Village Secures $1.6 Million Grant for Laraway and Pfeiffer Road Multi-Use Path
Village of Frankfort Board Meeting | December 1, 2025
Article Summary: Frankfort officials authorized agreements with the Illinois Department of Transportation (IDOT) to utilize over $1.6 million in grant funding for a new multi-use path. The project will close a 1.5-mile gap in the local trail network along Laraway and Pfeiffer Roads.
Multi-Use Path Project Key Points:
-
Grant Amount: $1,632,175 awarded through the Illinois Transportation Enhancement Program (ITEP).
-
Project Scope: A new path along the east side of Pfeiffer Road (Sauk Trail to Laraway Road) and the north side of Laraway Road (Pfeiffer Road to 80th Avenue).
-
Cost Breakdown: The grant covers 80% of engineering costs (
240,420),withtheVillageresponsiblefortheremaining2060,105).
-
Objective: To close a 1.5-mile gap in the existing trail network.
FRANKFORT – The Village of Frankfort is moving forward with a significant infrastructure improvement to its trail system after the Village Board approved funding agreements with the Illinois Department of Transportation (IDOT) on Monday, December 1, 2025.
The Board adopted a resolution authorizing a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement for the Laraway Road/Pfeiffer Road Multi-Use Path project.
“The Village of Frankfort seeks to participate in the construction of a multi-use path… closing a 1.5-mile gap in the existing trail network,” said Trustee Dan Rossi.
The path will be constructed along the east side of Pfeiffer Road from Sauk Trail to Laraway Road, and along the north side of Laraway Road from Pfeiffer Road to 80th Avenue.
Trustee Rossi noted that the Village was awarded a $1,632,175 grant for the project through the Illinois Transportation Enhancement Program (ITEP).
The resolution also authorized an agreement with Robinson Engineering, Ltd. to provide preliminary and design engineering services. The total cost for these services is $300,525. Under the terms of the grant, state funds will cover $240,420 (80%), leaving the Village’s local share at $60,105 (20%).
Trustee Maura Rigoni abstained from the vote on this specific item, noting for the record that she is a part-time employee of Robinson Engineering. The measure passed with the support of the remaining trustees.
Latest News Stories
Maine Democrats lining up to replace Platner in Senate race
Trump: U.S. to ‘probably’ strike Iran tonight; oil prices rise
Class action vs Apple over Face ID scans seeks to unlock big payout
Another fatal ICE shooting, this time in Houston
Census shows Illinois under-20 population declining faster than national average
U.S. launches ‘powerful strikes’ against Iran, halts oil sales
Trump praises Erdoğan, pressures Europe on NATO and defense
Installation of Big Bend border wall set for August in Texas
Chicago mayor to Trump: “Consider this a call”
Chicago aldermen latest calling for US attorney’s ouster over ‘Broadview Six’ case
Trump demands Republicans attach voter ID bill to $350 billion for Pentagon
Appeals court hears arguments in religious contraception case