Estimated power demand will outstrip supply by 2032

Estimated power demand will outstrip supply by 2032

Spread the love

(The Center Square) – The impact on electricity demand from a growing number of data centers is a recurring point of concern among energy leaders who warn that, without swift policy reform, unchecked growth could drive up costs and threaten reliability.

A recent briefing hosted by nonprofit consumer watchdog Citizens Utility Board of Illinois, or CUB, explored the issues facing the PJM region.

Panelists from CUB and the Natural Resources Defense Council, or NRDC, suggested potential solutions that would protect consumers and acknowledged an urgent need for coordinated action, they say, to contain costs and safeguard reliability.

CUB’s Jim Chilson noted that consumers are often unaware their electric bills include capacity charges – payments that cover the power they use, but also the cost of maintaining extra generation for times of peak demand.

He highlighted that after years of flat consumption demand, PJM estimates that by 2031 data centers could add 22-30 GW of new demand, or enough electricity for more than 10 million homes, while expecting only 6-12 GW of new supply, or enough to power as many as 2.6 million homes. This imbalance, he said, has led to record-high capacity prices for which consumers will be paying for through at least May 2027 – something the panelists fear will become a “new normal.”

Without reforms, the NRDC estimates cumulative capacity costs could reach $163 billion from 2027 through 2033.

Claire Lang-Ree, NRDC clean energy advocate, stated that average utility bills have already increased by $20-$30 due to the price increase in the grid’s last auction, and it will get worse through the coming decade if nothing is done. “We’re estimating that average bills could increase by another $70 per month,” she added.

Panelists found fault with PJM’s Critical Issue Fast Path, or CIFP – an initiative launched in August to fast-track discussions and policy decisions aimed at managing rapid growth of large load customers like data centers.

The current proposal, they say, does not require data centers to reduce energy consumption during peak demand; rather, it is voluntary, which increases the risk of rolling blackouts.

They were also critical of the proposed 10-month fast track for new data center-related resources that would allow them to jump ahead in the interconnection queue, which is dominated by clean energy projects – some that have been waiting years for approval.

A better approach stressed Clara Summers, CUB’s Consumers for a Better Grid campaign manager, would require data centers to cover their own costs and bring their own capacity.

Lang-Ree added that by removing large loads out of the capacity market until they bring their own supply may bring capacity prices back down to historic levels of around $60 billion versus the $163 billion projected.

Other measures proposed include implementation of reforms such as separate tariffs, the need for accurate load forecasting, and incentives for new, fast-to-build, clean energy supply.

Stressing that accurate load forecasting is essential to controlling costs and maintaining reliability, she warned that many projects never get built, but their projected demand is used in pricing – driving up capacity pricing for everyone.

By requiring stricter standards such as financial commitments and proof of constructability from developers, consumers won’t be forced to pay for power that is never used, she said.

Summers also highlighted that battery storage is the fastest source to build. Citing analysis by Brattle, she said battery storage can be built in about 20 months or less, as opposed to a gas fired power plant which could take 44 to 50 months. She added that the batteries can store power from today’s resource mix to handle peak capacity needs and are just as reliable as a new gas plant.

Governors of PJM states are among the grid operator’s critics. They recently attended a summit convened by Gov. Josh Shapiro to discuss reforms and having a larger voice in PJM’s governance.

According to PJM, as of August, a total of 46,000 MW of new generation has signed interconnection agreements and are ready to construct, which once operational, could supply as many as 46 million homes. Many of the projects, however, are hampered by factors outside of their control – such as siting and permitting challenges, supply chain backlogs, and financial dynamics.

PJM’s stakeholders are scheduled to vote on a final proposal regarding the allocation of costs for new electric infrastructure on November 19.

