solar panels photovoltaics in solar farm

New Lenox to Host Large Pollinator-Friendly Solar Farm

Spread the love

Will County Board Meeting | November 2025

Article Summary: The Will County Board unanimously approved a special use permit for a commercial solar energy facility spanning approximately 63 acres in New Lenox Township. The project, located on South Spencer Road, will feature over 12,000 solar panels and includes plans for native pollinator vegetation.

Spencer Road Solar Key Points:

  • Location: A 110-acre parcel on South Spencer Road, south of 1100 S. Spencer Road, New Lenox. The solar facility will occupy ~63 acres.

  • Scale: Two facilities (2.4 MW and 2.85 MW) comprising 12,029 solar panels on single-axis trackers.

  • Pollinator Focus: The board granted variances for plant height (up to 36 inches) and mowing frequency (once per year) to allow for deep-rooted native pollinator plants.

  • Community Impact: The Village of New Lenox did not object to the project, subject to screening conditions which were included in the approval.

NEW LENOX – A significant new solar energy development is coming to New Lenox Township following a unanimous 22-0 vote by the Will County Board on Thursday.

The project, developed by Nexamp Solar under the names “Spencer Road Solar East” and “Spencer Road Solar West,” will transform agricultural land into a solar farm capable of generating over 5 megawatts of power.

A key feature of this development is its designation as a “pollinator-friendly” site. To support this, the Board approved two specific variances: allowing ground cover plants to grow up to 36 inches (ordinance limit is 13 inches) and reducing the required mowing frequency to once per year.

“Native pollinators are typically plants that have deep root systems that recharge the agricultural soils… and are natural weed prevention,” County Land Use staff noted in their report.

While three objectors raised concerns about wildlife disruption and aesthetics during the public hearing process, the project received a letter of non-objection from the Village of New Lenox, provided that landscape screening is installed along the western fence line. The project will also feature an 8-foot “fixed knot” farm fence rather than chain link, a requirement intended to be more wildlife-friendly.

The Forest Preserve District of Will County also weighed in, encouraging the developer to select native species that support the local ecosystem. The project is expected to bring 20 to 25 construction jobs to the area.

Leave a Comment





Latest News Stories

summit-hill-junior-high-school-frankfort-161

Summit Hill 161 Approves $48K Tech Upgrade, Board Divided on New Teacher Hire

Article Summary: The Summit Hill District 161 Board of Education approved a five-year, $48,305 agreement for a virtual server upgrade and separately hired a new junior high teacher in a contentious...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Village Board for September 8, 2025

The Frankfort Village Board's meeting on Monday, September 8, 2025, was highlighted by a resident's pointed questions regarding the village's process for exploring a potential switch to Lake Michigan water....
Frankfort Village Board Meeting Graphic

Frankfort Resident Questions Village’s Lake Michigan Water Survey Process

Article Summary: A Frankfort resident publicly questioned the village's handling of a recent water source survey during the village board meeting, arguing it was released with limited research and a...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Public Library District for July 24, 2025

The Frankfort Public Library District board on Thursday, July 24, 2025, addressed a major loan payment error by its bank, paused a planned reading room project due to high costs,...
Joliet-Junior-college.-Graphic-Logo.3

JJC Moves Forward with Major Technology Overhaul to Modernize College Operations

Article Summary: The Joliet Junior College Board of Trustees received a detailed update on a sweeping Enterprise Resource Planning (ERP) project, a major initiative designed to modernize the college's core...
Joliet-Junior-college.-Graphic-Logo.2

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for August 20, 2025

The Joliet Junior College Board of Trustees focused on a major technological overhaul, celebrated milestones in student support, and addressed internal governance issues at its regular meeting on August 20,...
Joliet-Junior-college.-Graphic-Logo.4

Tensions Flare as JJC Chairman Rebukes “Entitlement” After Trustee Lists Demands

Article Summary: Apparent tensions on the Joliet Junior College Board of Trustees surfaced during its meeting on Wednesday, August 20, 2025, when one trustee requested to be returned to "good...
frankfort illinois library logo graphic.5

Library to Host Naloxone Distribution Box to Combat Opioid Overdoses

Article Summary: The Frankfort Public Library will become a host site for a naloxone distribution box in partnership with the Will County Health Department, making the life-saving opioid overdose reversal...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District for July 15, 2025

The Frankfort Fire Protection District Board of Trustees on Tuesday, July 15, 2025, considered several significant financial and equipment matters. The board was scheduled to approve a $91,955 purchase of...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Park District Board of Commissioners for July 8, 2025

The Frankfort Park District Board of Commissioners on Tuesday, July 8, 2025, approved a major planning expenditure, authorizing $131,500 for agreements with Design Perspectives. The funds will be used for...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District Board of Trustees for July 15, 2025

The Frankfort Fire Protection District Board of Trustees took major steps toward addressing long-term financial and operational needs at its meeting on July 15, 2025. The board directed its interim...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Square Park District for July 17, 2025

The Frankfort Square Park District Board of Commissioners on Thursday, July 17, 2025, heard positive updates on major capital projects and celebrated the national success of its BDC dance program....
frankfort fire district graphic logo.4

Frankfort Fire District Faces Tighter Budget, Rising Overtime in FY 2025 Outlook

Article Summary: A preliminary review of the Frankfort Fire Protection District's fiscal year 2025 budget indicates a smaller surplus than the previous year, driven by rising overtime costs and an...
fall-festival-b2adf834-992f-4ebd-ac09-edfc1d11b40a-circle

Your Ultimate Guide to the 2025 Frankfort Fall Fest: Everything to Know for the Nationally-Ranked Event

FRANKFORT, IL – The heart of historic downtown Frankfort is set to transform into a vibrant hub of art, music, and community spirit for the 57th annual Frankfort Fall Festival. Running...
frankfort illinois library logo graphic.1

Frankfort Library Tables Reading Room Project Over Higher-Than-Expected Engineering Costs

Article Summary: The Frankfort Public Library Board of Trustees voted to table a proposal from architectural firm StudioGC for a planned reading room project after engineering fees came in significantly...