Trump blasts cost overruns at Obama Presidential Center in Chicago

Trump blasts cost overruns at Obama Presidential Center in Chicago

Spread the love

(The Center Square) – Chicago is back in the mind of President Donald Trump, but this time the commander-in-chief’s focus is on delays and cost overruns at the Obama Presidential Center.

While campaigning for Democratic Party political candidates, former President Barack Obama criticized Trump over White House renovation projects and reductions in federal food assistance.

Trump referred to Obama’s comments during a speech Wednesday at the American Business Forum in Miami.

“‘I’m talking Donald Trump is a mean person.’ I’m not a mean person. I just want to have a country that’s great again, is that OK?” Trump said.

The Obama Presidential Center is scheduled to open next spring on Chicago’s South Side, although the project has been delayed several times and the estimated construction costs have surged from an initial number around $350 million to at least $830 million.

“Ask him how he’s doing on his museum library. He’s got hundreds of millions of dollars of cost overruns. It’s come to a dead halt. He built it in not a particularly good location. He’s not into real estate, you know, he doesn’t know about location,” Trump said.

The president called out Obama again during an unrelated announcement at the White House on Thursday.

“The beautiful Obama building that he’s building in Chicago for the museum, which is now shuttered up, and they couldn’t finish it, what did you say, about five years behind schedule and about 2,000% over budget, then he tells us how to run Medicaid,” Trump said.

The Obama Presidential Center did not immediately respond to a request for comment.

The development has faced criticism from environmental groups and community advocates on Chicago’s South Side. The project resulted in hundreds of trees being cut down in Jackson Park.

Earlier this year, an engineering firm working on the center said claims it racially discriminated against a Black-owned subcontractor on the project were baseless. The New York-City-based engineering firm was responding to a lawsuit accusing it of acting with racist intent when it criticized the alleged underperformance of a Black-owned concrete subcontracting firm. The suit drew national attention to the diversity, equity and inclusion goals connected to the project.

Groundbreaking for the center was held in 2021. According to the Obama Foundation website, the Obama Presidential Center is scheduled to open in 2026.

Catrina Barker and Kevin Bessler contributed to this story.

Leave a Comment





Latest News Stories

Miller files ‘parental rights’ constitutional amendment, blasts Illinois’ policies

Miller files ‘parental rights’ constitutional amendment, blasts Illinois’ policies

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Illinois U.S. Rep. Mary Miller says parental rights are being diminished and it’s time they speak up....
Department of Energy returning $13B climate agenda funding to taxpayers

Department of Energy returning $13B climate agenda funding to taxpayers

By Tate MillerThe Center Square The U.S. Department of Energy will be returning to American taxpayers $13 billion in “unobligated wasteful spending” that was originally intended for former President Joe...
Trump directs war secretary to send troops to Portland to protect ICE

Trump directs war secretary to send troops to Portland to protect ICE

By Sarah Roderick-FitchThe Center Square Troops will be sent in to protect immigration and customs enforcement facilities “under siege” in Portland, President Donald Trump said Saturday morning. The president cited...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
Trump says he won't back down on Antifa terrorism designation

Trump says he won’t back down on Antifa terrorism designation

By Brett RowlandThe Center Square President Donald Trump is moving quickly against an organization that he blames for destruction, looting and protests, another indication the president is acting faster during...
Exclusive: DOJ 'weaponization' victim still in jail, asking for Trump pardon

Exclusive: DOJ ‘weaponization’ victim still in jail, asking for Trump pardon

By Bethany BlankleyThe Center Square After former FBI Director James Comey was indicted on Thursday and as Congress continues to investigate the “weaponization” of the Biden Department of Justice, one...
Champaign stabbing raises concerns over Illinois mental-health law

Champaign stabbing raises concerns over Illinois mental-health law

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A state lawmaker who also serves as a police officer says the recent stabbing of non-police...
Frankfort School District 157-C.1

Frankfort 157-C Approves Tentative Budget, Projects $47.8 Million in Revenue for FY26

Article Summary: The Frankfort School District 157-C Board of Education approved a tentative budget for Fiscal Year 2026 that projects nearly $48 million in revenue, a 2% increase from the...
frankfort village hall graphic logo.8

Frankfort Police Department Welcomes New Officer Brendan Huffman

Article Summary: The Frankfort Police Department officially welcomed its newest member, Officer Brendan Huffman, who was sworn in during a ceremony at the Village Board meeting. Huffman, who recently relocated...
Colorado tops nation for millennial migration, report finds

Colorado tops nation for millennial migration, report finds

By Elyse ApelThe Center Square Millennials are flocking to Colorado, according to a recent report that looked at migration rates nationwide. In 2024, nearly one in every 10 millennials in...
Congress unmoved by imminent government shutdown threat

Congress unmoved by imminent government shutdown threat

By Thérèse BoudreauxThe Center Square Only four days remain until the federal government runs out of money and partially shuts down, but Republican and Democratic leaders in Congress refuse to...