Leave a Comment





Latest News Stories

Court OKs $45M verdict in talc asbestos case, including $30M for ‘reduced lifespan’

Court OKs $45M verdict in talc asbestos case, including $30M for ‘reduced lifespan’

By Jonathan Bilyk | Legal NewslineThe Center Square (Legal Newsline) - An Illinois appeals court has thrown open a new avenue for personal injury lawyers and others to claim potentially...
Taxpayers to fund $424.9M soccer stadium infrastructure

Taxpayers to fund $424.9M soccer stadium infrastructure

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Chicago Fire may be building their own soccer stadium, but city taxpayers will be on the...
Illinois Quick Hits: Benton pulls name from ballot after resignation

Illinois Quick Hits: Benton pulls name from ballot after resignation

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Former state Rep. Harry Benton, D-Plainfield, who resigned from his seat in the Illinois House of Representatives...
Income tax cut on Missouri ballot; Illinois may see more outmigration

Income tax cut on Missouri ballot; Illinois may see more outmigration

By Sean Reed | The Center SquareThe Center Square (The Center Square) – A ballot measure in front of Missouri voters next month could give some Illinois residents in the...
Feds: Chicago is key in trade fraud fight

Feds: Chicago is key in trade fraud fight

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Federal officials came to Illinois this week to announce the results of a major crackdown on trade...
Vance says Milwaukee mayor protesting ‘too much’ over election probe

Vance says Milwaukee mayor protesting ‘too much’ over election probe

By Benjamin YountThe Center Square Vice President JD Vance isn’t buying the outrage from Milwaukee’s mayor over the Trump Administration’s investigation into the 2020 election in Milwaukee. "I will say...
Illinois Quick Hits: $63M construction research center completed

Illinois Quick Hits: $63M construction research center completed

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – State officials have marked the completion of the $63 million Materials Testing and Research Center at Illinois...
Illinois attorney general has paid private attorneys $2 million in recent years

Illinois attorney general has paid private attorneys $2 million in recent years

By Jared Strong | The Center SquareThe Center Square (The Center Square) – Illinois' top state attorney has paid more than $2 million in the past three years to private...
Platner drops campaign for Maine's U.S. Senate seat

Platner drops campaign for Maine’s U.S. Senate seat

By Christen SmithThe Center Square Graham Platner, the controversial Democratic nominee for Maine’s U.S. Senate seat, dropped out of the race Wednesday amid intense scrutiny over new sexual assault allegations...
Hundreds of thousands of acres burn as fires spread in West

Hundreds of thousands of acres burn as fires spread in West

By Liam HibbertThe Center Square Fires across the southwestern U.S. have picked up early this year, with over 400,000 acres burning just between Utah and Colorado. The quick and early...
Feds buy two immigration detention centers for $1.5 billion

Feds buy two immigration detention centers for $1.5 billion

By Chris WoodwardThe Center Square Private prison operator CoreCivic has sold two Southern California immigration detention centers to the federal government for $1.5 billion. Under the deal, the U.S. Department...
Toyota set to construct $3.6 billion expansion in San Antonio

Toyota set to construct $3.6 billion expansion in San Antonio

By Robert MattesonThe Center Square Toyota announced that it will invest in a $3.6 billion expansion at its San Antonio manufacturing campus, creating 2,000 new high-quality jobs. The investment will...
Republicans silent, Democrats irate at Iran ceasefire collapse

Republicans silent, Democrats irate at Iran ceasefire collapse

By Thérèse BoudreauxThe Center Square With military hostilities between the U.S. and Iran resuming only weeks after the nations signed a peace deal, Democrats in Congress are demanding that the...
Chicago aldermen consider election reforms, cost savings

Chicago aldermen consider election reforms, cost savings

By Sean Reed | The Center SquareThe Center Square (The Center Square) – The Chicago City Council is considering new election reforms that supporters say could increase voter access and...
U.S. launches more strikes against Iran

U.S. launches more strikes against Iran

By Andrew RiceThe Center Square The U.S. military is launching more strikes against Iran at the direction of President Donald Trump. U.S. Central Command said the military started launching additional...