Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Leave a Comment





Latest News Stories

'The Art of the Heal': How TrumpRx, most-favored nation pricing, Big Pharma intersect

‘The Art of the Heal’: How TrumpRx, most-favored nation pricing, Big Pharma intersect

By Morgan SweeneyThe Center Square AstraZeneca has now joined Pfizer in agreeing to sell its drugs to state Medicaid programs at “most-favored-nation” pricing and deeply discounted rates on TrumpRx.gov But...

GOP stands up for U.S. military strikes on suspected drug boats

By Brett RowlandThe Center Square President Donald Trump and the Pentagon show no signs of changing course on using military strikes to destroy suspected drug boats in the Caribbean. "We...
IL lawmakers could address energy prices, transit, taxes during veto session

IL lawmakers could address energy prices, transit, taxes during veto session

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois General Assembly’s fall veto session begins Tuesday, and taxes are expected to be part of...
Screenshot 2025-10-10 at 11.39.54 AM

Committee Advances 50% Increase in Mental Health Levy on 4-3 Vote

Will County Finance Committee Meeting October 7, 2025 Article Summary: The Will County Finance Committee on Tuesday narrowly approved a proposed $12 million levy for the Community Mental Health Board,...
Meeting Briefs

Meeting Summary and Briefs: Summit Hill School District 161 for September 17, 2025

Summit Hill School District 161 Board Meeting | September 17, 2025 The Summit Hill School District 161 Board of Education held its regular meeting on Wednesday, September 17, 2025, where...
Screenshot 2025-10-10 at 11.19.48 AM

Will County Poised to Launch Major Mental Health Initiative Based on Joliet Program’s Success

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Board Public Health & Safety Committee on Thursday considered establishing "Will County CARES," a...
Screenshot 2025-10-10 at 12.05.35 PM

Looming State Energy Bill Threatens to Further Limit County Control Over Solar and Wind Projects

Will County Legislative Committee Meeting October 7, 2025 Article Summary: A state energy bill likely to be considered during the fall veto session or next spring could further strip Will...
Screenshot 2025-10-10 at 11.52.31 AM

Controversial Immigrant Rights Resolution Postponed by Will County Board After Heated Debate

Will County Executive Committee Meeting October 9, 2025 Article Summary: The Will County Executive Committee voted to indefinitely postpone a contentious resolution titled "Declaring Will County's Commitment to Ensure Communities...
Trump says US troops will get paid Oct. 15 despite funding lapse

Trump says US troops will get paid Oct. 15 despite funding lapse

By Brett RowlandThe Center Square President Donald Trump said Saturday that America's 1.3 million military service members will get paid on Oct. 15 despite a congressional budget lapse that led...
$4.5B awarded in new contracts to build Smart Wall along southwest border

$4.5B awarded in new contracts to build Smart Wall along southwest border

By Bethany BlankleyThe Center Square Roughly $4.5 billion in contracts have been awarded to expand border wall construction, including adding advanced technological surveillance along the southwest border. Ten new construction...
Do No Harm expects FTC to take action to protect minors from transgender procedures

Do No Harm expects FTC to take action to protect minors from transgender procedures

By Tate MillerThe Center Square (The Center Square ) – After submitting comments to the Federal Trade Commission's public inquiry on how the child transgender industry has harmed and deceived...
2024 was deadliest year for journalists on record

2024 was deadliest year for journalists on record

By Bethany BlankleyThe Center Square Last year was the deadliest year for journalists on record, with the Gaza Strip being the deadliest location, according to multiple reports. Totals vary depending...
Govt shutdown raises concerns over national security

Govt shutdown raises concerns over national security

By Andrew RiceThe Center Square As partisan divides appear to deepen and prolong the partial government shutdown, bipartisan lawmakers said they are concerned about national security effects of the funding...
Ex-speaker Madigan to begin 7.5-year prison sentence Monday

Ex-speaker Madigan to begin 7.5-year prison sentence Monday

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – One day before the Illinois General Assembly’s fall veto session is scheduled to begin, one of the...
Screenshot 2025-10-10 at 11.39.50 AM

Will County’s Gas-to-Energy Plant Reports Nearly $460,000 Net Loss Amid Operational Setbacks

Will County Finance Committee Meeting October 7, 2025 Article Summary: Will County's Renewable Natural Gas (RNG) plant at the county landfill posted a net loss of nearly $460,000 for the...