County Approves $1.9 Million for Wilmington-Peotone Road Engineering
Will County Board Meeting | February 19, 2026
Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements to Wilmington-Peotone Road.
Wilmington-Peotone Road Key Points:
-
Project Limit: Wilmington-Peotone Road (CH 25) from U.S. Route 45/52 to Center Road (CH 19).
-
Cost: $1,989,737.00.
-
Funding Source: County Motor Fuel Tax (MFT) allotment.
-
Contractor: Alfred Benesch and Company (Chicago).
The Will County Board took a significant step toward upgrading a key corridor in District 2 on Thursday, approving a $1.98 million expenditure for design engineering on Wilmington-Peotone Road.
The resolution allocates $1,989,737 in Motor Fuel Tax (MFT) funds to cover Phase I engineering services for the stretch of road between U.S. Route 45/52 and Center Road.
The board awarded the contract for these design services to Alfred Benesch and Company. Phase I engineering typically involves environmental studies, preliminary design, and determining the scope of necessary improvements before construction plans are finalized.
This project is part of the county’s broader Transportation Improvement Program. According to the county’s 2026 Federal Legislative Agenda, which was also discussed during the meeting, the Will County Division of Transportation is performing a Planning and Environmental Linkages (PEL) study on approximately 22 miles of the Wilmington-Peotone corridor to address “new freight clusters” that have appeared in the area.
The expenditure was passed as part of the public works consent agenda.
Latest News Stories
Will County Committee Advances Phased Takeover of Central Will Dial-A-Ride Service
Frankfort Board Denies 24-Hour Drive-Thru Permits for McDonald’s
Frankfort Library Board Approves 2025 Tax Levies
Meeting Summary and Briefs: Frankfort Park District Committee for September 23, 2025
Hunter Prairie Park Redevelopment on Track, Four-Year Journey Detailed
Frankfort 157-C Board Approves $47 Million Budget for 2025-2026 School Year
Park District Gathers Sports Group Input for State-Funded Master Plan
Frankfort Square Park District Issues $136,000 in Bonds, Abates Taxes for Residents
Lawmakers introduce bills to slash their own pay during government shutdowns
94% of sanctioned scholars suffered from free speech attacks
Illinois soybean farmers face uncertainty amid MAHA push against seed oils
Family-based visa quotas cause system backlogs