenox School District 122 Board of Education has renewed its property/casualty and worker's compensation insurance policies for the 2025-2026 school year, with total costs amounting to nearly $490,000....
new-lenox-township.2

New Lenox Township Addresses Cemetery Needs, Appoints New Liaison

NEW LENOX – New Lenox Township is turning its attention to the care and potential expansion of its cemeteries, an effort that will be spearheaded by a newly elected trustee....
New-Lenox-Village-Board.2

New Lenox Police Chief Louis Alessandrini Retires; Sgt. David Nykiel Promoted in Leadership Transition

NEW LENOX – The New Lenox Police Department is undergoing a significant leadership transition as Police Chief Louis Alessandrini retires after 20 years with the village, celebrated with an emotional...
Screenshot-2025-08-13-at-2.15.28-PM

Monee to Receive $250,000 Donation in Solar Project Agreement

Article Summary: The Village of Monee will receive a $250,000 donation from TPE IL W1202, LLC, after the Village Board authorized a community benefit agreement for a planned 5-megawatt solar...
new-lenox-park-district.6

New Lenox Park District Board Approves 2025-2026 Budget

NEW LENOX – The New Lenox Community Park District Board of Commissioners unanimously approved the budget and appropriation ordinance for the 2025-2026 fiscal year during its regular meeting on June...
frankfort fire district graphic logo.1

Frankfort Fire District to Purchase Two Used Engines to Address Fleet Gap, Budget Constraints

Article Summary: The Frankfort Fire Protection District is moving forward with a plan to purchase two used fire engines for a combined total of $635,000, a strategic move to bolster...
New-Lenox-School-122.6

Staffing Shortage Leads D122 to Renew Contract for School Psychologist

Facing a persistent staffing shortage for a critical role, the New Lenox School District 122 Board of Education has renewed its contract with an outside agency to provide a school...
Meeting-Briefs

Meeting Summary: New Lenox Township for June 12, 2025

At its June 12 meeting, the New Lenox Township Board of Trustees heard reports on rising demand for community services, discussed ongoing maintenance projects, and assigned responsibilities to its newly...
New-Lenox-Village-Board.4

New Lenox Approves Major Residential Subdivision, Paves Way for Route 6 Commercial Growth

NEW LENOX – The Village Board took decisive action on two major developments Monday, giving final approval to a 55-lot residential subdivision for "empty nesters" and clearing a key hurdle...
New-Lenox-Sharons-Bay-Park

Contractor Selected for Sharon’s Bay Park Redevelopment

NEW LENOX – The New Lenox Community Park District is moving forward with plans to redevelop Sharon's Bay Park, having approved a contractor for the project at its Wednesday meeting....
New-Lenox-Sharons-Bay-Park

Contractor Selected for Sharon’s Bay Park Redevelopment

NEW LENOX – The New Lenox Community Park District is moving forward with plans to redevelop Sharon's Bay Park, having approved a contractor for the project at its Wednesday meeting....