Village Secures $1.6 Million Grant for Laraway and Pfeiffer Road Multi-Use Path
Village of Frankfort Board Meeting | December 1, 2025
Article Summary: Frankfort officials authorized agreements with the Illinois Department of Transportation (IDOT) to utilize over $1.6 million in grant funding for a new multi-use path. The project will close a 1.5-mile gap in the local trail network along Laraway and Pfeiffer Roads.
Multi-Use Path Project Key Points:
-
Grant Amount: $1,632,175 awarded through the Illinois Transportation Enhancement Program (ITEP).
-
Project Scope: A new path along the east side of Pfeiffer Road (Sauk Trail to Laraway Road) and the north side of Laraway Road (Pfeiffer Road to 80th Avenue).
-
Cost Breakdown: The grant covers 80% of engineering costs (
240,420),withtheVillageresponsiblefortheremaining2060,105).
-
Objective: To close a 1.5-mile gap in the existing trail network.
FRANKFORT – The Village of Frankfort is moving forward with a significant infrastructure improvement to its trail system after the Village Board approved funding agreements with the Illinois Department of Transportation (IDOT) on Monday, December 1, 2025.
The Board adopted a resolution authorizing a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement for the Laraway Road/Pfeiffer Road Multi-Use Path project.
“The Village of Frankfort seeks to participate in the construction of a multi-use path… closing a 1.5-mile gap in the existing trail network,” said Trustee Dan Rossi.
The path will be constructed along the east side of Pfeiffer Road from Sauk Trail to Laraway Road, and along the north side of Laraway Road from Pfeiffer Road to 80th Avenue.
Trustee Rossi noted that the Village was awarded a $1,632,175 grant for the project through the Illinois Transportation Enhancement Program (ITEP).
The resolution also authorized an agreement with Robinson Engineering, Ltd. to provide preliminary and design engineering services. The total cost for these services is $300,525. Under the terms of the grant, state funds will cover $240,420 (80%), leaving the Village’s local share at $60,105 (20%).
Trustee Maura Rigoni abstained from the vote on this specific item, noting for the record that she is a part-time employee of Robinson Engineering. The measure passed with the support of the remaining trustees.
Latest News Stories
Illinois Quick Hits: NFIB says biz deduction will bring jobs, benefit to Illinois
Soaring costs and short supply shut millennials out of housing market
Vought testifies before lawmakers on Trump’s $2.1T budget request
SNAP eligibility changes spark debate on gap for impacted recipients
Trump puts spotlight on China, Iran’s top oil consumer
Lawmakers, auditors offer fraud prevention solutions
Illinois unions seek to kill Waymo-friendly bill in Springfield
Will County Animal Protection Services Advises Against Multi-Campus Shelter Model
Executive Committee Advances $15,000 Strategic Plan Initiative
Rich States Poor States: Tax policy largely determines states’ economic competitiveness
P&Z Commission Overrides Staff Denials, Rescuing Special Use Permits for Joliet Wedding Venue and Romeoville Barge Terminal
Will County P&Z Commission Grants Extensions for Joliet Township Solar Farm Ground Cover
P&Z Approves Lockport Bounce House Business Expansion
78 pro-life orgs ask DOJ to stop undermining state laws by favoring aborting drug industry