Screenshot 2025-12-04 at 11.39.37 AM

Village Secures $1.6 Million Grant for Laraway and Pfeiffer Road Multi-Use Path

Spread the love

Village of Frankfort Board Meeting | December 1, 2025

Article Summary: Frankfort officials authorized agreements with the Illinois Department of Transportation (IDOT) to utilize over $1.6 million in grant funding for a new multi-use path. The project will close a 1.5-mile gap in the local trail network along Laraway and Pfeiffer Roads.

Multi-Use Path Project Key Points:

  • Grant Amount: $1,632,175 awarded through the Illinois Transportation Enhancement Program (ITEP).

  • Project Scope: A new path along the east side of Pfeiffer Road (Sauk Trail to Laraway Road) and the north side of Laraway Road (Pfeiffer Road to 80th Avenue).

  • Cost Breakdown: The grant covers 80% of engineering costs (

    240,420),withtheVillageresponsiblefortheremaining20

    60,105).

  • Objective: To close a 1.5-mile gap in the existing trail network.

FRANKFORT – The Village of Frankfort is moving forward with a significant infrastructure improvement to its trail system after the Village Board approved funding agreements with the Illinois Department of Transportation (IDOT) on Monday, December 1, 2025.

The Board adopted a resolution authorizing a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement for the Laraway Road/Pfeiffer Road Multi-Use Path project.

“The Village of Frankfort seeks to participate in the construction of a multi-use path… closing a 1.5-mile gap in the existing trail network,” said Trustee Dan Rossi.

The path will be constructed along the east side of Pfeiffer Road from Sauk Trail to Laraway Road, and along the north side of Laraway Road from Pfeiffer Road to 80th Avenue.

Trustee Rossi noted that the Village was awarded a $1,632,175 grant for the project through the Illinois Transportation Enhancement Program (ITEP).

The resolution also authorized an agreement with Robinson Engineering, Ltd. to provide preliminary and design engineering services. The total cost for these services is $300,525. Under the terms of the grant, state funds will cover $240,420 (80%), leaving the Village’s local share at $60,105 (20%).

Trustee Maura Rigoni abstained from the vote on this specific item, noting for the record that she is a part-time employee of Robinson Engineering. The measure passed with the support of the remaining trustees.


Leave a Comment





Latest News Stories

WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

By Jim Talamonti | The Center SquareThe Center Square Cook County, Chicago declare flood disaster Chicago Mayor Brandon Johnson and Cook County Board President Toni Preckwinkle have issued respective disaster...
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – While Gov. J.B. Pritzker jokes on national TV that Illinois’ congressional maps were drawn by kindergartners, a...
Frankfort Meeting 8.4.25

Frankfort to Implement 1% Grocery Tax, Replacing State Levy to Preserve Revenue

FRANKFORT – Frankfort residents will see no change at the grocery checkout line, but the village will preserve a key revenue stream after the Village Board approved an ordinance Monday...
frankfort village hall graphic logo.1

Frankfort to Sell Vacant Downtown Property Valued at $325,000 for Commercial Redevelopment

FRANKFORT – The Village of Frankfort is officially putting a prime piece of vacant, village-owned land in its historic downtown up for sale, aiming to spur immediate commercial redevelopment. The...
frankfort village hall graphic logo.8

New Sushi Restaurant ‘The Orange Hat’ Approved for Frankfort

FRANKFORT – A new full-service sushi restaurant, The Orange Hat, is set to open in the Hickory Creek Market Place after the Village Board approved a special use permit for...
frankfort village hall graphic logo.7

Village Board Approves Zoning Variances for New Custom Home on Bowen Street

FRANKFORT – The Frankfort Village Board on Monday approved two zoning variances for a new custom home at 50 E. Bowen Street, allowing the builder to use non-masonry siding and...
Meeting-Briefs

Meeting Summary: Frankfort Village Board for August 4, 2025

The Frankfort Village Board met on Monday, August 4, 2025, to address several key ordinances and conduct village business. The board approved a measure to replace the state's expiring 1%...
Fire-Ambulance-Rescue-Logo

Indiana Woman Identified as Victim in Fatal Wilmington-Peotone Road Crash

The Will County Coroner’s Office has officially identified the woman killed in Tuesday’s fatal crash on Wilmington-Peotone Road as 70-year-old Judith L. Stirm of Delphi, Indiana. In a statement, Coroner...
Frankfort-Police-Rescue

Multiple Agencies Rescue Person in Mental Health Crisis from Frankfort Pond

A person experiencing a mental health crisis was safely rescued from a pond near 80th Avenue in Lakeview Estates on Wednesday after a coordinated response by multiple emergency agencies. Frankfort...
Green-Garden-Logo.WP

Green Garden Township Forges Ahead with New Town Hall Plan, Faces Budget and Neighbor Concerns

The Green Garden Township Board is advancing an ambitious plan to build a new, larger town hall and community center on a six-acre parcel south of its current location, a...
Meeting-7.28.25

IT Consultant Urges Green Garden Township to Adopt Modern Cybersecurity Measures

Green Garden Township’s digital infrastructure is vulnerable to cybercrime and requires an immediate overhaul, including adopting a modern, secure email system and multifactor authentication, an IT consultant told the board...
Meeting-Briefs

Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025

The Frankfort Township Board on Monday, June 9, 2025, approved its primary financial documents for the upcoming fiscal year, passing separate and balanced budget appropriation ordinances for the township and...
Sanchez

Sanchez Family Unveils Major Redevelopment Plan for Monee Industrial Property

Article Summary: Developer Luis Sanchez, a key figure in Monee's commercial growth for two decades, presented a plan to revitalize an industrial property on Industrial Drive. The project, which includes...
Screenshot-2025-08-13-at-2.15.28-PM

Monee Approves Over $566,000 Payment for New Public Works Facility Nearing Completion

Article Summary: The Monee Village Board approved a payment of $566,134.16 for the ongoing construction of its new Public Works building. Officials reported the project is on track for a...