frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

Today Jun 12
Mostly Sunny then Slight Chance Showers And Thunderstorms
87° 61°

Mostly Sunny then Slight Chance Showers And Thunderstorms

💨 5 to 15 mph 💧 18%

Leave a Comment





Latest News Stories

Illinois quick hits: State EPA looks to fund EV charging stations; Tax Foundation says mayor's proposal would hinder employment;

Illinois quick hits: State EPA looks to fund EV charging stations; Tax Foundation says mayor’s proposal would hinder employment;

By Jim Talamonti | The Center SquareThe Center Square State EPA looks to fund EV charging stations The Illinois Environmental Protection Agency (EPA) has announced an Electric Vehicle (EV) Charging...
Screenshot 2025-11-06 at 4.17.15 PM

Federal Lobbyists Brief Will County on Government Shutdown, Warn of SNAP and TSA Disruptions

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: Will County’s federal lobbyists reported that the ongoing government shutdown, now the longest in U.S. history, is...
Screenshot 2025-11-05 at 3.38.44 PM

Frankfort Board Approves Final Plats for Crystal Brook and Copper Creek Subdivisions

Frankfort Village Board Meeting | November 3, 2025 Article Summary: The Frankfort Village Board approved final plats for two major residential developments on Monday, November 3, 2025, advancing plans for...
Will County Logo Graphic

Commission Approves Mokena-Area Garage Variance Over Village’s Objection

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a variance for a new garage in unincorporated Frankfort Township...
Screenshot 2025-11-05 at 4.02.49 PM

Will County Committee Advances Gougar Road Bridge Project with Over $540,000 in Agreements

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved two key agreements for the Gougar Road bridge project in New Lenox,...
Joliet-Junior-college.-Graphic-Logo.4

JJC Receives Surprise $1.9 Million from IRS Employee Retention Credit

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College has received an unexpected $1.9 million windfall from the federal Employee Retention Credit (ERC), a...
Joliet-Junior-college.-Graphic-Logo.2

JJC Advances ERP Modernization with New Vendor and Two-Year Budget

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College is entering the next phase of its Enterprise Resource Planning (ERP) system overhaul, with the...
frankfort-square-park-district.1

Park District Reviews Emergency Response After Frankfort Square Shelter-in-Place

Frankfort Square Park District Meeting | September 2025 Article Summary: Following a law enforcement incident that prompted a shelter-in-place order in Frankfort Square, the park district reviewed its emergency protocols...
Screenshot 2025-11-06 at 4.17.02 PM

Will County Committee Shapes 2026 Legislative Agendas on Housing, Energy, and Health

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: The Will County Legislative Committee advanced key priorities for its 2026 state and federal legislative agendas, focusing...
solar panels photovoltaics in solar farm

Frankfort Library Board Moves to Explore Community Solar Power

Frankfort Public Library District Meeting | September 2025 Article Summary: The Frankfort Public Library District is exploring renewable energy options after the Board of Trustees authorized a consultant to seek...
Congressional Perks: Committees, caucuses cost $50 million since 2019

Congressional Perks: Committees, caucuses cost $50 million since 2019

By Arthur KaneThe Center Square Since 2019, partisan and special interest caucuses and coalitions in the U.S. House spent at least $50 million for staff, food, travel and other expenses,...
Joliet-Junior-college.-Graphic-Logo.4

JJC Authorizes Land Buy for Grundy County Expansion, Secures Site in Morris

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees has authorized negotiations for a land acquisition to build a...
FAA funding problems hit airports in California, elsewhere

FAA funding problems hit airports in California, elsewhere

By Madeline ShannonThe Center Square As Christine Finch helped her father, Graham Finch, gather his luggage at the San Francisco International Airport, she was worried about how flight delays caused...
Judge bars ICE from acting against ‘protestors,’ ‘rapid response’ activists

Judge bars ICE from acting against ‘protestors,’ ‘rapid response’ activists

By Jonathan Bilyk | Legal NewslineThe Center Square A Chicago federal judge has barred federal agents from U.S. Border Patrol and ICE from conducting crowd control actions anywhere in northern...
Report: IL public schools show low academic proficiency, higher taxpayer funding

Report: IL public schools show low academic proficiency, higher taxpayer funding

By Jim Talamonti | The Center SquareThe Center Square (The CEnter Square) – The latest education statistics indicate stagnant proficiency for public school students in Illinois, despite dramatic increases in...