frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

⚠️ Hydrologic Outlook issued June 15 at 3:11PM CDT by NWS Chicago IL
⚠️ Hydrologic Outlook issued June 15 at 3:10PM CDT by NWS Chicago IL
Mon Jun 15
Showers And Thunderstorms Likely
74° 53°

Showers And Thunderstorms Likely

💨 10 to 20 mph 💧 56%

Leave a Comment





Latest News Stories

Americans prepare to spend $1 trillion this holiday shopping season

Americans prepare to spend $1 trillion this holiday shopping season

By Brett RowlandThe Center Square More than half of all Americans plan to buy things over the five-day holiday weekend, the beginning of a retail shopping season with consumers projected...
Gas prices ahead of Thanksgiving holding steady

Gas prices ahead of Thanksgiving holding steady

By Morgan SweeneyThe Center Square The average price of gas has fallen in 2025, and it appears to be mostly holding steady around $3 heading into the Thanksgiving holiday –...
Illinois quick hits: Migrant youth allegedly murdered homeless Chicago man

Illinois quick hits: Migrant youth allegedly murdered homeless Chicago man

By Jim Talamonti | The Center SquareThe Center Square Migrant youth allegedly murdered homeless Chicago man Three juvenile Venezuelan migrants are part of a group that allegedly attacked, murdered, and...

WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump has revived his criticism of Illinois Gov. J.B. Pritzker over crime, and Pritzker has...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Meeting Briefs

Meeting Summary and Briefs: Village of Frankfort for November 17, 2025

Village of Frankfort Meeting | November 17, 2025 The Frankfort Village Board on Monday, November 17, 2025, approved a series of measures focused on new business development, public safety upgrades,...
Screenshot 2025-11-21 at 10.19.55 AM

Lincoln-Way 210 Receives Clean Audit, Financial Profile Score Downgraded to ‘Review’

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: Lincoln-Way District 210 received a clean, unmodified opinion for its Fiscal Year 2025 audit, the highest rating possible....
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Frankfort School District 157-C.2

Frankfort 157-C Implements New Plan to Combat Chronic Student Absenteeism

Frankfort School District 157-C Meeting | October 2025 Article Summary: Frankfort School District 157-C is rolling out a new, detailed attendance support plan aimed at reducing chronic absenteeism, an issue...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....
Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...