frankfort village hall graphic logo.1

Frankfort Board Awards $551,755 in Engineering Contracts for Aberdeen Bridge Replacement

Spread the love

Frankfort Village Board Meeting | March 16, 2026

Article Summary: Following emergency shoring improvements, the Village Board approved structural and design engineering contracts to fully replace the Aberdeen Bridge over Hickory Creek in the Prestwick Subdivision.

Aberdeen Bridge Replacement Key Points:

  • HW Lochner, Inc. was awarded a $400,755.00 contract for structural engineering services.

  • Robinson Engineering, Ltd. was awarded a $151,000.00 contract for design and coordination services.

  • The bridge recently required temporary emergency shoring and needs full replacement in the next two to three years.

The Frankfort Village Board on Monday, March 16, 2026, approved two professional engineering services agreements totaling $551,755.00 to guide the upcoming replacement of the Aberdeen Bridge over Hickory Creek.

The bridge, located within the Prestwick Subdivision, recently underwent temporary emergency shoring to keep it open to traffic. However, the temporary nature of those repairs means the entire structure must be replaced in the next two to three years.

To expedite the project, the Village split the engineering duties into two components. HW Lochner, Inc. was awarded a $400,755.00 contract to handle the structural engineering of the replacement bridge itself. Their scope includes preparing an Abbreviated Bridge Condition Report (ABCR) and delivering full Plans, Specifications, and Estimates (PS&E) for the Illinois Department of Transportation (IDOT).

Robinson Engineering, Ltd. was awarded a $151,000.00 contract to oversee the civil and design engineering. Robinson’s scope includes hydraulic modeling to ensure the new bridge meets floodway construction standards, roadway approach design, maintenance of traffic plans, and coordination with subconsultants for required wetland and geotechnical services.

According to a village memo, design engineering work is anticipated to begin immediately, with bidding targeted for late 2026 or early 2027. Construction is expected to commence in 2027. The Village plans to utilize Motor Fuel Tax (MFT) funds to support the project, with the total estimated bridge cost reaching approximately $3.5 million.

The contracts were approved unanimously as part of the Village Board’s consent agenda.

Today Jun 8
Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms
85° 72°

Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms

💨 5 to 10 mph 💧 20%

Leave a Comment





Latest News Stories

Bondi defends Epstein files release, denies Trump involvement

Bondi defends Epstein files release, denies Trump involvement

By Andrew RiceThe Center Square Former Attorney General Pam Bondi defended the U.S. Department of Justice’s release of files associated with convicted sex offender Jeffrey Epstein and did not answer...
Federal jury convicts Spokane ICE protesters as questions remain about local charges

Federal jury convicts Spokane ICE protesters as questions remain about local charges

By Tim ClouserThe Center Square The federal verdict is in, but the local fallout from Spokane’s June 2025 protests against Immigration and Customs Enforcement is still playing out, with another...
Cost uncertainty follows prescription price cap bill in Senate

Cost uncertainty follows prescription price cap bill in Senate

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Several Illinois Democrats have made a late-session push to create a state board that would impose price...
Trump making final determination on Iranian ceasefire deal

Trump making final determination on Iranian ceasefire deal

By Sarah Roderick-FitchThe Center Square A final determination is being made on whether the U.S. and Iran will agree to a memorandum of understanding that would extend the ceasefire for...
Nevada candidates call for fraud enforcement, healthcare aid

Nevada candidates call for fraud enforcement, healthcare aid

By Andrew RiceThe Center Square Editor's note: This is part of a series previewing the congressional and statewide races in the Nevada primary election, set for June 9. The election...
Sherill calls on ICE to close New Jersey detention center

Sherill calls on ICE to close New Jersey detention center

By Chris WadeThe Center Square New Jersey Gov. Mikie Sherrill is calling on the Trump administration to shut down a Newark ICE detention facility that has been rocked by violent...
Illinois Quick Hits: Chicago mayor, delegation meet pope

Illinois Quick Hits: Chicago mayor, delegation meet pope

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Mayor Brandon Johnson says joining the city’s faith community and Pope Leo XIV for multi-faith prayer...
USDA plan rallies around American cotton farmers

USDA plan rallies around American cotton farmers

By Alan WootenThe Center Square America lost its top rank for cotton production in the middle of the last century, its mark as the top exporter to Brazil three years...
frankfort fire district graphic logo.2

Meeting Summary and Briefs: Frankfort Fire Protection District Board of Trustees for April 21, 2026

Frankfort Fire Protection District Board of Trustees Meeting | April 21, 2026 The Frankfort Fire Protection District Board of Trustees held its regular monthly meeting April 21, 2026, at Fire...
Screenshot 2026-05-21 at 5.01.25 PM

Cybersecurity, Tactical Gear, and Mosquito Management Lead Frankfort’s Latest Bill Approvals

Frankfort Village Board Meeting | May 18, 2026 Article Summary:An analysis of Frankfort's newly approved accounts payable reveals significant municipal investments in digital defense, police weaponry, seasonal pest control, and...
Screenshot 2026-05-21 at 5.01.25 PM

Meeting Summary and Briefs: Frankfort Village Board for May 18, 2026

Frankfort Village Board Meeting | May 18, 2026 The Frankfort Village Board on Monday, May 18, 2026, met in regular session to finalize several high-priority municipal matters. Chief among the...
WATCH: Experts say increased spending doesn't mean better students

WATCH: Experts say increased spending doesn’t mean better students

By Esther WickhamThe Center Square Spending more taxpayer dollars doesn't make kids smarter, according to experts. As K-12 test scores and student proficiency rates continue to decline nationwide, education experts...
‘Taxpayers deserve to know’: Experts applaud Trump’s drug price transparency expansion

‘Taxpayers deserve to know’: Experts applaud Trump’s drug price transparency expansion

By Tate RosentreterThe Center Square Patients' rights groups are praising President Donald Trump’s announcement of drug price transparency expansion as the first step toward price transparency in healthcare, stating that...
Tourism spending, Springfield investment bill considered as budget deadline nears

Tourism spending, Springfield investment bill considered as budget deadline nears

By Sean Reed | The Center SquareThe Center Square (The Center Square) – Multiple proposals that could increase funding targeted at increasing tourism in Illinois are under consideration for the...
DOJ sues four states over denial of undercover license plates to federal agents

DOJ sues four states over denial of undercover license plates to federal agents

By Andrew PaxtonThe Center Square The Department of Justice filed separate federal lawsuits Wednesday against Washington, Oregon, Maine and Massachusetts, escalating a clash between the Trump administration and Democratic-led states...