Village Secures $1.6 Million Grant for Laraway and Pfeiffer Road Multi-Use Path
Village of Frankfort Board Meeting | December 1, 2025
Article Summary: Frankfort officials authorized agreements with the Illinois Department of Transportation (IDOT) to utilize over $1.6 million in grant funding for a new multi-use path. The project will close a 1.5-mile gap in the local trail network along Laraway and Pfeiffer Roads.
Multi-Use Path Project Key Points:
-
Grant Amount: $1,632,175 awarded through the Illinois Transportation Enhancement Program (ITEP).
-
Project Scope: A new path along the east side of Pfeiffer Road (Sauk Trail to Laraway Road) and the north side of Laraway Road (Pfeiffer Road to 80th Avenue).
-
Cost Breakdown: The grant covers 80% of engineering costs (
240,420),withtheVillageresponsiblefortheremaining2060,105).
-
Objective: To close a 1.5-mile gap in the existing trail network.
FRANKFORT – The Village of Frankfort is moving forward with a significant infrastructure improvement to its trail system after the Village Board approved funding agreements with the Illinois Department of Transportation (IDOT) on Monday, December 1, 2025.
The Board adopted a resolution authorizing a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement for the Laraway Road/Pfeiffer Road Multi-Use Path project.
“The Village of Frankfort seeks to participate in the construction of a multi-use path… closing a 1.5-mile gap in the existing trail network,” said Trustee Dan Rossi.
The path will be constructed along the east side of Pfeiffer Road from Sauk Trail to Laraway Road, and along the north side of Laraway Road from Pfeiffer Road to 80th Avenue.
Trustee Rossi noted that the Village was awarded a $1,632,175 grant for the project through the Illinois Transportation Enhancement Program (ITEP).
The resolution also authorized an agreement with Robinson Engineering, Ltd. to provide preliminary and design engineering services. The total cost for these services is $300,525. Under the terms of the grant, state funds will cover $240,420 (80%), leaving the Village’s local share at $60,105 (20%).
Trustee Maura Rigoni abstained from the vote on this specific item, noting for the record that she is a part-time employee of Robinson Engineering. The measure passed with the support of the remaining trustees.
Latest News Stories
State officials urge Trump, Congress to address national debt
Committee Advances Special Use Permit for Used Car Dealership in New Lenox Township
Frankfort Village Board Shifts 2026 Meeting Schedule and Start Times
Lincoln-Way 210 to Purchase 31 Buses, Citing Major Savings Over Leasing
Frankfort Fire Board Devotes Over 11 Hours to Private Fire Chief Search Meetings
Frankfort 157-C Board Directs Administration to Pursue 4.39% Tax Levy Increase
Frankfort Park District to Pursue Referendum for $25-29 Million Indoor Recreation Center
Frankfort Square Park District Board Approves 25% Increase in Proposed Tax Levy
War Department, VA have highest number of unresolved audit recommendations
Nearly 550 truck drivers cited for not understanding English in Illinois YTD
Envelopes with white powder sent to two Texas ICE offices, no public threat
Georgia GOP thanks Greene; Trump says she ‘went bad’