Village Secures $1.6 Million Grant for Laraway and Pfeiffer Road Multi-Use Path
Village of Frankfort Board Meeting | December 1, 2025
Article Summary: Frankfort officials authorized agreements with the Illinois Department of Transportation (IDOT) to utilize over $1.6 million in grant funding for a new multi-use path. The project will close a 1.5-mile gap in the local trail network along Laraway and Pfeiffer Roads.
Multi-Use Path Project Key Points:
-
Grant Amount: $1,632,175 awarded through the Illinois Transportation Enhancement Program (ITEP).
-
Project Scope: A new path along the east side of Pfeiffer Road (Sauk Trail to Laraway Road) and the north side of Laraway Road (Pfeiffer Road to 80th Avenue).
-
Cost Breakdown: The grant covers 80% of engineering costs (
240,420),withtheVillageresponsiblefortheremaining2060,105).
-
Objective: To close a 1.5-mile gap in the existing trail network.
FRANKFORT – The Village of Frankfort is moving forward with a significant infrastructure improvement to its trail system after the Village Board approved funding agreements with the Illinois Department of Transportation (IDOT) on Monday, December 1, 2025.
The Board adopted a resolution authorizing a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement for the Laraway Road/Pfeiffer Road Multi-Use Path project.
“The Village of Frankfort seeks to participate in the construction of a multi-use path… closing a 1.5-mile gap in the existing trail network,” said Trustee Dan Rossi.
The path will be constructed along the east side of Pfeiffer Road from Sauk Trail to Laraway Road, and along the north side of Laraway Road from Pfeiffer Road to 80th Avenue.
Trustee Rossi noted that the Village was awarded a $1,632,175 grant for the project through the Illinois Transportation Enhancement Program (ITEP).
The resolution also authorized an agreement with Robinson Engineering, Ltd. to provide preliminary and design engineering services. The total cost for these services is $300,525. Under the terms of the grant, state funds will cover $240,420 (80%), leaving the Village’s local share at $60,105 (20%).
Trustee Maura Rigoni abstained from the vote on this specific item, noting for the record that she is a part-time employee of Robinson Engineering. The measure passed with the support of the remaining trustees.
Latest News Stories
Will County Board Approves Controversial Drug Recovery Retreat in Crete Township
Trump says he won’t back down on Antifa terrorism designation
Exclusive: DOJ ‘weaponization’ victim still in jail, asking for Trump pardon
Champaign stabbing raises concerns over Illinois mental-health law
Frankfort 157-C Approves Tentative Budget, Projects $47.8 Million in Revenue for FY26
Frankfort Police Department Welcomes New Officer Brendan Huffman
Colorado tops nation for millennial migration, report finds
Congress unmoved by imminent government shutdown threat
Illinois quick hits: DHS apprehends ICE protester with firearm; bill allows campaign funds for security
Exclusive: BlackRock pressured ‘woke’ ideology on companies
Trump’s tariffs on imported drugs could raise prices
Lawmaker responds to IL’s push for adult COVID shots against CDC guidance