U.S. to build nuclear reactor on Moon by 2030, cost unknown
The U.S. plans to build a nuclear reactor on the moon by 2030 to prepare for future missions to Mars.
The National Aeronautics and Space Administration and the U.S. Department of Energy will work together to develop a lunar surface reactor. The agreement advances President Donald Trump’s plan for space superiority, NASA Administrator Jared Isaacman said.
“America is committed to returning to the Moon, building the infrastructure to stay, and making the investments required for the next giant leap to Mars and beyond,” he said. “Achieving this future requires harnessing nuclear power.”
U.S. Secretary of Energy Chris Wright said the project “will be one of the greatest technical achievements in the history of nuclear energy and space exploration.”
The goal is to build the reactor and have it operational by 2030.
A cost estimate wasn’t immediately available. A NASA spokesperson said funding for the nuclear project is part of ongoing agency budget work.
NASA and DOE said the fission surface power system would “produce safe, efficient, and plentiful electrical power that will be able to operate for years without the need to refuel.”
“The deployment of a lunar surface reactor will enable future sustained lunar missions by providing continuous and abundant power, regardless of sunlight or temperature,” according to NASA.
Overall, the multi-stage Artemis program could cost more than $100 billion. NASA’s acting inspector general told Congress in 2024 that he expected the agency’s total Artemis campaign costs to reach $93 billion between fiscal years 2012 and 2025.
The inspector general also projected the SLS/Orion system and related ground launch infrastructure will cost at least $4.2 billion per launch for the first four Artemis missions. That does not include $42 billion in formulation and development costs spent over the past 12 years.
Latest News Stories
Swipe fee battle continues after delay, court ruling
Walz appoints members to Operation Metro Surge ‘Truth Council’
$45M included in budget for previously unfunded property tax relief
Over one ton of cocaine seized at U.S.-Mexico tunnel bust
National security group urges Congress to investigate Airwallex ties to CCP
Open primary system debated as Californians go to polls
Illinois Quick Hits: Pritzker signs two bills
Elon Poll says 2 in 3 proud to be American and Signers would be disappointed
U.S. Supreme Court denies Florida request to sue over immigrant CDLs
Meeting Summary and Briefs: Frankfort School District 157-C Board of Education for April 21, 2026
Meeting Summary and Briefs: Lincoln-Way Community High School District 210 for May 21, 2026
Judge says federal rule blocks Illinois from banning ‘swipe fees’